Step 1-Go to https://forestonline. bih. nic Step 1-Go to https://forestonline.bih.nic.in and then click on scheme formulation system (e-RDF)
Process before scheme formulation * e- RDF User Manual Process before scheme formulation * 1 Generate kml file of proposed site. You can download google earth and kml creation user manual from website . By login through your user id in e-RDF link. 2. Take geo-tag photographs of site. 3. Collect latitude & longitude of site location. 4. Scan and upload signature by officers in e- RDF software by login through your user id in e-RDF link then click on upload signature First RO login and generate/ formulate scheme at RO level and proposal will be uploaded by RO. Then Dfo Login and check the proposal and if he want to edit/ change the proposal he can otherwise he will upload proposal. And same process will be followed by Cf, Rccf level.
Step 2- Input your user id and password mro banka 1234
Step 4- Then click on Plantation. Step 3- Then go to menu and click on Scheme formulation menu button then clicks on RDF for plantation work , Step 4- Then click on Plantation.
Plantation. Step 4.1- Then feed all data related to plantation scheme (Part -1), Then click on save button
Step 4.2- Then feed all data related to plantation scheme (Part -2), Then click on save button
5. SMC WORK Step 5 .1 - Then go to menu and click on Scheme formulation menu button then clicks on RDF then SMC
5 .1.a - If required Then click on contour trench and feed all related data and click on save button and then work id will be generated .
Step 5 .2 - Then go to menu and click on Scheme formulation menu button then clicks on SMC 5 .2.a - If required Then click on Contour Bund and feed all related data and click on save button and then work id will be generated.
Step 5 .3 - Then go to menu and click on Scheme formulation menu button then clicks on SMC Step 5.3.a - If required then clicks on Drainage Line Treatment (DLT) and feed all related data and click on save button and then work id will be generated. Step 5 .4 - Then go to menu and click on Scheme formulation menu button then clicks on SMC Step 5.4.a - If required then clicks on Spillway and feed all related data and click on save button and then work id will be generated. Step 5 .5 - Then go to menu and click on Scheme formulation menu button then clicks on SMC
Step 5.5.a - If required Then click on Stream Bank Erosion (Geo Bag) and feed all related data and click on save button and then work id will be generated. Step 5 .6 - Then go to menu and click on Scheme formulation menu button then clicks on SMC Step 5.6.a - If required Then click on Stream Bank Erosion (Gabion) and feed all related data and click on save button and then work id will be generated. Step 5 .7 - Then go to menu and click on Scheme formulation menu button then clicks on SMC Step 5.7.a - If required then clicks on Water Harvesting Tank / Pond and feed all related data and click on save button and then work id will be generated. Step 5 .8 - Then go to menu and click on Scheme formulation menu button then clicks on SMC Step 5.8.a - If required then clicks on Earth Check Dam / Silt Detention and feed all related data and click on save button and then work id will be generated.
6. Club Schemes Step 6 .1 - Then go to Generate RDF Id in club Schemes menu. Step 6.1.a - Here select all works which is to be Merge/ Club/Group then click on club/ Merge proposal button then RDF id will be generated
7. Upload proposal 7 .1 - Go to view menu and click on Schemes with RDF ID Step 7.1.a - Then enter generated RDF Id in text box then click on enter button.
Now range officer level scheme formulation work has been completed Step 7.1.b - Then proposal will be generated having all schemes data. Step 7.1.a - Then proposal will be generated having all schemes data. Step 7.1.b – Go to end of the page and then save proposal by clicking on save proposal to PDF button. Now range officer level scheme formulation work has been completed
Step 7.1.c – For uploading the proposal browse/ select PDF and upload proposal by clicking on upload button then proposal will be uploaded successfully at RO level.
8. DFO/CF/RCCF LEVEL For Updation and uploading of the proposal DFO have to login with their user id and password from forest https://forest.bih.nic.in and then clicking on scheme formulation system (e-RDF). Step 8 - First login through login page. Step 8.1- If required for update to scheme, Go to Update Scheme Formulation menu and click on RDF/SMC Update button.
Step 8.2 – Feed all data financial year, range name, plantation site Id and then edit RDF Part – I and RDF Part – II then click on Update button. Step 8.3 - Go to view menu and click on Schemes with RDF ID Step 8.4 - Then enter generated RDF Id in text box then click on enter button.
Step 8.5 - Then proposal will be generated having all schemes data. Step 8.7 – Go to end of the page and then save proposal by clicking on save proposal to PDF button.
Step 8.8 – For uploading the proposal browse/ select PDF and upload proposal by clicking on upload button then proposal will be uploaded successfully at DFO level.