RISER PROJECT F bathroom.

Slides:



Advertisements
Similar presentations
ADA Enhanced Condo Client: Kelly Heller Blind 48 years of age Sculptor
Advertisements

INTD 59 bathroom design basics. five basic steps in bath design 1.gathering client & project information 2.setting priorities 3.researching and selecting.
4/30/20151 Universal Design – Remodel Kitchen and Bath Tom Muxie.
Chapter 20 Plumbing Plans.
Wilson School Construction 2014 Tearing out the old courtyard to put in the new sewer line.
Chapter 11, Section 4. Changing a Shower Head 1.Turn off the water. 2.Remove the old showerhead. 3.Clean the showerhead stem of any corrosion or buildup.
Using the Sandblaster.
Hogan Residence Bathroom Remodel Valued Repeat Customer Kitchen Remodel (see other presentation) Basement Bathroom Addition (see other presentation) Upstairs.
BATHROOMS Objective Bell Ringer 11/4  Work with your table groups to brainstorm and make a list of at least 10 technological “gadgets” used in.
This was the existing floor Original floor in bathroom, 12” x 12” adhesive backed vinyl tiles.
Week 3. Electrical Code 1. all electrical outlets run off a pigtail from main line 2. Each Circuit is wired directly into circuit panel - no junction.
Room Relationships and Sizes
Chapter 12 Sleeping Areas Types of Sleeping Areas Bedrooms Average size – 100 to 200 square feet 3 items must accommodate a minimum size bedroom –Single.
BRVFD & RS Training Facility Proposal 05/07/2009.
Affordable housing project
Final Assignment part 1: revise stairs Some minor markups.
Bathroom Notes Chapter 24. Types of bathrooms: Master Bath –A full bath –Part of the master bedroom area.
By Angela Forte, Michelle Gagnon, Kerri Morse, & Sam Oosterman.
Introduction to Plan of a building Instructor Engr Kamran Khan Department of civil engineering City University Peshawar.
Bathroom Remodel Checklist Tel: Fax:
7.02 Bathrooms. Types of Baths _________________/powder room - sink & toilet only _________ bath - sink, toilet, ______________/shower ________ bath –
Installing A Bathroom Shower Panel American Bath Enterprises, Inc. The Bath Tub & Shower Enclosure Innovators!
Substrate Identification Floors. Principal Substrates T & G floorboards Flooring grade boards Concrete Screeded concrete Tile Backer Boards Under Floor/Under.
Mrs. Chelsea’s 4 th Grade Class Welcome to our class!
FD Iskandar Sell Your Home Quickly And Lucratively
7.02 Bathrooms.
MICROSOFT PROJECT MODULE 2 - BUILD A HOUSE.
MESSIAH COLLEGE MAIL HOW IT WORKS!!!.
Gamble Rogers 2018Washington, DC Trip.
Assembly And Installation Of Ikea Kitchen Cabinets
TOT SPOT proposal.
Wasatch County Junior Turkey Program
Amazing Natural Light & Great Outdoor Living
Objective 7.02: EXPLAIN the essentials of home baths
Bathroom Fixtures and Design
Electrical Gas Plumbing Heating & Cooling
Your Bathroom Remodeling Priority? CALL (888) AND WEBSITE IS
A Guide To Renovate Your Bathroom & Kitchen
Also strongly recommended:
F Bathroom and E bedroom wall
Both D bathrooms and e kitchen What makes you special!
Consulting Captains, LLC
RISER PROJECT L, m, l/m kitchen.
Eliminating the Variance
G kitchen What makes you special!
April 4-5, 2018 The Four Seasons Baltimore
Milestone: Things to Know
Spackling expert will do fine work General Home Improvement
J bathroom/ hi bedroom/ I kitchen
ELEVATOR CLOSURES: JANUARY-FEBRUARY 2019
    ANNOUNCEMENTS 8/24/18.
    ANNOUNCEMENTS 8/30/18.
L.E.A. Data Technologies Introduction.
n/o back to back kitchens
A/B and h/i TIER back to back bathrooms
C bathroom/AB and B Kitchens
Bathroom renovation Masters build.
Student Orientation to ALEKS Higher Ed
Key PTC Payroll Items.
    ANNOUNCEMENTS 9/6/18.
Floor Plans and Symbols
Welcome to Middle School Art
Also strongly recommended:
    ANNOUNCEMENTS 8/23/18.
    ANNOUNCEMENTS 9/7/18.
    ANNOUNCEMENTS 9/11/18.
Forestbrook Middle School
New products Summer – Fall 2017.
Section 6 – Attach Invoice Image & Submit Batch Report
Sixth Grade Procedures
Presentation transcript:

