Electron Beam Systems ETC and Methodology

Slides:



Advertisements
Similar presentations
Jose Chan FAC- Undulator System Installation & Assembly 10/30/07 1 Undulator System Installation & Assembly Schedule Jose.
Advertisements

Richard M. Boyce FAC Review – Accelerator Installation October 29-31, Installation – Accelerator Systems Installation Planning.
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
FAC, 4/20/06 D. Schultz 1 e-Beams System Update Linac System Preparing for downtime installation. Injector System Installation has started. Undulator System.
Richard M. Boyce FAC April 16, LCLS Installation & Planning Integration process – IMT 2007 Installation Planning BTH.
FAC, 4/16/07 D. Schultz 1 e-Beams Systems Update People ARR Linac Installation Undulator Production MMF Operations David Schultz.
Richard M. Boyce FAC October 29-31, Installation Planning Integration process – IMT update Installation Planning &
LCLS Linac System Management Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
D. Schultz FAC 6/17/08 1 e-Beams Systems Update People Progress the last review LTU and Dump Installation Status Undulator.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
Hamid Shoaee LCLS FAC Controls June 17, LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.
E. Bong, SLACLCLS FAC Meeting - April 29, 2004 Linac Overview E. Bong LCLS FAC Meeting April 29, 2004 LCLS.
David H. Dowell Injector April 29-30, 2004 LCLS Injector Overview D. H. Dowell, SLAC FAC Review April 29-30, 2004 Injector.
9/22/04J. Welch, LCLS Commissioning Worskhop, SLAC LCLS Commissioning Schedule and Startup Plan LCLS Commissioning Schedule and Startup Plan.
Hamid Shoaee LCLS FAC Review – October Control System Overview Hamid Shoaee Controls System Manager Injector control system commissioning & Support.
C.E. Rago Inj/Lin Design & 4_20_06 1 Injector / Linac Design & Fabrication C.E. Rago FAC Review 04_20_06.
Arturo Alarcon Undulator Controls Module Status 11/12/2008 SLAC National Accelerator Laboratory 1 Undulator Controls Module Status.
Hamid Shoaee Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory Controls Department LCLS Maintenance.
FAC, 10/12/06 D. Schultz 1 Readiness for 2007 Startup Linac Injector Controls ARR David Schultz.
David Schultz Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory 1 Undulator Complex Status LCLS Introduction.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
John N. Galayda LCLS Accelerator Readiness December 2, LCLS Overview December 2, 2008 Project Construction Status.
David Saenz EIR Review Oct 9-11, Conventional Facilities (CF) WBS 1.9 ETC and Methodology David Saenz CF Systems Manager.
Accelerator Operations Department Readiness (Part 2)
Experimental Facilities Planning
Maintain a single control room for all accelerator programs
LCLS Linac Update Brief Overview L1 & BC1 Progress LTU & E-Dump Status Continuing Resolution Impact.
Injector –Linac Status & Schedule E. Bong LCLS FAC October 12, 2006
LTU/Undulator Installation Status
Undulator Scope, Management, and Organization
LINAC OPS Budget Review
Far Experimental Hall Hutches Civil Construction
e-Beams Systems Update
Injector / Linac Installation Current Status
LCLS Linac Overview E. Bong Lehman Review August 10, 2004
X-Ray Endstations Update
Conventional Facilities (WBS 1
Details supporting the increase
DOE Review of the LCLS Project
Project Management Issues John N. Galayda, SLAC April 24, 2002
Project Status Review May 13-15, 2008.
LCLS Undulator System Status and Schedule
Conventional Facilities WBS 1.9
Integrated Safety and Environmental Management
Electron Beam Systems Wrap-up
NEH - Status Stefan Moeller.
Conventional Facilities Status
Shutdown Planning & Installation Schedule
LCLS Personnel Protection System and Beam Containment System
E-Beams Systems Manager
LTU/Undulator Installation Status
LCLS Undulator System Status and Schedule
Control System Overview Hamid Shoaee LCLS Control System Manager
LCLS Operation in 2009 Roger A. Erickson
Linac Coherent Light Source Transition to Operations 11 July 2007
Installation Status & Operational Readiness Process
Department Of Energy Review Linac Coherent Light Source Project
P. Emma, for the LCLS Commissioning Team LCLS DOE Review May 14, 2009
Electron Beam Systems ETC and Methodology
Injector/Linac Design Status C. E
Undulator Assembly and Installation Planning
LCLS e- Beams System Overview
CF Scope, Management & Organization
e-Beams Systems Update
X-Ray Endstation Systems (XES) 2006 Schedule
LINAC System Engineering / Design Status C.E. Rago
LCLS Control System Personnel Linac & BC2 Controls progress
LCLS e- Beams Systems Manager
Injector/Linac RF Status
Control System Overview Hamid Shoaee LCLS Control System Manager
Presentation transcript:

Electron Beam Systems ETC and Methodology David Schultz E-Beams Systems Manager Electron Beam Systems Definition of terms Schedule Overview Start-Up Test Plan E-Beams Costs Risk Analysis

E-Beams Systems layout Sector 21 Sector 20 Laser lab BC1 LX L1 Injector Injector Commissioning complete

