Kootenai River / Kootenay Lake Burbot Conservation Strategy

Slides:



Advertisements
Similar presentations
Yellowtail Dam & Bighorn Lake Billings, Montana October 18, 2007 RECLAMATION Managing Water in the West.
Advertisements

Columbia River Initiative State Proposal – Discussion Draft April 2004.
Placer County Water Agency Middle Fork American River Project Placer County Water Agency Middle Fork American River Project Update on Proposed Project.
2007 Water Supply Summary Idaho Department of Water Resources.
1 Supplying Water in an Uncertain Future: Including Issues of Water Resources, Wastewater Treatment, and Stormwater Management Roland Steiner Washington.
Spokane River PCB Source Assessment Washington State Department of Ecology Spokane River Forum May
Alan Hamlet Dennis P. Lettenmaier JISAO Climate Impacts Group and the Department of Civil Engineering University of Washington March, 2001 CIG Water Resources.
WATER TEMPERATURE MODEL FOR BRANCHED RIVER SYSTEMS.
31 DECEMBER VARIABLE FLOOD CONTROL DRAFT FOR LIBBY RESERVOIR U.S. Army Corps of Engineers Northwestern Division, North Pacific Region.
Yellowstone River Compact Commission Technical Committee Discussions Sheridan County Courthouse Sheridan, WY April 24, 2007 Bighorn Reservoir operations.
LT: I can explain positive and negative impacts of building a dam.
Bastian Richter. Snow Reliability of Ski Resorts Ski Resorts today = 100% % of “Snow- Safe” Ski Resorts.
WATER ENERGY. By Joe Randall Ryan Gorka Alex Nill WATER ENERGY By Joe Randall Ryan Gorka Alex Nill.
Yellowtail Dam & Bighorn Lake Operating Criteria Review Billings, MT September, 2010 RECLAMATION Managing Water in the West.
Title Slide HISTORICAL BACKGROUND of COLUMBIA RIVER TREATY HISTORICAL BACKGROUND of COLUMBIA RIVER TREATY.
Columbia River Water Management Program (CRWMP) Review of Year One Upper Crab Creek Planning Unit Meeting April 17, 2007.
United for the benefit of all Regional Coordination.
Manitoba’s 2011 Flood Mark Lee, M.Sc., P.Eng. Manager, Surface Water Management Manitoba Conservation and Water Stewardship January 29 th, 2013.
PROJECT DATE April 18, 2011 Sue Ireland Kootenai Tribe of Idaho Kootenai Valley Resource Initiative and KVRI Burbot Subcommittee Kootenai River Burbot.
Water Right Settlement Pyramid Lake Paiute Tribe.
♡ Hydroelectric Power ♡ Allyson Rosell, Danielle Pierre.
Biogeochemical And Hydrologic Processes of Tempe Town Lake Marissa Raleigh.
CANADIAN COLUMBIA RIVER FORUM Biological Opinion: An overview of The impacts on Water Management Jim Barton, Chief of Corps of Engineers Columbia Basin.
Visit by Government Officials from Mozambique COLUMBIA RIVER SYSTEM BRIEFING III U.S. Army Corps of Engineers Northwestern Division North Pacific Water.
Northwest Power and Conservation Council slide 1 The Columbia River Treaty John Shurts General Counsel Northwest Power and Conservation Council Portland,
Chronological is the arranging of events in their order of occurrence in time. For example, the use of a timeline or sequence of events.
Hydro Power Plants A dam is built to trap water, usually in a valley where there is an existing lake. Water is allowed to flow through tunnels in the dam,
Boysen/Buffalo Bill Reservoir Operations John H. Lawson Area Manager Wyoming Area Office April 24, 2007.
Libby Dam June 2006 Spill: Total Dissolved Gas Monitoring.
Cost and Energy Impacts of Fish and Wildlife Operations NW Power Planning Council April 3, 2002 Boise, Idaho.
