Summative Evaluation for GEOSS Implementation

Slides:



Advertisements
Similar presentations
GEOSS Data Sharing Principles. GEOSS 10-Year Implementation Plan 5.4 Data Sharing The societal benefits of Earth observations cannot be achieved without.
Advertisements

Work Plan Development Guidelines and Schedule.
Work Plan Development Guidelines and Schedule.
GEO-5 Meeting, November 2005, Ottawa, Canada IGOS-P Input for the GEOSS 10-year Implementation Plan.
22-23 April 2004, the Fourth GEO Plenary Meeting at Tokyo, Japan Overview of Draft Outline, Process, and Schedule of the Implementation Plan Ivan B. DeLoatch,
GEO-5 in Ottawa 1 29 November 2004 Draft GEOSS 10-Year Implementation Plan and Status Report on Reference Document Ivan B. DeLoatch, Toshio Koike, Robert.
UIC Report to the GEO-VI Plenary: Accomplishments, Activities, and Recommendations November, 2009 The UIC Co-Chairs Ellsworth LeDrew, IEEE Carsten.
1 GEOSS Monitoring & Evaluation. 2 1st GEOSS M&E WG meeting outcomes Agreed on 1.the final draft of Terms of Reference for the M&E WG 2.The plan for delivery.
Overview of the Summary Plan for the First Evaluation of GEOSS Implementation Craig Larlee (Canada) M&E WG Co-Chair Joint meeting of M&E WG and ET January.
The GEO Work Plan * 2010 Update (GEO-VI) * New Online Management System Alexia Massacand (Work Plan Coordinator) Rik Baeyens (IT Manager)
GEOSS Common Infrastructure (GCI)
Alan Edwards European Commission 5 th GEO Project Workshop London, UK 8-9 February 2011 * The views expressed in these slides may not in any circumstances.
Makoto Kajii SIT Chair 2010 – th Annual Report on CEOS Implementation of the GEOSS Space Segment Agenda Item accomplishments and lessons.
25th CEOS Plenary | Lucca, Italy| 8-9 November 2011 CEOS Executive Officers Report Agenda Item 17 Timothy Stryker CEOS Executive Officer Kerry Ann Sawyer.
© GEO Secretariat GEO Overview GEO Secretariat September 2007.
Integrated Earth Observations - Building the Bridges - IGOL Theme Team Meeting Sept 2004 Jeff Tschirley Chief, SDRN.
© GEO Secretariat 2.4 Monitoring and Evaluation Activities Craig Larlee / John Adamec Co-Chairs, M&E Working Group GEO 2015 Work Plan Symposium 5—7 May.
GEO Work Plan Symposium 2012 ID-05 Resource Mobilization for Capacity Building (individual, institutional & infrastructure)
© GEO Secretariat GEO WP & 2013 GEO priorities for CEOS Support GEO Secretariat CEOS SIT-28 NASA - Langley March 2013.
CEOS Three-Year Work Plans and Kerry Ann Sawyer CEOS Executive Officer (NOAA) CEOS Plenary, Agenda Item 6 Tromsø, Norway October.
GEO Cold Regions: from Regional to Global effort --- As the interface between SAON and GEOSS Yubao Qiu Vancouver, Canada 29 March 2013.
Report of the Science and Technology Committee GEO Plenary VIII Istanbul, Turkey 16 November 2011.
© GEO Secretariat 5.2 Monitoring and Evaluation John Adamec Co-Chair, M&E Working Group GEO-XI Plenary November 2014 Geneva, Switzerland.
Plenary Session P4: GEOSS Strategic Targets and Their Alignment to Millennium Development Goals and Global Sustainability Research GEOSS Science and Technology.
© GEO Secretariat GEO Work Plan 2nd GEOSS Science and Technology Stakeholder Workshop "GEOSS: Supporting Science for the Millennium Development.
GEO Work Plan Symposium 2012 ID-03: Science and Technology in GEOSS ID-03-C1: Engaging the Science and Technology (S&T) Community in GEOSS Implementation.
GEOSS Evaluation Task Analysis John Adamec GEOSS ET Meeting, Geneva, Switzerand March 22-25, 2010.
CEOS Priorities for 2013 Agenda 3 Kerry Ann Sawyer CEOS Executive Officer CEOS SIT-28 Meeting Hampton, Virginia, USA 12 March 2013.
Task NumberHarmonise, develop & implement capacity building Performance Indicators CB-07-01c Harmonise efforts by Tasks, in particular those related with.
WGISS and GEO Activities Kathy Fontaine NASA March 13, 2007 eGY Boulder, CO.
Task ID_01 “Advancing GEOSS Data Sharing Principles” The Group on Earth Observations Data Sharing Activities for 2013 Reported by Lerato Senoko 29 th EXCOM:
© GEO Secretariat GEO Work Plan Overview Document 20 GEO-VIII Plenary November 2011.
ID 02 CB Performance Indicators Noureddine Filali B. GEO Work Plan Symposium CB side event Geneva, May 01, 2014.
The GEO User Requirements Approach to Achieving Societal Benefits Gary J. Foley, USA Ellsworth LeDrew, IEEE Thierry Ranchin, France Francesco Pignatelli,
The GEOSS Portfolio for Science and Technology Produced by ST (PoC: Hans-Peter Plag,
Report of the Architecture and Data Committee (ADC) R.Shibasaki (ADC, Japan)
© GEO Secretariat Welcome Note on Behalf of GEO S&T Stakeholders Workshop Bonn, Germany 28 August 2012 Barbara J. Ryan Director, GEO Secretariat.
Report of the 6 th GEOSS Evaluation Presentation to GEO-XII 11 November 2015 John Adamec Co-Chair GEO Monitoring & Evaluation Working Group.
The ADC, the CBC and the UIC Where Should These Committees Be Interacting? Gary J. Foley, USEPA Co-Chair User Interface Committee July 20, 2006.
Report from GEO Post-2015 WG and GEO Ministerial WG D. Brent Smith, NOAA CEOS Representative CEOS SIT-28 Meeting Hampton, Virginia, USA 12 March 2013.
Work Plan Work Plan Management (Document 21)
Capacity Building in: GEO Strategic Plan 2016 – 2025 and Work Programme 2016 Andiswa Mlisa GEO Secretariat Workshop on Capacity Building and Developing.
Committee on Earth Observation Satellites CEO Team Plenary Agenda Item #6 29 th CEOS Plenary Kyoto International Conference Center Kyoto, Japan 5 – 6 November.
© GEO Secretariat Work Plan Management Update GEO Work Plan Symposium 30 April – 2 May 2012.
CEOS Response to GEOSS Water Strategy
Reporting, Monitoring and Evaluation
4th Assessment of Progress Against the GEOSS 2015 Strategic Targets
5.2 Monitoring and Evaluation
Summary GEOSS Subgroup Teleconference
GEO WP 1. INFRASTRUCTURE (Architecture and Data Management)
Programme Board 6th Meeting May 2017 Craig Larlee
Capacity building coordination Mark Noort HCP International Andiswa Mlisa GEO secretariat GEO WP Symposium Geneva, Switzerland May 4th, 2016.
GEOSS Data Sharing Principles
IGWCO CoP Overview Richard Lawford
GEO Programme Board Report
GEO-Global Water Sustainability
EWV and Observations WG 3
Work Plan Management GEO Work Plan Symposium 30 April – 2 May 2012
Oceans and Society: Blue Planet
Review of SIT Chair Outcomes
Outcomes from the GEO Ministerial and GEO-X Plenary
CEOS Chair 2016 Introduction
CEOS Chair Priorities for 2017
Links with GEO.
SIT Chair Priorities and SIT-33 Objectives
Workshop on Gap Analysis and Prioritization
WGCapD Perspectives of Work Plan –
CEOS Response to IPWG on Draft GEO Strategy
Proposed Follow-up Space Climate Observatory side-session discussions
Our vision Knowledge creates a sustainable world
Presentation transcript:

Summative Evaluation for GEOSS Implementation The Sixth (Summative) Evaluation is underway to assess the extent of GEO’s success during its first 10 years of implementing GEOSS (2005-2015) General objectives are to evaluate: The extent Strategic Targets have been achieved GEO’s added value to individual members & participating organizations Identifiable factors that have contributed to or hindered success Scope: All Societal Benefit Areas: Agriculture, Biodiversity, Ecosystems, Disasters, Energy, Health, Water, Weather, & Climate All GEOSS Building Blocks: Architecture, Data management, Capacity building, Science & technology, & User engagement

GEO’s Evaluation Strategy Overseen by the GEO Monitoring and Evaluation Working Group (M&E WG) Prepared for GEO Plenaries and member country ministers Intended to inform future plans for GEOSS implementation Past evaluations: Mid-term evaluation (2009-2010) extended across all GEO activities Evaluations 2-5 (2010-2014) individually addressed 2-3 GEOSS Strategic Targets at a time The ongoing Summative Evaluation will be completed by June 2015 to inform the next GEOSS Implementation Plan (currently in development by the IPWG) An interim report is due to the IPWG by late January 2015

Participate in the Summative Evaluation How to contribute: Complete the Evaluation’s survey Participate in an interview with a member of the Evaluation Team Suggest potential interviewees Submit or identify relevant documents Provide any information relevant to GEOSS progress and added benefit to the earth observation community Planning to interview CEOS members at CEOS Plenary (October 28-30) Contact information: Evaluation Team co-chairs - Lars Ingolf Eide (l-ingo-e@online.no) and Matthew Druckenmiller (mdruckenmiller@usaid.gov) Evaluation Team’s representative to CEOS – Yukio Haruyama (haruyama_yukio@restec.or.jp)