RISER PROJECT F bathroom

The lay of the land

Wall opening for pipe exposure Bathroom

Temporary shower wall

Bathroom fixtures out with the old! Not to city of Chicago code To city of Chicago code

Throne/water closet/commode, by any other name, is still a toilet! before after

Sloan valve Toilet replacement We can provide a two piece toilet with a round or oblong bowl that is comfort (ada) height The cost for this is $220 If you prefer to get your own toilet, let the office know and we will have the plumber come to your unit to measure the rough-in dimension. You can then order it with that information it must be in your unit the day that we start your plumbing The association will provide the installation for the one you purchase , as long as there is no feature requiring wiring

Tile replacement In each unit, where we will remove a wall with tiles on it, the association will Reimburse that owner up to $187 to buy tiles of their own choice. The condo owner will make sure the tiles are in their unit at the time the contractor is ready to install them. Provide an invoice to be reimbursed.

Tile replacement continued The association will pay for the removal and the installation of 55’ of ceramic tile surrounding the tub. If you choose to not use the association contractor/want to install tiles of other material, or want more square footage, A reimbursement check will be provided for up to $995. provide a copy of your invoice.

TILE REPLACEMENT continued if you have re-done your bathroom, and still have enough extra tiles left over, from your remodel, have them in your unit when the riser work is finished there. The selected contractorS will install ceramic tiles, ONLY. If you have glass or stone (marble, granite, etc.) tiles then, the owner will need to negotiate with the contractor for the installation. Submit an invoice and, the association will reimburse up to $995.  

Some positives… Cleaner water Hotter water Better water pressure Shut-off valves are concealed No more sloan valve toilet noises in the middle of night!

General information Work will be done from 8am until 5pm, Monday thru Friday Water will be shut off, on that riser throughout the workdays At the end of each day there will be water in the bathroom fixtures When the water is turned back on, it might have low pressure or be discolored, let it run a couple of minutes. The pressure may remain low throughout the duration of the project There will be a lot of noise The service elevator will be used intermittently to bring in pipes, etc. When riser is complete, the walls affected will be patched and prime coated

Time line (using the term loosely) The contractor will start removing the wall sections from the top floor down, on Wednesday, February 20. Soon after, the plumbers will follow them. the plumbing and construction will take approximately 4 weeks This estimation does not include any tile replacement

How to prepare Provide a copy of your unit key. Not providing a key is not an option If you do not have a duplicate key – have one made All keys will be kept until after that riser is complete – you may not pick them at the end of each day Keys will be kept in the management office

How to prepare - continued Plumbers and contractors will be coming in and out of your units throughout the project If you have pets - who want to bolt out the front door - put them behind a closed door or gate Put a post-it note on your door saying how many and what type of animals that you have, that are ambulatory Cover the furniture in the area where work is being done

How to prepare - continued All of these ‘Housekeeping’ items should remain, in place, for the duration of the project Remove items in and on your vanity cabinets Remove everything in the shower/tub that is on the plumbing wall (shampoo caddy etc.) Remove everything on or around your toilet

How to prepare - continued move any over-the-toilet storage units or artwork from the plumbing wall Clean out medicine cabinet Clear a 42” wide path from your entry door to your bathroom

After… When the plumbers and contractors are finished in your unit- the demolished walls will be patched and prime coated. If your tile was removed, The association will not be responsible for scheduling/coordinating the tile work. Only you know what your schedule is. Because of so many unexpected delays, we don’t recommend you reaching out to a contractor until all of the work is complete.

After, continued… two contractors who are reasonably priced and have been working in the building, throughout the project are Ratko nikolic 773-330-3058 Oscar Ramirez 773-971-8987