0630R Review Group meeting 21 February 2018 Settlement Data topic

Slides:



Advertisements
Similar presentations
Implementation of Non Effective Days Nexus Workgroup – March
Advertisements

1 Smart Metering Portfolio DCC Day 1 Project Smart Metering Portfolio Focus Group Project Update Thursday 06 th June 2013.
Nexus Workgroup CSEP Transition Topic June
Shipperless & Unregistered site working group Recommendations to address the Unregistered Sites Collectively establish & execute activities to correct.
IGT Single Service Provision Requirements Update – 27 th March 2013.
Performance Assurance 21 st May Value Chain. Value Chain Xoserve would like to propose an approach to further aid the development of the Performance Assurance.
PN UNC Workgroup iGT Services 7 th February 2012.
1 Modification 437 – Blank MAM Identities Distribution Workgroup December 2012.
Current and New process Current Process New Process Response: Does not want service but live supply -Passed into Orphaned Report Intends to confirm – Remains.
© British Gas Trading Limited 2011 Slide 1 Re-establishment of Shipperless Sites UNC0425 Scenarios Scenario 1 – Last Shipper only activity Effective meter.
1 Smart Metering Foundation Stage February Agenda File Format Changes for Effective Switching Back Population Approach for Effective Switching.
1 Customer Objections in Complete Status (CCO Clean-up Phase 3) Background Next Steps.
Debt Flagging for Electricity & Gas Customers – Industry Code CER, GMARG/IGG August, 2011.
DCA timeline and ROM Overview 12 October Smart Metering Indicative Timeline Evaluation Service (EVS) 2528 received / Rough Order of Magnitude.
1 iGT Agency Services migration considerations As part of UK Link replacement programme (incorporating industry requirements) the new systems will need.
Ofgem Switching Programme Overview
User Pays User Committee 12th November 2013
Supply Point Register 7th December 2011
Supply Point Register 21st November 2011
Supply Point Register 10th January 2012
Stacking Implementation Plan
Functional Change through RGMA Review Ph2
Modifications iGT 039 and GT 0440 re iGT Agency Services background
Gerry Halligan 14 January 2015
Market Trials ChMC 8th August 2018.
UNC Modification 0663S Extending the data comprised under the definition of Supply Point Premises Data (TPD V5.18.1) and iUNC Modification 114 Extending.
Must Read Process Guide For Shippers
Smart Metering Consequential Changes
Mod 430 iGT Mod 047 Workgroup Update
Confirmation Notice Period for Certain ‘Unique’ Sites
Agenda Action Review Update on IX and iGT access Testing strategy
Project Nexus Workgroup MPRN Lifecycle 11th August 2014
DSC ChMC CSS update 7th November 2018
Project Nexus Workgroup
Project Nexus Workgroup
RAASP – Solution Options Scenario Comparison
Antwan Dozier ACACSO May , 2018
Gerry Halligan 10 September 2014
Chris Warner UNC Modification Panel 21 December 2017
Chris Warner 5th February 2018
CONFIDENTIAL - Title of presentation © 24 November 2009 EDF Energy plc
DSC ChMC CSS update 13th February 2019
CoMC on 20th February 2019 For Discussion Only
Distribution Workgroup 8 August 2012 Joanna Ferguson
Industry Shipperless & Unregistered Working Group
CSS Consequential Change CoS Shell Record Submission for Discussion at 630R 27th April 2018.
Project Nexus Workgroup
Provision of Market Share Portfolio for REC CoMC 20th February 2019
Current situation The submission of AQ Appeals and AQ Amendments using two alternative dates and reads that provide a more realistic indication of the.
REC Enquiry Services Schedule
Deferral of Retrospective Updates Functionality
PN UNC AMR Topic Workgroup
Lessons Learnt UKLC - November 2015
Unregistered Sites Reports
Project Nexus Workgroup
DN Interruption Phase II
Key Messages from 0630R 26th January 2018.
Implementation Approach Distribution Workgroup – June 2014
Meter Read Rejections ..
Meter Reads.
Project Nexus Workgroup
COR3007: UNC MOD 450B – Monthly revision of erroneous SSP AQs outside the User AQ Review Period Implementation UK Link Committee – May 2014.
Modification 440 Project Nexus iGT Single Service Provision
Project Nexus Workgroup
Retail Energy Code - Data Access Schedule
Customer Issue Management CoMC Update for April & May 2019
0688 Workgroup Xoserve Actions
UK Link Timeline June-19 Sept-19 (EUC) Nov-19
Shipper MI (Shipper Pack / PARR)– Update
REC Data Specification and UK Link File Formats
Presentation transcript:

0630R Review Group meeting 21 February 2018 Settlement Data topic Disclaimer – the information provided on the Central Switching System (CSS) processes is an extract for the purpose of providing background to the 0630R topics under discussion today. The information does not represent the full extent of the CSS processes / business rules

Central Switching System Data items provided in switch request (gas only and only those relevant to 630R discussion) Data item Purpose / validations RMP Id Valid RMP Id Supplier Id Valid Supplier Id, sanction test Switch Effective Date Switch Effective Date – within D+28 and D+1 Shipper Id Valid Shipper Id, valid Shipper:Supplier relationship. Shipper sanctions test Market Sector Code Valid Market Sector Code Change of occupancy indicator “Y” may nullify objection test. Erroneous transfer indicator “Y” nullifies objection test.

