Status of TTF HOM Project Aug 9, 2005

Slides:



Advertisements
Similar presentations
Bunch-by-Bunch Instrumentation Module Design Goals: –Unified conceptual design for all bunch-by-bunch instrumentation Beam position monitoring Bunch tune.
Advertisements

6 Mar 2002Readout electronics1 Back to the drawing board Paul Dauncey Imperial College Outline: Real system New VFE chip A simple system Some questions.
Update of EXT Stripline BPM Electronics with LCLS-style Digital BPM Processors Glen White, with slides by Steve Smith 15 December 2009 ATF2.
Test of LLRF at SPARC Marco Bellaveglia INFN – LNF Reporting for:
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
20 Feb 2002Readout electronics1 Status of the readout design Paul Dauncey Imperial College Outline: Basic concept Features of proposal VFE interface issues.
Preliminary Results from HOM Measurements at the Tesla Test Facility (SLAC) Josef Frisch, Kirsten Hacker, Linda Hendrickson, Justin May, Douglas McCormick,
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
4 Dec 2001First ideas for readout/DAQ1 Paul Dauncey Imperial College Contributions from all of UK: result of brainstorming meeting in Birmingham on 13.
1 MICE/AFE II t Update IIT Analog Front End (AFE) Test Stand AFE Conceptual Design Report (CDR) Terry Hart, Illinois Institute of Technology, February.
1 Linac/400 MeV BPM System Status Nathan Eddy PIP Meeting 8/8/12.
Moore’s Law and Modular Instrument Technology Speaker/Author:Paul Packebush Senior Group Manager Corporate Metrology, R&D National Instruments N.
1 Timing and RF Distribution NLC -> ILC Josef Frisch.
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
Optical Anchor / Interferometer Status: June, 2004 Josef Frisch.
Online Systems Status Review of requirements System configuration Current acquisitions Next steps... Upgrade Meeting 4-Sep-1997 Stu Fuess.
September 22, 2005 ESF Workshop-Perugia 1 Virgo Control Electronic upgrade Annecy/Pisa/EGO B.Mours.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
Status of ATF2 Cavity BPM Project Sep 29, 2005 Project Scope: Instrument both couplers ATF2 cavity BPM’s (35) Produce prototype for December cavity test.
MR (7/7/05) T2K electronics Beam structure ~ 8 (9?) bunches / spill bunch width ~ 60 nsec bunch separation ~ 600 nsec spill duration ~ 5  sec Time between.
Installation and checkout of QBPM system Hardware to be installed –Install hardware in racks –Install CPU /SIS digitizers/VMIC 3122 analog digitizers/Digital.
BPMs and HOM-BPMs for the XFEL Linac N. Baboi for the BPM and the HOM teams (DESY, CEA-Saclay, SLAC, FNAL, Cockroft/Daresbury) XFEL Linac Review Meeting,
14 Sep 2005DAQ - Paul Dauncey1 Tech Board: DAQ/Online Status Paul Dauncey Imperial College London.
VC Feb 2010Slide 1 EMR Construction Status o General Design o Electronics o Cosmics test Jean-Sebastien Graulich, Geneva.
1 C. Simon CLIC Instrumentation workshop BPM C. Simon on behalf of the Saclay’s group CLIC Instrumentation workshop 2 nd - 3 rd June.
An RF & High-Speed Acquisition Systems for High-Gradient Tests at CLIC Test Facility Raquel Fandos.
1 ATF2 Q BPM electronics Specification (Y. Honda, ) Design System –Hardware layout –Software –Calibration Testing Production schedule ATF2 electronics.
Future FONT BPM Processors C.Perry 25 June Types of Processor Two types of processor: a) present mixer type b) baseband type Both will be made because:
LCLS_II High Rep Rate Operation and Femtosecond Timing J. Frisch 7/22/15.
The ATF Damping Ring BPM Upgrade Nathan Eddy, Eliana Gianfelice-Wendt Fermilab for the ATF Damping Ring BPM Team.
1 Linac/400 MeV BPM System Plans and Status Nathan Eddy PIP Meeting 9/7/11.
TeV BLM Review 4/19/041 Tevatron BLM Review - Schedule BLM Replacement Prototype schedule: Provide prototype digitizer cards, crate, readout path by ~
Beam Line BPM Filter Module Nathan Eddy May 31, 2005.
18 December 2007 ATF Damping Ring BPM System Upgrade Joe Frisch, Justin May, Doug McCormick, Janice Nelson, Tonee Smith, Mark Woodley (SLAC) Charlie Briegel,
Cavity Alignment Using Beam Induced Higher Order Mode Signals in the TTF LINAC Olivier Napoly, Rita Paparella CEA/DSM/DAPNIA, Gif-sur-Yvette Marc Ross,
1 Electronics Status Trigger and DAQ run successfully in RUN2006 for the first time Trigger communication to DRS boards via trigger bus Trigger firmware.
1 ATF 2 Nanobpm (Q BPM) Electronics. Mark Slater: Cambridge Yury Kolomensky, Toyoko Orimoto: UCB Stewart Boogert, Steve Malton, Alexi Liapine: UCL Mike.
SLAC ESA T-474 ILC BPM energy spectrometer prototype Bino Maiheu University College London on behalf of T-474 Vancouver Linear Collider.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
BPM stripline acquisition in CLEX Sébastien Vilalte.
ATF DR BPM Upgrade Janice Nelson, Doug McCormick, Justin May, Andrei Seryi, Tonee Smith, Mark Woodley.
NLC - The Next Linear Collider Project Nano beams in the ATF extraction line Marc Ross Linear collider challenges: Energy Emittance source Stability ATF.
N. BlaskovicFONT Meeting1 ATF November 2013 shift plan N. Blaskovic.
Tevatron Beam Position Monitor Upgrade Stephen Wolbers (for the Tevatron BPM Upgrade Project) PAC05, Knoxville, TN May 16-20, 2005.
B. Hirosky 12/14/00 FPGA + FIFO replaces: DMA P/IO buffers TSI device Keep ECL drivers BUY THIS! Same Basic Concept as L2Alpha, but with simplified implementation.
LCLS Digital BPM Processor for ATF2 Extraction Line BPMs Steve Smith 26 August 2009.
DAQ 1000 Tonko Ljubicic, Mike LeVine, Bob Scheetz, John Hammond, Danny Padrazo, Fred Bieser, Jeff Landgraf.
S. Smith LCLS Facility Advisory October 12, Beam Position Monitors Facility Advisory Committee October 12, 2006.
S-band processing electronics R. Ainsworth (summer student), S. Boogert, G. Boorman (Royal Holloway) A. Lyapine (University College London) Weekly ATF2.
Current Status of QBPM Electronics and Magnet Movers D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
Rainer Stamen, Norman Gee
RF acceleration and transverse damper systems
LCLS_II High Rep Rate Operation and Femtosecond Timing
The SLAC Instrumentation and Control Platform
Glen White, SLAC Jan th ATF2 Project Meeting, KEK
ATF/ATF2 Control System
ATF/TTF Instrumentation Nov. 27, 2006 Last report: Oct. 2
ILC LLRF Status Ruben Carcagno, Brian Chase
Ewald Effinger, Bernd Dehning
Toward a costing model What next? Technology decision n Schedule
Calorimeter Upgrade Meeting
Electronics requirements for special diagnostics for the XFEL
Photon beamline crates
14BIT 125MHz ADC Board for JPARC-K Status Report Mircea Bogdan August 9, 2007 The University of Chicago.
Low Level RF Status Outline LLRF controls system overview
Data Acquisition (DAQ)
Low Level RF Status Outline LLRF controls system overview
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
The CMS Tracking Readout and Front End Driver Testing
Breakout Session SC3 – Undulator
Presentation transcript:

Status of TTF HOM Project Aug 9, 2005 Project Scope: Instrument both couplers for all SC cavities in the TTF2. (80 channels). System expected to operate as BPM system Expect <~few micron resolution (train average) Expect <~30 micron resolution (bunch to bunch) Expect readout rate ~1 Hz for all BPMs (5Hz May be possible) Want full integration into TTF2 control system.

Hardware Status – Downmix Chassis First Prototype board completed / stuffed Aug 5. Preliminary tests of Gain, Noise, linearity “look good”, should have numbers in a few days. Board designed for machine assembly Parts ordered In principal, just ship parts to vendor for assembly In practice, probably more involved that that, but no serious problems expected Chasses now simplified due to lower board power consumption (~5 W / board). 5 Chasses + spare, to be assembled at SLAC No problems anticipated

Other Hardware VME crate / digitizers: All commercial parts, but need to decide on control hardware. LO source: Synthesizer, amplifier, Fan-out: Straightforward. Calibration reference: Must produce ~1700 MHz tone, locked to harmonic of beam with ~1 picosecond stability Not designed yet (ideas only) – technically challenging. Needs to use TTF triggers, timing signals to produce clean reference

Timing The software / hardware must allow the HOM signals measurements to be correlated with specific conventional BPM measurement pulses. HOM system probably will not run at full 5Hz beam rate, so need method to identify which pulses are measured

Software This probably represents >3/4 of the entire project effort!!! Software architecture determines which VME hardware to purchase Architecture will depend on which group does which part of the work (software can have a steep learning curve). Need to make decisions soon!

Software Components Data Download: 10, 8 channel, 100Ms/s (12 or 14 bit) VME digitizers. For 1 millisecond, get 8M samples / pulse, Can produce up to 80MByte/second data rate. Can run slower, but then this is limits bpm update rate Data Digital Downconversion, filtering to produce I,Q data for each bunch. Matrix multiply (small) to produce X,Y for each cavity. Very approximately 1 Gflop maximum processing required. ~1Gbyte memory. DOOCS Server: 1000 pulses, with X,Y, X’, Y’ for 40 cavities, at 5Hz beam rate. Total possible rate 800KWords / second. Calibration Software: Same concept as existing HOM system but much more complex. Must move correctors, read conventional and HOM BPMs throughout machine. Use MIA, and model dependant analysis to determine cavity BPM calibration coefficients, download to DOOCS server. Does not need real time, but calculations can be complex. Probably have 1 computer as front-end, separate computer for calibration.

Front End Data Download,Digital Down Conversion, DOOCS server. 2 Reasonable Options Standard DOOCS, VME crate controller (Force SPARC-56 CPU) Easy integration with TTF2 Easy Support, (need new driver for digitizers) Low performance (250 specfp2k) SIS VME-PCI bridge Existing drivers for LINUX pc from SIS 80MB/sec transfer demonstrated by SIS ~1600 specfp2k for PC. VME-2e Unique hardware – difficult support

Calibration Computer LINUX PC with Matlab probably the most reasonable solution. Interface with front end computer through DOOCS. Are large data transfers (1GB) in DOOCS OK? If we use a PC (PCI-VME bridge) for front end, can probably use same computer for calibration.