Visit by Government Officials from Mozambique COLUMBIA RIVER SYSTEM BRIEFING IV U.S. Army Corps of Engineers Northwestern Division North Pacific Water.
Hydroelectric Power By: Hailey Mari, Sarah Novak, William Russell, Justin Zuzak, Amber Harshman, and McKenzie Henderson.
U.S. Army Corps of Engineers Wilmington District Real-Time Conservation Pool Storage Accounting for the Falls Lake Project.
Evaluation of Columbia River Sustained Hydro Peaking Capacity Eric King / Mary Johannis PNW Resource Adequacy Technical Committee Meeting May 31, 2006.
Chapter 1 Section 2 Water forms of PA. I. Rivers and Tributary Systems  3 major river systems – The Allegheny  Western PA  Actually consists of 3 major.
Flowing to the Future: Climate Change and Elk River, British Columbia Stewart Rood H2oh! Workshop, Sparwood, May 2011.
Experiences From the Columbia Basin British Columbia, Canada Commission for Environmental Cooperation of North America Joint Public Advisory Committee.
Title Slide HISTORICAL BACKGROUND of COLUMBIA RIVER TREATY HISTORICAL BACKGROUND of COLUMBIA RIVER TREATY.
Water Balance for the Lower Colorado River Basin: Impacts of Water Efficiency BRUK BERHANU 11/26/2013.
Hydro Power MAKWANA VIPUL B.( ) BHAGAT ARJUN C. ( )
BC MoE Burbot Recovery Progress 2007 Kootenai Burbot Conservation Strategy.
Flow Meeting 2004 Biop Litigation September 29, 2005 Jim Litchfield Montana.
Curtis DeGasperi - Foster Wheeler Tarang Khangaonkar – Foster Wheeler
HYDROELECTRIC POWER Brandon Terry.
Climate Resilience for the Upper Columbia River
Date of download: 10/19/2017 Copyright © ASME. All rights reserved.
Libby Flows and Kootenai River White Sturgeon
Date of download: 10/25/2017 Copyright © ASME. All rights reserved.
HYDRO ELECTRIC POWER PLANTS BY Prabhakaran.T AP/MECH
Date of download: 1/2/2018 Copyright © ASME. All rights reserved.
GANDHINAGAR INSTITUTE OF TECHNOLOGY
National parks/ Wildlife reserve/ Conservation areas of Nepal.
Kootenai River / Kootenay Lake Burbot Conservation Strategy
Kootenai Basin Spring/Summer Operations for 2016
The Earth’s Water Sources of Water.
Fall Chinook Management Measures
The Journey of Hydropower in Snohomish County
KOOTENAI RIVER RESIDENT FISH MITIGATION
Burbot Findings
Gavin Point Dam.
Water Level Management on Mississagua Lake Chain Winter and Spring 2013/2014 Ted Spence CCRAI Representative to Coalition for Equitable Water Flow (CEWF)
Highland Lake Reservoir System
Hydro electric (Hydel) Power Plant
The Journey of Hydropower in Snohomish County
Standard 4-1 Workbook “The Water Cycle” Page 6
Hydro electric (Hydel) Power Plant
Kootenai Basin Spring/SummerOperations for 2016
Lake 16 Dam Repair Presentation
UPGRADING WILDERNESS DAM OUTLET WORKS WITH HYDRAULIC GATES
Hydro power This PowerPoint presentation has been downloaded from Presentation written by John Clegg. © Copyright Springer Nature.
Presentation transcript:

Kootenai River / Kootenay Lake Burbot Conservation Strategy Conservation Measures Hydro Operations Update 2010 & 2011

2009 Koocanusa Forebay Temperature Profile

Selective Temperature Withdrawal System Libby Dam Selective Temperature Withdrawal System

Libby Dam Selective Withdrawal System

“Normal” Winter Selective Withdrawal Gate Placement

2010 Winter Selective Withdrawal Gate Placement

2010 Winter Koocanusa Forebay Temperatures

2010 Winter Gate Placement and River Temperature

Libby Dam Mainstem Amendment Reservoir & River

VARQ Storage Reservation Diagram

2010 Koocanusa Draft

?