The electron gun in the Injector Laser beam transport Electron gun

E-Beams Systems layout 6 MeV 135 MeV 250 MeV 4.30 GeV 13.6 GeV Linac-0 L =6 m Linac-X L =0.6 m rf gun Linac-1 L 9 m Linac-2 L 330 m Linac-3 L 550 m Commissioned Now Installing ...existing linac X undulator L =130 m BC2 L 22 m BC1 L 6 m LTU L =275 m Injector/BC1 L2/BC2/L3 SLAC linac tunnel research yard

E-Beams Systems layout Beam Transport Hall Transport the electron beam to the Undulator Undulator Hall Underground tunnel housing the undulator. Controls Beamline and diagnostics control for e-beams systems. SLAC Linac LCLS uses the last 1/3 of the existing Linac. Electron Beam Dump Underground facility for the beam dump. Near and Far Halls – Areas for x-ray experiments

E-Beams Systems WBS structure Injector WBS 1.02, 2.02 Jose Chan, Control Account Manager Laser/Gun/L0/Spectrometer – Installed and commissioned Create electrons, accelerate, analyze beam quality Laser Heater Accelerator R&D activity

E-Beams Systems WBS structure Linac WBS 1.03, 2.03 Jose Chan, CAM L1/Lx/BC1 – Installed and commissioned Accelerate the beam, initial beam bunch compression L2/BC2/L3 Full beam acceleration, second compression of bunch LTU Transport electron beam from Linac to Undulator Electron dump Safely dispose of the electron beam

E-Beams Systems WBS structure Undulator WBS 1.04, 2.04 Generate x-rays as the high power electron beam passes through. Undulator Systems at ANL, Geoff Pile, CAM Fabricate components and supports for the Undulator system Undulator Integration at SLAC, Rodd Pope, CAM Tune, fiducialize, assemble, and install the Undulator system

E-Beams Systems WBS structure Accelerator Controls WBS 1.02.02, 2.02.02, 1.03.02, 2.03.02, 1.04.02, 2.04.02 Hamid Shoaee, CAM Controlling hardware, cable plant and software for Injector, Linac and Undulator Systems Commissioning WBS 2.01.01, 2.02.17, 2.03.07, 2.04.06 David Schultz, CAM LOE manpower for LCLS personnel and maintenance groups during the electron beam commissioning process.

System Design Management System engineering resource loaded schedule is controlled through P3. Design process: Interface Control Documents specify which group has responsibility for each system. Physics Requirements Documents are written by the LCLS Physics group specifying subsystem needs. Engineering group holds Design Reviews, and writes Engineering Specification Documents to detail how the PRD is to be satisfied. Physicists and Engineers sign-off on component assembly and testing prior to installation.

E-Beams Systems Level 3 Milestones L3 milestones sufficient and properly distributed to monitor performance.

E-Beams Systems Level 3 Milestones

LCLS Installation and Commissioning Time-Line X-ray tunnel/FEH Install LTU/Und/Dump Install FEH X-rays milestone Flux milestone CF Early Occupancy CD-4 (7/30/10) FEE/NEH Install S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M 2007 2008 PPS 2009 PPS 2010 LTU/Und Commissioning Tunnel/FEH Commissioning Linac/BC2 Commissioning Linac/BC2 Install FEE/NEH Commissioning

Start Up Test Planning LCLS Safety Assessment Document is due 7/2008 LCLS Accelerator Readiness Review is needed 10/2008 Systems installed, checked out, signed off by responsible parties. Safety officers’ sign­offs on approvals and installations. Safety specific systems (Personnel Protection) certified. Maintenance groups have procedures and training in place. Procedures in place for Operations, and Operators trained. Beam Authorization Sheet prepared. Detailed commissioning schedule and performance goals are produced by the LCLS Physics group. Approval to begin commissioning given by the Director’s office

E-Beams Systems Cost Estimation As installation is approaching, systems are well defined. Installation costs Based on experience in 2006 Injector installation. Hardware install estimate done top-down and bottom-up. Based on experience on undulator prototype at ANL. Cable plant install estimated using R.S. Means. Fabrication/procurement Costs based on quotes and experience with prototypes at SLAC and ANL. Engineering and Commissioning Timetable for completion well understood.

Risk Assessment Design maturity and cost/schedule exposure are used in the contingency analysis for all DCE activities. Major risks are identified as Risk Registry entries, and assessed and maintained by the System Manager. The Senior Management team reviews the Registry monthly. Summary of E-Beams Systems entries: Linac (2) Risk: Linac diagnostics may need to be enhanced to have sufficient sensitivity for FEL commissioning. Mitigation: The upcoming BC2 commissioning will determine if an upgrade is warranted.

Risk registry Summary of entries (cont.): Undulator (3) The assembly of the Undulator Girders is a pacing item for Undulator commissioning. Several components from ANL are close to being the limiting factor Risk: Any rework or modification of parts at SLAC will delay girder assembly. Mitigation: We have multiple weekly video meetings with ANL and quarterly Undulator collaboration meetings to ensure coordination. Integration engineers at ANL and at SLAC have been established to coordinate the receipt and assembly.

Summary Electron Beams Systems are approaching final installation. Systems are well defined, Based on Project documentation. Resource loaded schedule in P3. Costs have a solid basis. The start up test plan is based on the successful turn-on of the LCLS Injector. Identified risks are being controlled.