X-rays in A4L2-A4R2 and A4L8 - A4R8 V. Baglin (19/11/11)

Slides:



Advertisements
Similar presentations
Here is the broken line. Step 5: Break loose encasing seal. With bar in vice as show, hit with hammer to break loose. Usually 2 or 3 hits will break loose.
Advertisements

Going towards LHC Run2 CRYOGENICS 5 th Evian Workshop 2-4 June 2014 SESSION 4 - Systems 2 - Status and commissioning plans (HW perspective) Krzysztof Brodzinski.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
 Next - Previous  Horizontal Bar  Vertical Menu.
LHC VACUUM SYSTEM: 2012 REVIEW AND 2014 OUTLOOK G. Lanza, V. Baglin, G. Bregliozzi, J.M. Jimenez EVIAN 2012.
Vacuum, Surfaces & Coatings Group Technology Department Cleanness of the 3-4 cold beam lines Outline:  History: Status of 2009 cleaning  Foreseen and.
Few slides from J. Fox’ talk in last November’s LARP meeting LARP CM
1 Vacuum – Much Ado about Nothing V. Baglin with inputs from P. Cruikshank CERN TE-VSC, Geneva Vincent Baglin LHC Performance Workshop - Chamonix 2011.
ECRs and ES for the LHC Last presentation on the 26 th of August 2015 (LMC 232) S. Chemli for EN-MEF-DC LMC xxx.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
Recent Electron-Cloud Mitigation Studies at KEK E-cloud mitigation mini-workshop on November at CERN Kyo Shibata (for KEKB Group)
Vacuum, Surfaces & Coatings Group Technology Department (some) Other non-solved NC across the LHC ring and potential impact on performances V. Baglin.
4 December 2007Sylvain Weisz - LEMIC1 Status of LHC installation.
US AFEB timing in CSCs in splash events, run N. Terentiev, CMU CSC Synchronization meeting Nov. 16, 2009, CERN.
TE-CRG Activities D. Delikaris, TE-CRG.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 30/08/2013LSC - S. Baird, M. Bernardini1.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 20/09/2013LSC - EN-MEF-OSS1.
Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE) Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE)
Conceptual Physics Concept Test Questions Gravity The following slides were created through a collaboration of the Industry Initiatives in Science and.
LHC schedule status K. Foraz EN-MEF 12/04/2013LSC - K. Foraz1.
The Power of Lightroom Mark Segal Roger Dallman
Results of short module and qualification strategy
Mikhail Ovsienko TE-MPE-EE
LIU and TE/VSC activities Status September 2016 LIU-SPS aC coating & flange impedance reduction Paul Cruikshank on behalf of TE-VSC LIU & TE-VSC, 19/9/2016.
41. MC buyer side create quick post qbs and regular qbs /// where is the “click here” to view vendor who will be notified?
Alignment of VSC components along LSS 1&5
TE-MSC activities in SPS during LS2
BA6 – crab cavity activities in EYETS
Status of LHC installation & New Installation Schedule
LEP cryostat Procurement strategy and plans
Area Between Two Curves
on behalf of the RF group
Long Shutdown for the LHC: Vacuum Beam Pipes
LHC Beam Vacuum activities during YETS LS2
LHC-TS3 Coordination meeting #3
Consequences of warming-up a sector above 80 K
Electron cloud & vacuum pressure observations: 2011 proton run
SPS Planning for the EYETS Meeting 8 (07/12/2016)
TE-MSC activities in SPS during YETS
K. Foraz on behalf of OSS members
Vacuum Modules in LHC Septa V. Baglin (10/4/12) CERN TE-VSC, Geneva
Which of the following graphs is the graph of the derivative of the function {image} . 1. {applet}
Find the linearization L(x, y) of the function at the given point
TDI with large gaps V. Baglin (21/10/11) CERN TE-VSC, Geneva
Plain Mirror Style SNC2D
TCTVB-VMTSA-TCDD area Xrays at 4L2
Creating a grid by Carl Dellutri.
Bitwise Operators CS163 Fall 2018.
X-Rays made by P. Lepeule (TE/VSC) and J-M Dalin (EN/MME)
IR2 aperture measurements: results, actions and proposal
Typical NC in Warm Modules Following X-ray campaign
Transformations Day 1 Notes Slideshow.
Bridge through Ten Addition
How to Change the Images
Base Right X T G C G T TE QB 3 2.
LHC installation status
LHC Collimator – RF Contact Concept (180o wrap)
How to Open PowerPoint Maryam Fatima.
АВЛИГАТАЙ ТЭМЦЭХ ҮНДЭСНИЙ ХӨТӨЛБӨР /танилцуулга/
The LHCb VErtex LOcator
Multiple Choice Quiz.
Optics.
Beginning Sounds! Match It! Click here to play..
SPS Planning meeting for LS2 #16 Vacuum sectors situation
It's time for some trashketball!!!.
python
Vacuum Modules in LHC Experiments V. Baglin (26/3/12)
Preliminary Results of MD wk46 V. Baglin, G. Bregliozzi, P. Chiggiato,
Repair campaign 2017 Repair campaign 2016 Repair campaign 2015 TS2 TS1
Fig. 3 Results of the proposed algorithm applied to a detail from the Adam panel. Results of the proposed algorithm applied to a detail from the Adam panel.
Presentation transcript:

X-rays in A4L2-A4R2 and A4L8 - A4R8 V. Baglin (19/11/11) CERN TE-VSC, Geneva 1. Positions of defaults 2. Typical default 3. Summary LMC - 16th November 2011

Positions of defaults in LSS2-LSS8 TCDD VGPB.120.4L2.X LSS2L : TCTVB TCDD VAB BPMSX D1L2 D1L2 VPIA.A151.4L2.X TCLIA LSS2R : D1R2 BPMSX VAB VCTCQ TCTVB TCLIA VGPB.120.4R2.X D1R2 VPIA.A170.4R2.X TCLIA VGPB.120.4L8.X LSS8L : TCLIA TCTVB VCTCF VAB BPMSX D1L8 D1L8 VPIA.A173.4L8.X VGPB.120.4R8.X LSS8R : D1R8 BPMSX VAB TCDDM TCTVB D1R8 VPIA.A147.4R8.X

Spring was broken between May and November 2011 Typical default, DCUM 3259.3524 Left side Side view (xray from corridor to QRL) b) Metallic noise due to loose spring when hitting vacuum chamber c) RF fingers falling due to broken spring d) aperture reduced ? Non Conform b d Spring was broken between May and November 2011 c

Summary 6 vacuum modules in LSS2 and LSS8 have falling fingers due to broken springs There are no significant reduction of aperture LSS2 : -During X-ray campaign of the 10th and 12th of May, all the RF fingers were in correct position and the springs were not broken LSS8 was not imaged before last week Other modules from D1L2 to D2L2, D1R2 to ID800,R2 , D1L8 to D2L8 and D1R8 to D2R8 which have been imaged are conform The 6 non-conform modules will be repaired at next X-mas break during the opening of the sectors for the ZDC upgrade and dedicated opening for sectors in LSS8

Bonus slides

VMTSA son of VAMTF.A4L2.X Horizontal ellipse 180/70 Left side Right side LHCVMTSA0001

X-rays the 10-5-2011, DCUM 3259 b Right side Top view (xray from top to bottom) b) No metallic noise due to loose spring Conform

(to be replaced when possible) X-rays the 12-5-2011, DCUM 3404.58 a b Left side Top view (xray from top to bottom) a)Slight deformation of RF finger. b)No metallic noise due to loose spring Use as IS (to be replaced when possible)

(to be replaced when possible) X-rays the 12-5-2011, DCUM 3404.58 b Right side Top view (xray from top to bottom) a) RF fingers bent towards exterior b) No metallic noise due to loose spring – spring in place Use as IS (to be replaced when possible) b