Starting points for discussion on the Wind Turbine Design Competition (REMARK: also read the notes to the sheets)

Slides:



Advertisements
Similar presentations
Ed Dammers Copenhagen, 12 November Usability of scenarios in different domains of policy-making.
Advertisements

1 Chapter 2: Product Development Process and Organization Introduction Importance of human resources: Most companies have similar technology resources.
1.  Purpose  To present Staff’s Preliminary Findings on the 2012 Integrated Resource Plans of:  APS – Arizona Public Service Company  TEP – Tucson.
TALOS Total ATM Life-cycle operational Solution. The Cost equation Life cycle costs are high Life cycle costs are complex Life cycle costs involve all.
SMART Devices in Utilities Béla Bakos Innovation advisor
Effective Coordination of Multiple Intelligent Agents for Command and Control The Robotics Institute Carnegie Mellon University PI: Katia Sycara
© 2004 Managing the Information Technology Resource, Jerry N. LuftmanChapter 3 - Slide 1 Chapter 3 Strategic Alignment Maturity Managing the Information.
COBIT Framework Introduction. Problems with IT? – Increasing pressure to leverage technology in business strategies – Growing complexity of IT environments.
RELIABILITY AFFORDABILITY ENVIRONMENTAL STEWARDSHIP LED Roadway Lighting Initiative April 9, 2013.
Development plan and quality plan for your Project
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review 51-Mile Hydroelectric Power Project PI: Jim Gordon Earth By Design, Inc.
Learning goals At the end of the class today, you will be able to: Define “model” Describe a model development process Engage in understanding a given.
Quality Management Systems: A Comparison of GE Energy & Škoda Power Katarina Hranaiova Christina Gasserova Jessica McKennaova SPRING 2007.
1 Public Safety Wireless Network – State of Wyoming.
Dr. István Fekete: The Role of Integrated Risk Management in Organizations April11th, Budapest.
Vancouver User Group Presented by Trevor Moore
Freeport Generating Project Project Description Modernization projects at Power Plant #2 Developers – Freeport Electric and Selected Development Company.
Knowledge Management Assessment of an Organization
The Smart Grid Enabling Energy Efficiency and Demand Response Clark W
BIOTECH SUPPLY October 8-9, 2012 Crowne Plaza, Foster City, CA Solving the Missing Link Between Forecasting and ERP in Clinical Supply Optimization Michelle.
Sommerville Power Engineering Ltd. Introduction & Overview Company Number , registered in England & Wales. SPE August 2015.
Quality assurance / Quality control system for the Greek GHG emissions inventory Yannis Sarafidis, Elena Georgopoulou UNFCCC Workshop on National Systems.
Wind Turbine Design and Implementation Phase III Senior Design May Team Andrew Nigro (EE) Chad Hand (EE) Luke Rupiper (EE) Ryan Semler (EE) Shonda.
1 D Jobber, Principles and Practice of Marketing, © 1998 McGraw-Hill Principles and Practice of Marketing David Jobber Chapter 1 Marketing in the Modern.
Implementing the Master Plan on ASEAN Connectivity (MPAC) Gizella Marie A. Herrera ASEAN Connectivity Division ASEAN Secretariat High Level Seminar on.
Standards: Paving the way for innovation Glenn Tubrett Program Manager, Energy and Utilities Canadian Standards Association.
Workgroup #3 High Impact Energy Efficiency Initiatives John Savage Stan Price.
Centre for Strategic Manufacturing © Veronica Martinez Understanding Value Creation: The Value Matrix and The Value Cube Veronica Martinez.
Learning Objectives To learn the methods that a firm might employ to successfully achieve each of the four building blocks of competitive advantage.
Leadership, the key to unlocking global markets A practical experience within SUEZ “Bringing you the essentials of life” Jean-Claude STEFFENS Sr VP Environment.
Intelligent Performance Management Empowering Your Enterprise Duane E. Presti, CEO PARIS Technologies, Inc.
1 FTA Research Programs Ronald Hynes Acting Associate Administrator for Research, Demonstration, and Innovation April 17, 2007.
ISPE China Annual Conference 2012 April Beijing 1 Current situation and solutions of Chinese GMP implementation Wu Jun
L. David Glatt North Dakota Department of Health Environmental Health Section.
Grant Management Seminar Session 1 1 Session 1 Designing a Project 10/13/2012.
Guidelines for LDS preparation for Croatian LAG’s Estonian Leader Union Kadri Tillemann and Kristiina Timmo 28 th of September, Zagreb.
GMS Services 19th October Solution Orientated.
«Media Monitoring Centre» Company Presentation Media Monitoring, Media Analysis, Information Services.
"The challenge for Territorial Cohesion 2014 – 2020: delivering results for EU citizens" Veronica Gaffey Acting Director EUROPEAN COMMISSION, DG for Regional.
Market and Customer Needs
Engineering Design and Development™. What is Project Lead the Way? Focus on learning through Rigor Relevance Retention Integration Motivation.
Project Presentation «Project title» for participating in the competition of innovative projects «IT Caspian» in the category «Category title»
Allister James – November 19, 2015
Wind Turbine Power Plant. Sources ●
PERFORMANCE MANAGEMENT STRATEGIES STRATEGIC HUMAN RESOURCE MANAGEMENT.
RTWG Report to TAC January 6, 2010 Henry Durrwachter.
Innovation Energy Storage E.ON Innovation Center Energy Storage.
Minimum Price $100. Minimum Price $45 Minimum Price $40.
To sustain a strong regulatory body.
First in Service First in Value
“ ” HYPERION APPLICATION OPERATION SUPPORT AOS SERVICE STREAMS
Strategic Management/ Business Policy
NUR 598 Enthusiastic Studysnaptutorial.com
WIND TURBINE GENERATORS.
PM 584 Education for Service/tutorialrank.com
Opportunities for the superwind concept in the region Fryslân
Strategic Control Control is taking measures that synchronize outcomes as closely as possible with plans Traditionally, has been almost completely based.
Advanced Management Control and Sustainable Development
Karen Bartleson, President, IEEE Standards Association
Ministry of Regional Development and Public Works
Jose GONZALEZ PASTOR Economic & Adequacy Analyst - Elia
Global Competitiveness
بسم الله الرحمن الرحیم.
12/8/2018 Title Page.
FERC Order in Devon Power LLC, et al. ER
Digital Solar Helping bring the power of sunshine to the world
3 BENEFITS TO CHOOSING TIME RISK VALUE
Software Engineering I
Activity on WFD and agriculture
Center for Analysis of Economic Reforms and Communication
Presentation transcript:

