Eric Montesinos LIU-SPS coordination meeting 23rd May 2014

Slides:



Advertisements
Similar presentations
New 200 MHz and 800 MHz amplifiers
Advertisements

Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
LHC Inject or Upgra de SPS 200 MHz SPS 800 MHz RF Power upgrade Progress report April 2014 Eric Montesinos LIU-SPS meeting, 30 April 2014.
Chubaka Producciones Presenta :.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
P Pathophysiology Calendar. SundayMondayTuesdayWednesdayThursdayFridaySaturday January 2012.
SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 18 December 2013.
DESIGN OF A HIGH POWER TEST STAND FOR ESS SPOKE CAVITIES
LINAC4 STATUS Alessandra M. Lombardi for the LINAC4 team 1.Motivation and goals 2.Status of Linac4 2 years after official start of the project ( )
RF power & FPC status Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !
Few slides from J. Fox’ talk in last November’s LARP meeting LARP CM
LIU-IONS Linac3 meeting LIU Project – Planning and Installation Julie Coupard EN/MEF-OSS.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
IT-4082 Design, Supply, Installation and Commissioning of the ventilation of the BAF3 building Alexandre Broche EN-CV-PJ.
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
Renovation of the 200 MHz RF system LLRF issues. Cavities redistribution 26 October th LIU-SPS Coordination Meeting 2  2011 : 4 cavities 2 x 4.
14th ESLS RF Workshop ELETTRA / Trieste, Italy / 2010 September The Elettra Storage Ring and Top-Up Operation Emanuel Karantzoulis.
Planning & Installation meeting New working group EDMS th October 2014LIU PLI meeting - J.Coupard1.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
EN-HE Group meeting 19 th June 2015 I. Rühl / EN-HE.
The months of the year January February. The months of the year March April.
T. KurtykaLinac4 meeting 12 March 2009 Guidelines from the sLHC Specification Committee 1). sLHC Specification Committee 2). Schedule of tenders for Linac4.
LIU-SPS 200 MHz RF upgrade draft schedule
LIU-SPS RF Power upgrade | 09 December 2015.
Commissioning of REX Jose Alberto Rodriguez, BE-OP-PSB (167538) on behalf of the ISOLDE operations team.
SPS point 3 New RF building LIU-SPS-200 MHz Power Upgrade April 19, 2011Eric Montesinos / CERN-BE-RF-SR.
APA CONTRACTS TO POST-2017 ALLOTTEES July 24 - Letter to all Allottees Inviting Comment August 10 - Allottee Response August 21 - Workshop August 28 –
LIU-SPS 200 MHZ RF UPGRADE DRAFT SCHEDULE
For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez.
SPS YETS 2015/2016 Planning meeting for BE-BI 09/12/15 David Mcfarlane EN-MEF D.Mcfarlane1.
CALENDAR 2015: “THIS PROJECT HAS BEEN FUNDED WITH SUPPORT FROM THE EUROPEAN COMMISSION. THIS PUBLICATION [COMMUNICATION] REFLECTS THE VIEWS ONLY OF THE.
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 17 th December 2013.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
SPS point 3 LSS3 rearrangement LIU-SPS-200 MHz Power Upgrade May 26, 2011Eric Montesinos / CERN-BE-RF-SR.
SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 15 th August 2012.
LIU EL-FC ACTIVITIES Georgi Minchev Georgiev EN-EL-FC EDMS
ALBA RF System Paco Sanchez - 13th ESLS RF - DESY, 30 September Paco Sanchez, RF Group, CELLS (Consortium for the Exploitation of the Synchrotron.
LIU/BE-RF management team meeting PM section, LIU-SPS RF power upgrade 31 May 2016LIU/BE-RF management -
HiLumi-LHC/LARP Crab Cavity System External Review 5-6 May 2014, BNL SPS - RF Power and Coupler status Erk Jensen, Eric Montesinos, CERN BE-RF.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
LARP Crab Cavities Cryomodule Integration Meeting Final Notes A.Ratti LBNL.
CC LLRF SM18 test plan and BA6 infrastructure
AFC 2017 (and 2018) AFC timeline:
Status of HESR 18th March Gießen Dieter Prasuhn.
EN-HE group meeting
Second SPL Collaboration Meeting, Vancouver May 2009
EN-HE Group meeting 4th December 2015
LIU–PLI report LIU SPS meeting.
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Dictation practice 2nd Form Ms. Micaela-Ms. Verónica.
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
2300 (11PM) September 21 Blue line is meridian..
345 kV Bailey-Jones Creek Project Anticipated Project Schedule
McDonald’s calendar 2007.
RF systems introduction
HIGH POWER AMPLIFIERS For WARM LINAC Arash Kaftoosian
ESS Bilbao RF Systems Overview Pedro J. González
Status and New Developments of ALBA RF Systems
February 2007 Note: Source:.
McDonald’s calendar 2007.
Status of the ESS High Power RF Systems
345 kV Bailey-Jones Creek Project Anticipated Project Schedule
Status and New Developments of ALBA RF Systems
2015 January February March April May June July August September
Presentation transcript:

Eric Montesinos LIU-SPS coordination meeting 23rd May 2014 SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 23rd May 2014

(still SSPA, Klystron, IOT) Amplifiers Drivers (SSA): MS completed : 17 companies selected IT completed : selected company under qualification FC March 2014 Finals (SSA or Tetrodes): MS completed : 7 9 companies selected TS to be send out June 2014 FC December 2014 Combiners (3 dB above 100 kW) In house TTE fellow Transmission lines (coaxial, 345 mm outer) During Winter shutdowns 2015-2016-2017 Tetrode vs Diacrode (still SSPA, Klystron, IOT) 23th May 2014 LIU SPS RF

April 2014 amplifiers Schedule 2015 2016 Drivers December CERN approval for Series Production (after LD tests) IT : Invitation to Tenders FC : CERN Finance Committee FAT : Factory Acceptance Tests CERN AT : CERN Acceptance Tests LD Tests : Long duration tests : Long Technical Stop, No beams August Pre-series CERN AT October IT sent March First Series FAT June Pre-series FAT December Last Series CERN AT March FC Order placed 2015 2016 2017 2018 2019 March CERN approval for Series Production (after Pre-series LD tests) Finals September First Series FAT June Ready for operation May IT sent December FC Order placed June Pre-series FAT LSS3 upgrade & connection of amplifiers December 2014 Decision for technology September 2015 First RF tests March 2017 CERN full RF tests 23th May 2014 LIU SPS RF

April 2014 9 months cavities re-arrangement 4 months RF Power conditioning 5 months LLRF commissioning 2011 2012 2013 2014 2015 2016 2017 2018 2019 Studies Tendering Construction Installation New RF Power Amplifiers and LLRF LLRF Design and proto Commissioning Start up LLRF Tests LLRF Series Studies Coaxial Lines Cavities pickups vacuumCV, EL HBW (kicker and Pickup) LSS3 Tunnel Integration Spare sections New power couplers Studies Authorizations Construction BAF3 RF Building Studies Services Tests 1/4 of full power Full Power 23th May 2014 LIU SPS RF

LIU-SPS RF upgrade Working Group Members Dep-Group Persons BE-RF Eric Montesinos, Charles Julie, Simon Rains, SPS power team, Thomas Bohl, Wolfgang Höfle, Urs Wehrle, Elena Shaposhnikova, Philippe Baudrenghien BE-ABP Ghislain Roy (BE space manager), Patrick Bestmann, Yannis Papaphilippou BE-ASR Marc Tavlet, Christelle Gaignant, Axelle Deleu BE-BI Christian Boccard, Patrick Odier DGS-SEE Guillaume Fontana, Cécile Pinto DGS-RP Nadine Conan, Christophe Tromel EN-CV Mauro Nonis, Michele Battistin, Aurelio Berjillos Barranco, Alexandre Broche EN-EL Guillaume Gros, Jean-Pierre Sferruzza, Christophe Crombez, Denis Ribiollet EN-HE  Caterina Bertone, Pascal Brunero, Serge Pelletier, Yann Seraphin, Patrick Vallet, Gilles Roche, Helder Lorenco EN-MEF Frédéric Galleazzi, Yvon Muttoni, David McFarlane, Antoine Kosmicki, Emmanuel Paulat GS-SE Luz-Anastasia Lopez-Hernandez, Laurent Faisandel, Christophe Biot TE-EPC Gilles LeGodec, Christophe Coupat TE-MSC Jérémie Bauche TE-VSC Paolo Chiggiato, Antonio Mongelluzzo, Jose Antonio Ferreira Samoza 23th May 2014 LIU SPS RF