District Metered Areas

Slides:



Advertisements
Similar presentations
Return on Investment: Training and Development
Advertisements

Intelligent Pressure and DMA Management
Configuration Management
TILDE DST & DMS Software Decision Support Tool & Data Management System for Leakage and Water Loss Management.
NONREVENUE WATER - Current and Future Remedies Gary Harstead Director – Asset Management United Water NARUC Winter Meeting February 2013.
A BETTER TOMORROW made possible Canadian Utilities Learn to Fly through Benchmarking of Water Loss Management Christine McCormack, P.Eng. September 13.
THE DEVELOPMENT OF LABUAN WATER-SUPPLY GIS (LWS GIS)
Student Book © 2004 Propane Education & Research CouncilPage Placing Appliances into Initial Operation Knowing the proper techniques and.
Performance-based Leakage Reduction and Management Services SAWACO Zone 1 Training and Transfer of Technology.
Benefits of A Prepayment System Elimination of connection and disconnection costs Improved cash flow – Electricity paid for before use. Consumer can budget.
EFICAZ Project Project for Capacity Development on NRW Control for SABESP Water Loss Control Management SHIMOMURA Masahiro JICA Expert SABESP EFICAZ Project.
Non-Revenue Water Management : The Case of Entebbe , Uganda
IPN – Israel Water Week Improving the Water Service: The Case for Replicating Manila in Mexico Gerardo Angeles Castro Economic Development Network - IPN.
National Urban Waste Water Study (Covers catchments with a population equivalent of 2,000 or more outside the Greater Dublin Area) Department of the Environment,
Session No. 3 ICAO Safety Management Standards ICAO SMS Framework
TECHNICAL ASSOCIATION OF THE EUROPEAN NATURAL GAS INDUSTRY Development of a Eurogas-Marcogaz Methodology for Estimation of Methane Emissions Angelo Riva.
New Decade - New Challenges Annual Conference September 2010 Water Services Training Group 14 th Annual Conference New Decade – New Challenges 9 th September.
Placing Vapor Distribution Systems and Appliances into Operation MODULE 8 System Tests.
WSNTG Annual Conference 8 th September 2005 WSNTG 9 th Annual Conference “Water Services Strategic Plans – Fact or Fiction”
VISITBASIS Introduction and System Overview. I NTRODUCTION About VisitBasis VisitBasis Retail Execution is a cloud-based complete mobile data collection.
Chapter 10 Information Systems Analysis and Design
Water Services National Training Group Best Practice in the Management of Drinking Water.
Chapter 16: The Federal Reserve and Monetary Policy Section 2
1 CTC 450 Review Water Processes. 2 Objectives Understand the basics with respect to operation of waterworks.
Developing a Non- Revenue Water Strategy
LELEA’S NEW WATER UPGRADE AND NEW WATER MANAGEMENT.
S15: Supervision and review. Objective of supervision and review  To ensure that the audit is done efficiently and effectively so that the audit opinion.
Student Book © 2004 Propane Education & Research CouncilPage Performing Gas Distribution System Leak Checks Requirements for vapor distribution.
Tier 2 Power Supply Planning Workshop Advanced AMI Benefits Overview.
Financial Management Glencoe Entrepreneurship: Building a Business Analyzing Your Finances Managing Your Finances 21.1 Section 21.2 Section 21.
The Smart Network: NRW, Pressure and Asset Management
Water Services Trust Fund Financial Support for Improved Access to Water and Sanitation FROM INFRASTRUCTURE TO SERVICES: Importance of WSPs’ Presence in.
Restructuring of the Finnish Infrastructure Administration Draft
PILOT PROJECT ON NRW IN SHEETAL PARK AREA OF RAJKOT CITY IN GUJARAT Danish Water Forum AND Rajkot Municipal Corporation.
 TATA CONSULTANCY SERVICES MM - INVOICE VERIFICATION.
Slide 1. © 2012 Invensys. All Rights Reserved. The names, logos, and taglines identifying the products and services of Invensys are proprietary marks.
| Performance Based NRW Reduction Contracts The case of HoChiMinh City Bill Kingdom.
Case study of Velika Kladusha (B&H), Lipjan (Kosovo) and Kochani (Macedonia) Vienna, 13 May 2016.
Financial and Operational Performance Improvement Programe (FOPIP) Danube Water Conference 2017, Vienna, May 18 Training session on Local governments’
Danube Water Conference 2017, Vienna
SC Rural Water Conference 2016
4/14/2018.
DZ11 Qweisma.
DZ01 – Marka D B E C B G A B C.
Configuration Management
A ‘Value for Money’ monitor that takes account of Customer Satisfaction, Quality and Investment (also know as ‘3 legged stool’) .... helping.
Water Service Forum By Cecil Kekana 24 May 2017.
14 Refrigerant Recovery, Recycling, and Recharging.
WSP quality assurance tool
By Dr Mohammed Al-Waqfi Technical Monitoring & Auditing Manager
Configuration Management
CTC 450 Review Water Processes.
Procurement: Use of Metrics
DATA for ACTION Edna Yohei Malaisé
Model of block distribution system (Fukuoka City Waterworks Bureau)
NextGen Utility Billing
Water Distribution Networks Under Intermittent Pumping: Development of a hydraulic model and Assessment of water losses Prepared by Mohammad Jihad Abdo.
Operations and Maintenance
Night Flow Measurement, Step Testing, Leak Detection Equipment
Operations and Maintenance
Organisational NRW Management
QGIS, the data model, use and storage
Part of Module Asset Management: Operation and Maintenance
Introduction to NRW Introduction to IWA Water Balance, NRW components and Performance indicators.
QUALITY MEASURES IN 2013 POPULATION AND HOUSING CENSUS
Commercial NRW Reduction
Setting Performance Objectives/ Targets
Sandro Zeničanin Ivana Torbica KP ’’Vodovod’’ a.d Gradiška
Custom WordPress Development Services - All You Need to Know.
Risk Management Student Powerpoint
Presentation transcript:

District Metered Areas DMA creation and management

Contents Introduction DMA Creation DMA Management

Introduction

District Metered Areas A District Metered Area (DMA) is a hydraulically isolated and completely metered section of the complete water network Introduction

DMAs for NRW management To be able to analyse the level of NRW, the problem should be divided into manageable pieces. By creating DMAs as NRW reduction/management pilot areas, NRW can be analysed in more detail and the effect of NRW reduction measures monitored Furthermore, a DMA serves as a good tool to make a business case for NRW reduction, because it allows for: Faster results (in comparison to working with the complete network) Action – even when the company is not yet fully supportive of the approach, as a smaller investment and number of staff is needed The creation of commitment to NRW management by showing quick results in a small area Less investment costs Introduction

2. DMA Creation

DMA selection criteria For the creation of DMAs, the water distribution network should be sectioned in hydraulically isolated and separately measured zones. Important criteria for selecting a DMA include: Knowlegde of network and assets: (verified) GIS data is essential ‘High NRW’ area (commercial and/or physical losses) Not too big, not too small, plus/minus 500 connections Easy isolation (clearly visible topographical points that can serve as boundaries for the DMA, such as rivers, roads, railway tracks, etc.,) which helps to: Save in investment costs Make it easier to identify the customers connected in the zone Ideally, water availability 24/7 and good pressure.(a lack of water and low pressure levels undermine the reliability of the meter readings) No immediate plans for network changes DMA creation

DMA creation To isolate the DMA, it is required to: Further verify the GIS data Install meters and valves in tamper-proof chambers on all incoming and outgoing lines Verify, by closing the valves on incoming lines and checking whether or not customers still receive water, which customers are located in- or outside of the DMA. This exercise will reveal: Whether the GIS has captured the network as it truly is Which customers should be in –or excluded from the DMA’s customer base Results from water balance calculations can also indicate (for instance by showing particularly high or low NRW) incoming or outgoing lines that were left out and still need to be disconnected or metered. DMA creation

Assets to install Valve Bulk water meter To be able to close the DMA (and verify whether it is hydraulically isolated) Bulk water meter Measures the quantity of water flowing in and out of the area Strainer (before the water meter) To collect the dirt out of the water main and protect the water meter Straightener?????? Bring back the turbulence in the water Valve before or after meter, at what distance???? Etc DMA creation

3. DMA Management

Caretaker approach A caretaker is: Responsible for the supervision of NRW reduction plans and activities in a specified service area, including standard operating procedures such as: Opening/closing the boundary valves (DMA must always be closed) Network planning Leak detection and repair Monitoring the quality of repairs and installation of new house connections Execute preventative maintenance programmes Water meter calibration (and necessary replacement) The search for illegal connections The “eyes and ears“ of the water company in this area A point of reference for the customers in this area Informing customers on network activities Taking note of – and action on - customer complaints Report on experience in the area (NRW, customer satisfaction, illegal connections, repair, maintenance and needed materials, etc.) to a supervisor Advise the supervisor on management plans and activities that need third parties

What does a Caretaker need? A caretaker needs: A team (of plumbers, meter readers, GIS specialist etc.) with whom the activities in the area can be performed To be given due status and autonomy to be able to steer his team To be given (timely) access to needed materials and people to be able to perform the planned activities in the area Experience with NRW and leading a team To be held accountable