Starting points for discussion on the Wind Turbine Design Competition (REMARK: also read the notes to the sheets)

Small windturbines Problem Potential of small wind turbines is not utilized despite of their application and flexibility w.r.t. implementation. Reasons Quality backlog Disappointing Performance (efficiency, reliability) High specific price Knowledge gap Difficult to compare performance between turbines Problems with yield predictions in different (local) wind conditions About potential and possibilities for integration (part of the) solution Quality improvement (efficiency, cost, reliability) and innovation Increase knowledge base (performance data and comparability, predictability of energy production, operational experience, requirements for acceptance)

Wind Turbine Design Competition, PLAN Goal Innovation and education by international design competition for small wind turbines Qualitative improvement of knowledge base by testing and operation experience Quantitative improvement by performance measurements and monitoring (data base) Cooperation with FORWIND, UAS Bremerhaven, UAS Kiel, (InHolland?) Description competition between student teams in the design, manufacturing and commissioning of small wind turbines Deliverables working turbine, design report, manual, commissioning report, presentations Requirements Compliance with standards (or selected articles) Dimensions of turbines TBD (diameter <1.5m) Design for a specified wind climate

Wind Turbine Design Competition: APPROACH Each institute may submit up to two turbines for the competition Grid connected? no further restrictions to the chosen concept Design for a wind climate typical for small wind turbines Project driven by the student teams themselves Planning Duration 1 year / yearly organized Detailed design, production and testing in 1 st, 2 nd and 3 rd semester Submission to the competition: beginning of June Jury evaluation and award ceremony during symposium in July

Wind Turbine Design Competition: EDUCATIONAL ASPECTS Technical skills Aerodynamics. Energy conversion, Control & safety system, Structure and loads Compliance with standards Grid integration Environmental aspects Production Commissioning / availability / troubleshooting Technical report and drawings, User manual & PR leaflet Working in teams and project organization Other International cooperation / competition Knowledge exchange on symposium Commercial presentation on fair

Wind Turbine Design Competition: EVALUATION CRITERIA Innovation: Design features (methods for energy conversion, grid connection, control, safety system, structure, reliability and O&M solutions) Production (suitable for mass production, number of parts, productions steps or actions) Environmental aspects (material and energy use, cradle to cradle) Visual appearance and acceptance, integration (integration in built environment, buildings) Quality Energy production in specified wind climate Energy pay back time Reliability and O&M solutions Design report and drawings, manual Presentation on symposium / fair Evaluation by a jury (teachers, specialists and others) based on product assessment, design report, commissioning report, measurements)

Wind Turbine Design Competition: TO BE DETERMINED The plan Wind turbines: size?, grid connected or not?, compliance with standards? Participation (invitations to other institutes?) Contact persons for the organization Agenda, planning Final ceremony: activities, prizes, date, jury,… What are the IEC requirements for small wind turbines? ………..

NHL approach, followed in nd year / no basics in fluent mechanics yet Preparation course: – Explanation on P-V, wind climate, energy production – Cp-lambda for different WT concepts from literature – Starting points: wind climate / dimensions / safety requirements – Load dimensioning (generator design & testing) Fabrication and assembly Commisioning Testing

Comment Peter Schaffarczyk, UAS Kiel, Criterium for evaluation: use highest energy production in moderate V claimate and high σ Let students also make a begroting: production hours, planning, costs (education: compromises must be made, $ is limited) Compare with formula student competitions Use low voltage: safety, education (instead of buying black box) H max < 10m Likes measurement on a car. Study cv = strict, little flexibilityct NL 8-10 credits for this project (30 in a semester)

Comment Stephan Barth, Michael Holling, FORWIND Prefers testing in wind tunnel over testing on a driven platform (ref Andrea Reuter: WT on Volvo = unreliable/ permission only for GB based industry) Suggests DLR wind tunnel or 2x2m wt in Varel van Deutsche Wind Gard (of een grote wt in Wilhelmshaven?) 1 year is too little time for this project (not real) No problem with participating at a later stage KISS in the beginning of the project Safety = important – Ask for evidence of max loads and RPM – Comply with simplified load assumptions – certification committe: ask GH E is maost important criterium. To be measured in wind tunnel (ramp V test performance and quality of control and safety system)

Comment Henry Seifert, UAS Bremerhaven Important: 1 robustness, 2 robustness, 3 robustness, bremerhaven has an airstrip that will be closed next year: good runway for driven platform Safety = important – Comply with simplified load assumptions to be determined by certification body, oa Vmax – invite industry (jury, material sponsors, Specify the measurement system Duration? 1 or 1.5 year for complete program. High workload for students, they will complain Planning: specification, design with certification report, evaluation report and go/nogo, production, commisisoning, measuring, symposium. Up to and including certif report: 25 credits, rest 5 credits Blade testing acc to IEC defined by commission