LOP Flare Pilot Outage Shell Martinez Refinery 7/6/18

Slides:



Advertisements
Similar presentations
Fired And Unfired Pressure Vessels
Advertisements

Engine Operation Chapter 3
Static Electricity Rare Occurrence or Common Hazard?
Hazard Survey Dow Fire and Explosion Index is the most popular form of hazard survey. A formal systematized approach using a ranking form (similar to an.
Student Book © 2004 Propane Education & Research CouncilPage Placing Appliances into Initial Operation Knowing the proper techniques and.
Engine Maintenance Chapter 10 Emergency Repairs Afloat.
3.7.6 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Conducting Container Vapor Flaring Operations Before.
Engine Intro & Basic Induction
1 Oil oxidation impact on Feed pump and turbine performance Presenter: Walter Bischoff.
ANY PIPE CONNECTION TO THE TURBINE IS A POTENTIAL SOURCE OF WATER EITHER BY INDUCTION FROM EXTERNAL EQUIPMENT OR BY ACCUMULATION OF CONDENSED STEAM.
3.2.2 Student Book © 2004 Propane Education & Research CouncilPage Performing DOT Cylinder Evacuation and Vapor Flaring Operations Before DOT cylinder.
Fuel Oil Systems Fuel Oil Systems consist of: Storage Tanks Pumps
Safety Meeting Protective Equipment EDM Services, Inc. March 2008.
1 Combustion Oil Fired Equipment. 2 OIL Combustion of oil fired equipment has the same basics of gas. Remember, Oil is a liquid and this must be converted.
Release Reporting. Lesson #17 - Release Reporting How Do I Know If I Have a Leak in My UST System?
Designing and Installing Exterior Vapor Distribution Systems
1 Mission First – People Always – America Forever Base Wide Natural Gas Outage GAS OUTAGE: DATE: TUESDAY 19 SEPTEMBER 2006 TIME: HOURS LOCATION:
1 Twelve Steps to Engineering Safe Oil and Gas Facilities Based on SPE By: Jim Johnstone and Jim Curfew – Contek Solutions LLC Presenter: Mike Leonard.
FRANKLIN engineering group, inc. Start-up Shutdown Malfunction Plan Development and Implementation Duncan F. Kimbro
Student Book © 2004 Propane Education & Research CouncilPage Purging Vapor Distribution Lines & Appliances Purging is the controlled displacement.
Safety Talk 9 / 1 Safety Talk 9 Safe Operation of Fired Heaters: start-up.
Student Book © 2004 Propane Education & Research CouncilPage Performing Gas Distribution System Leak Checks Requirements for vapor distribution.
1. Purpose  It is the policy of the company to provide equipment necessary to prevent injury in the event of a chemical exposure. Types of hazards 
2 IMPACT - THE FIRE PERMIT = Hot Work Permit 3 Welcome ! This course is linked to the use of IMPACT, so it is assumed that: You know how to use IMPACT.
ISX12 G & ISL G Cold Weather Operation 1. ISX12 G and ISL G Cold Weather Operation  Cold weather affects CEGR SI natural gas engines differently compared.
3.1.8 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Conducting Container Vapor Flaring Operations Before.
What is a safe work permit? A safe work permit is a written record that authorizes specific work, at a specific work location, for a specific.
Confined Spaces. Definition: Are large enough that an employee can bodily enter them Are not designed for continuous occupancy. Have limited or restricted.
Release Reporting. How Do I Know If I Have a Leak in My UST System? 1. Unusual operating conditions; such as, erratic behavior of the dispensing pump.
Excavation & Trenching Awareness Plus
Rev. 1 © Chevron 2009 Hot Work Awareness Plus. Rev. 1 © Chevron Training Objectives  To explain the type of work which may constitute Hot Work.
Process Safety Advisory on Boiler Incidents
Hazardous Waste.
Sampling Oil-Filled Transformers
Unit 13 Oil-Burning Equipment
Engine Systems Overview
Hazard Communications Standard HS-105 (R)
Lecture (13): Hazardous Waste Management
Compliance and Enforcement Presentation to Industrial Association of Contra Costa County February 22, 2017 Paul Grazzini, Air Quality Specialist Bay.
General Design Considerations
SERVICES, LLC 1 1.
Chapter 2. Control Objectives and Benefits
Natural Gas Production Chapter 4 Hydrate Formation
A. Shop Safety Awareness and Principles for Safety
Release Reporting Lesson 17 covers the subject of Release Reporting. You will learn how you know when you have a leak and what leaks require reporting.
What Library Staff Should Know About Fire Safety
MERRICK & COMPANY CHARLOTTE WATER INSTITUTE
Respect and Caution Required! QUIZ
Deadlegs not only a hazard in football
FlexfloTM Surge Relievers
Flammable and Combustible Liquids
Gas Furnace Controls Part 1.
Risk Reduction Potential of Accident Mitigation Features
First Break To establish minimum safety requirements when performing a first break “First Break” – Refers to the initial opening of piping/equipment.
Environmental Compliance
Sandia National Laboratories
Oxygen/ Fuel Cutting and Welding
SD INTRASTATE PUBLIC EDUCATION
Furnaces (also called Fired Heaters)
Rajan Bhandari Senior Lecturer
Saskatchewan Measurement Directive PNG017 DRAFT CHANGES
HAZOP Guidewords Base Set
PDO Second Alert Always follow the PTW procedures
SAFETY, TOOLS & EQUIPMENT, SHOP PRACTICES
Global Safety Standard Orientation Line and Equipment Opening
Parker domnick hunter. Safety of Electrical and
Gas Transmission Pipelines
SD INTRASTATE PUBLIC EDUCATION
Pneumatic System Conditioning
Presentation transcript:

LOP Flare Pilot Outage Shell Martinez Refinery 7/6/18 Nathan Hanna Operations Support Engineer Austin Schipper Reliability Engineer Tim Sloper Senior Operator Contra Costa County CAER Group Presentation September 20th, 2018

Agenda Event Description Impacts of the Event Root Causes Recommendations Question and Answer Session Footer Date Month 2016

July 6th, 2018 Event Description 00:57 AM – The (Light Oil Processing) LOP instrument air header pressure dropped from 109 psig to 76 psig due to a failure of a mechanical linkage between two valves on an instrument air dryer. 01:03 AM – The dip in instrument air header pressure caused a flaring event that extinguished the LOP flare pilots by carrying water from the flare lines to the flare tip. 03:10 AM – An unrelated unit upset caused a second flaring event and a release of unburned flare gas from the LOP Flare while the flare pilots were still extinguished. The flare is a safety device that is designed to combust excess gas at the refinery. During normal operation, the flare is always lit Contra Costa County CAER Group Presentation September 20th, 2018

Contra Costa County CAER Group Presentation Impact from the Event Release of uncombusted flare gas from the LOP flare. A Community Warning System (CWS) level 2 was called as a precaution No impact to people or assets. Required agency notifications were made. Ground Level Monitors located on the facility fence-line showed no detection of H2S or SO2 above background levels. Community sampling did not detect any offsite readings. 2) A Community Warning System Level 1 was called for the 1AM flaring event and the level 2 was called for the release of unburned flare gas. 3) No impact to people or assets internal or external to the site. 4) Required agency notifications were made during the event to the county, local law enforcement, and Cal OSHA. 5) Elevated H2S or SO2 levels would be an indication of potentially hazardous materials. 6) Shell sent teams with portable gas detectors into the surrounding community to sample for noise and toxic materials, such as H2S, SO2, and combustible hydrocarbons. Contra Costa County CAER Group Presentation September 20th, 2018

Root Cause #1 – Flare Line Drain System Contra Costa County CAER Group Presentation September 20th, 2018

Root Cause #1 – Flare Line Drain System The elevated flare is used to combust flare gas in a controlled manner when unit upsets occur in the refinery. Flare gases are transported to the flare tip using a 24” line that is sloped to drain liquid back to a collection manifold. Steam is always injected into the flare during normal operation to keep the flare tip hot and condenses into the 24” flare line. The flare header collection manifold drain pot continually pumps liquid out of the collection manifold. Operations also drains the collection manifold on a weekly basis using one of three pumps which were connected to the manifold. Two other lines are connected to the collection manifold, an 8” line and a 10” line, which are blinded upstream and downstream of the collection manifold. Contra Costa County CAER Group Presentation September 20th, 2018

Root Cause #1 – Flare Line Drain System Evidence from the investigation indicated that there was a significant accumulation of water in the flare line prior to the incident. The water in the 24” flare line came from steam condensing at the flare tip and flowing back into the flare line towards the collection manifold The flare header drain pot (Sarco pot) was ineffective at removing the water. The weekly draining by operations did not successfully remove all the water. Vapor that caused the pump to speed up came from the 10” and 8” lines 1) Typically the water is removed by the drain pot and weekly pump outs. 4) The operator would believe that the 24” line was properly drained based on the speeds of the pump. Contra Costa County CAER Group Presentation September 20th, 2018

Root Cause #2 – Flare Pilot Relighting System The pilots are initially lit or re-lit with a flame front generator lighting system This system fills a ¾” pipe between a remote ignition station and the flare pilot burner with a combustible air and fuel mixture. When the pipe is fully primed with a combustible mixture the mixture is ignited and the flame travels from the lighting station to the pilot burner to ignite it. 1) The flare pilots are always lit, similar to a water heater in your house. Contra Costa County CAER Group Presentation September 20th, 2018

Root Cause #2 – Flare Pilot Relighting System After the flaring event at 1:03 AM, the flare pilots were unable to be relit even though operations had started trying to relight the pilots immediately after the event. It was quickly discovered that the flame was unable to travel from the ignitor panel to the flare pilots. The piping from the ignitor panel to the pilots was plugged with a combination of corrosion product and water. This caused a delay in the relighting of the pilots and the pilots to remained unlit during the second flaring event at 3:10 AM. 3) The build up of corrosion product, such as rust, and water from the 1AM flaring event. 4) The flare pilots were relit after the 3AM flaring event. Contra Costa County CAER Group Presentation September 20th, 2018

Contra Costa County CAER Group Presentation Recommendations A total of 13 recommendations were identified by the investigation team, including: Evaluate the current functioning of the flare line drain pot. If the drain pot is not functioning as expected, troubleshoot the issue and ensure the drain pot is repaired. Evaluate the carbon steel portions of the flame front generator lines. Identify flare pilot system and pilot ignition system for all flare systems as Safety Critical Equipment (HEMP). Ensure the critical activities to maintain the equipment in good condition are identified and implemented. Learnings from this event were incorporated into the procedures and the unit Process Hazard Analysis (PHA). This recommendations has been completed and repairs were made. A project to upgrade significant portions of flame front generator lines to stainless steel, and determine whether the rest of the line needs to be upgraded to stainless steel. HEMP is a Shell internal program to manage Safety Critical Equipment. PHAs are a systematic approach to evaluate initiating events and barriers to prevent potentially dangerous scenarios. Contra Costa County CAER Group Presentation September 20th, 2018

Contra Costa County CAER Group Presentation Questions and Answers Contra Costa County CAER Group Presentation September 20th, 2018