4/4/2019.

Slides:



Advertisements
Similar presentations
Chapter 6 Sub-Group ICAO Headquarters, November 2013
Advertisements

International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-30/PIA-2 Service Improvement through Digital Aeronautical Information.
The European Organisation for the Safety of Air Navigation Digital NOTAM Concept AIXM XML Developers’ Seminar #5 23 March 2010.
Introduction to Digital NOTAM
By: Date: Federal Aviation Administration U.S. Aeronautical Information Management (AIM) Modernization Update on digital Federal NOTAM System Brett Brunk.
EUROCONTROL’s Efforts with AIXM
Introduction to AIXM. Topics Criticality of AIS information AIM – a “data centric” approach Worldwide interoperability AIXM mission Related developments.
Presented to: Federal Architects By: Kim W. Barnette, Ph.D. Aeronautical Information Management Federal Aviation Administration Date: April 11, 2007 Federal.
European AIS Database (EAD)
Digital AIM Training - Digital NOTAM
1 xNOTAM Trial Presentation xNOTAM Workshop #2 Brussels, November 2007 Item 6 European Organisation for the Safety of Air Navigation.
EUROCONTROL Digital NOTAM Project
Integrating information towards Digital ATM Information Structures - AIXM - Presented By: Eduard Porosnicu, Eurocontrol Date:August 27, 2013.
Digital AIM “D-AIM” Sam Van der Stricht EUROCONTROL.
What’s New with AIXM 5. Explaining AIXM 5 Mission and Objectives Coverage of the AIXM 5 data model –Scope of aeronautical information –Emerging “partner”
Aeronautical Information Exchange Model (AIXM). Introduction “Never let an aircraft take you somewhere your brain didn't get to five minutes earlier”
NOTAM Modernization at the FAA
Digital Airport Surface NOTAMs. Introduction What are NOTAMs? –Notices to Airmen (NOTAM) are used to alert pilots about temporary changes affecting the.
The European Organisation for the Safety of Air Navigation EUROCONTROL’s Efforts with AIXM AIXM 5.1 XML Developers' Seminar #4 – Mar 2010.
By: Date: Federal Aviation Administration AIXM Conference Don Smith and Vinod Vallikat Aeronautical Information Management March 18, 2007 Digital NOTAM:
Presented to: By: FAA Aeronautical Information Management Date: March 23, 2010 Federal Aviation Administration Federal NOTAM System (FNS) AIXM 5.1 XML.
1 Digital NOTAMs – A new paradigm. 2 Discussion Points NOTAMs – what are they? Recommendations from the AIM Global Congress Components of a digital NOTAM.
1 Digital NOTAM Towards a concept of operations xNOTAM Workshop #2 Brussels, November 2007 Item 2 European Organisation for the Safety of Air Navigation.
The European Organisation for the Safety of Air Navigation EAD AIXM 5.1 Implementation Razvan Guleac DNM/COO/NOM/ADM AIXM 5.1 Seminar.
1 1 Aeronautical Information Services Brief to AIXM User Group 27 February 2007.
The European Organisation for the Safety of Air Navigation Aeronautical Information Exchange Model (AIXM) – Business Rules.
SNOWTAM Trial: REST Interface. AIXM XML Developers' Seminar 2 Contents Digital-SNOWTAM Trial Introduction REST Introduction REST in the Digital-SNOWTAM.
Roadmap Phase 2 EAD & AICM By: Eduard Porosnicu, AIM Expert 7-8 October 2009 ACAC – AIM Workshop.
AIXM - purpose, scope, implementation and future evolution.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-30/PIA-2 Service Improvement through Digital Aeronautical Information.
Introduction to Digital NOTAM
AIXM 5.1 XML Developers' Seminar #2 – Dec 2009
Introduction to AIXM The purpose of this briefing is to present the evolution of AIXM from a specification intended to support AIS automation and static.
Airport GIS and Special Activity Airspace (Military)
02/05/2018 AIS-AIM SG - #4 Agenda item 1.4 Development implementation of AIS-AIM transition Implementation programmes and updates Paul Bosman Enter here.
Digital AIM “D-AIM” Sam Van der Stricht EUROCONTROL
AIXM 5.1 – Interoperability issues
Workshop on preparations for ANConf/12 − ASBU methodology
Chapter 11 Designing Inputs, Outputs, and Controls.
Workshop on preparations for ANConf/12 − ASBU methodology
Contents Digital-SNOWTAM Trial Introduction REST Introduction
Contents Digital-SNOWTAM Trial Introduction REST Introduction
Digital NOTAM Towards a concept of operations
Chapter 6 Sub-Group ICAO Headquarters, November 2013
Workshop on preparations for ANConf/12 − ASBU methodology
AIXM 5.1 – Interoperability issues
AIXM 5.1 – Interoperability issues
Digital SNOWTAM Trial: AIXM Database Design
EAD AIXM 5.1 Implementation
Digital AIM Training - AIXM
AIXM 5.1 – Interoperability issues
AIXM 5 Overview xNOTAM Workshop #2 Brussels, November 2007
AIXM 5 Development Status
Presented by Eduard Porosnicu, EUROCONTROL
AIS Manual (Doc 8126) Air Navigation Procedures for AIM Seminar
Digital AIM “D-AIM” Sam Van der Stricht EUROCONTROL
PANS-AIM (Doc 10066) Air Navigation Procedures for AIM Seminar
Digital AIM Training - AIXM
U.S. Aeronautical Information Management (AIM) Modernization
AIXM 5.1 – Interoperability issues
Digital AIM “D-AIM” Sam Van der Stricht EUROCONTROL
Digital NOTAM
Eddy Porosnicu EUROCONTROL
Introduction to Digital NOTAM
Eddy Porosnicu EUROCONTROL
Aeronautical Information Exchange Model (AIXM) – Business Rules
AIXM 5.2 – WIP AIXM CCB – Webex 10 OCT 2017.
Digital AIM Training - Introduction Introduction – day 2
Presentation transcript:

4/4/2019

xNOTAM Trial – closed NOV 2008

xNOTAM Trial Limited set of features: Airspace, AirspaceUsage; RouteSegment, RoutePortionUsage, Significant Points (Navaid and Designated Points); Aerodrome, Aerodrome Surfaces Usage, Runway, RunwayDirection, Taxiway; Obstacles; Notes Reversed Workflow NOTAM -> digital NOTAM In future: digital NOTAM -> NOTAM…

Overall Objectives achieved: Validate AIXM 5 encoding the information contained in NOTAM messages temporality concept Improvements of the model -> implemented in AIXM 5.1 Provide a proof of concept for a “digital NOTAM encoding application” not intended for operational use or for production!!! we need a much user-friendly and faster HMI for an operational system! Provide a significant amount of test xNOTAM data to system developers

Execution of the Trial

Lessons learned Incremental implementation ! Some key features (airspace, airport usage, obstacle, etc.) account for 50-70% of the NOTAM End users have priorities for what NOTAM should become digital first Initial input from LH Systems, SAS, KLM, Eurocopter, etc. Focus Group task Incremental implementation ! Candidates for increment 1 - Airspace activation / reservations - Route closures - Navaid events - Airport / Runway closures - Obstacles - SNOWTAM - all other NOTAM as text “Note” on the feature !

Lessons Learned Data provider application shall help the operator to validate the data (HMI-1) Was all expected data provided? Does data comply with all business rules? Is data plausible? If possible, visualise the data in the context of the static data Example – closed twy on airport layout Example – obstacles on airport/airspace background Example – active airspace on route/airspace background

Lessons Learned Data provider application shall minimise the data input effort (HMI-2) Shall have a consistent (unique?) workflow Avoid re-typing data that is already available If available, partial AIXM format received from external source (“digital NOTAM proposal”) At least cut/paste from another application, eventually in human-readable form Example: airspace coordinates input as (“452434N 0333422E, 452532N 0333401E, 451434N 0333422E”) instead of individual input of each position Example: “MON-FRI, 09:00-17:00”, “SUN, SAT, HOL”, etc. instead of complex timesheet input form

Lessons Learned Data provider application shall minimise the data input effort (cont.) Wherever appropriate, graphical input Example: twy / twy portion closure Example: work in progress area

Lessons Learned ICAO NOTAM Text to be produced automatically and displayed “as you input data” (HMI-3) Will ensure consistency between digital/text Will give confidence to the operator that the data was correctly input

Lessons Learned Data synchronisation is important! Baseline data Digital NOTAM NOTAM -> Checklist Assured delivery (digital signature) Data synchronisation service is necessary for both static & dynamic data (APLI-1)

Digital SNOWTAM Trial

Scope Execution: Winter 2009-2010 Service provider End user Originator Briefing FPL chart FMS data etc. Originator (Digital NOTAM) End user Pilot Airline OPS ATC etc. Image Text Application AIXM 5 (Digital NOTAM) xNOTAM Trial (origination only) xSNOWTAM Trial (end-to-end)

Digital SNOWTAM Trial 2009-2010 SNOWTAM Message Sample   0902020400 ESSA S ESSA S0 C)01L F)71/71/71 G)01/01/01 H)69/63/60 SFH N)71/GOOD C)08 F)71/71/71 G)01/01/01 H)62/65/68 SFH N)71/GOOD C)01R F)71/71/71 G)01/01/01 H)70/66/68 SFH N)71/GOOD R)7/MEDIUM-GOOD T)RWYS AND TWYS CONT 10 PER CENT. APRONS CONT 25 PER CENT Demonstrate xNOTAM benefits to end users -> Airlines Verification of the AIXM 5 Surface Contamination model Continue the testing of Web service standards REST architecture Start work on algorithms and open source code structured SNOWTAM text to AIXM 5 AIXM 5.0 to SNOWTAM text

Digital SNOWTAM Trial (2009-2010)

Initial results Surface Contamination model is validated Including extra capabilities, Detailed information for each Apron, TWY, stand Portion of Apron covered by contaminant Contamination percentage (very important for airlines) Individual observation time for each element Etc. Very well received by airlines Overview page – suggested by SAS and KLM Perfectly feasible as operational application in 1-2 years Report to AI-OPS: Poor compliance of issued SNOWTAM with ICAO specification Complex N) & R) fields Probably, for a good reason, but then the ICAO standard is in need for update… Syntax errors in F, H, G