Phases of a switch request (happy path) Validated switch notice Confirmed notice Secured switch notice 17:00 00:00 Objection* window Gate Closure Switched Validated switch request Not objected * Objection period (1 or 2 days) is determined by the prevailing RMP market sector code held in CSS, not the market sector code provided by the gaining Supplier in the switch request.

Validated switch notice Notifications issued by CSS during a switch request (happy path) Source – Operational Choreography document: https://www.ofgem.gov.uk/system/files/docs/2017/10/d-4.1.6_e2e_operational_choreography_v3.0_daft_final.pdf Gaining Supplier Outgoing Supplier Gaining Shipper Outgoing Shipper UK Link* Data Enquiry Service Gaining Supplier Outgoing Supplier Gaining Shipper Outgoing Shipper UK Link Data Enquiry Service Gaining Supplier Outgoing Supplier Gaining Shipper Outgoing Shipper UK Link Data Enquiry Service Switch request Validated switch notice Confirmed notice Secured switch notice 17:00 00:00 * - under review

Phases of a switch request validation failure Failed validation – switch cancelled 17:00 00:00 Validated switch request

Phases of a switch request objection Validated switch request Objected – switch cancelled 17:00 Objection window Validated switch request

Phases of a switch request cancellation Incoming Supplier cancels Switch request (can happen up to 17:00 D-1)* Switch request Validated switch notice Confirmed notice 17:00 00:00 Objection window Validated switch request Not objected * Notices sent to industry parties as required

Phases of a switch request annulment Losing Supplier annuls Switch request (can happen up to 17:00 D-1)* Switch request Validated switch notice Confirmed notice 17:00 00:00 Objection window Validated switch request Not objected * Notices sent to industry parties as required

Registration rules and status – from ABACUS

Data items provided in UK Link change of Shipper / registration event to establish settlement criteria - Grey shading indicates not provided by CSS Class 4 Class 3 MPRN MPRN Shipper Id Shipper Id Supplier Id Supplier Id Switch Effective Date Switch Effective Date Market Sector Code Market Sector Code Class 4 Class 3 Meter reading frequency Read submission frequency Customer / supply point data e.g. emergency contact details Customer / supply point data e.g. emergency contact details

Data items provided in UK Link change of Shipper / registration event to establish settlement criteria - Grey shading indicates not provided by CSS Class 2 Class 1 MPRN MPRN Shipper Id Shipper Id Supplier Id Supplier Id Switch Effective Date Switch Effective Date Market Sector Code Market Sector Code Class 2 Class 1 Meter reading frequency Read submission frequency SOQ SOQ SHQ SHQ Customer / supply point data e.g. emergency contact details Customer / supply point data e.g. emergency contact details

Solution options: “shell” record Default rules others Discuss……………. Solution options: “shell” record Default rules others

Isolation and withdrawal discussion topic

Discussion topic Isolation and withdrawal – UNC rules The table on the following slide sets out the rules to be met in order for the Registered User to withdraw from a Supply Point. With the implementation of the CSS rules need to be established to ensure that Supplier registration / withdrawal to a RMP and Shipper registration / withdrawal to a Supply Point are consistent e.g. it cannot be the case that a Shipper is registered to a Supply Point without a Supplier being registered to a RMP – so a Supplier cannot withdraw from a RMP without the rules in the UNC being met.

Discussion topic Isolation and withdrawal – UNC rules Meter Point Status (status of the service pipe) Isolation status (the ability of the meter to pass gas) Withdrawal status Confirmation status RMP status (as held by CSS) LI N (or blank) N Operational Y Dormant SU   CA or CL DE Terminated EX Nil value

Discussion topic Isolation and withdrawal – REC / UNC rules For a Supplier to withdraw from a RMP the following UNC rules must be met: Isolation Status is Y The Supplier withdrawal from the RMP automatically results in the Shipper withdrawal from the Supply Point. A Shipper cannot independently withdraw from a Supply Point. A Shipper withdrawal from a Supply Point can only be initiated by a Supplier withdrawal to the RMP (which is subject to the rules above).

RMP status – from ABACUS Dormant RMP Status Created* Operational Terminated * Electricity status only