Motives and design of future CMS tracker

Slides:



Advertisements
Similar presentations
ATLAS-CMS SLHC Workshop, 20/3/07 Costas Foudas, Imperial College London 1 Results from Studies for a Tracking Trigger for CMS at SLHC Overview of this.
Advertisements

The Belle Silicon Vertex Detector T. Tsuboyama (KEK) 6 Dec Workshop New Hadrons with Various Flavors 6-7 Dec Nagoya Univ.
Track Trigger Designs for Phase II Ulrich Heintz (Brown University) for U.H., M. Narain (Brown U) M. Johnson, R. Lipton (Fermilab) E. Hazen, S.X. Wu, (Boston.
SBS Hadron and Electron Calorimeters Mark Jones 1 TexPoint fonts used in EMF. Read the TexPoint manual before you delete this box.: AAA A.
1 ACES Workshop, March 2011 Mark Raymond, Imperial College. Two-in-one module PT logic already have a prototype readout chip for short strips in hand CBC.
CBC2: CMS microstrip readout for HL-LHC [D. Braga], G. Hall, M. Pesaresi, M. Raymond (Imperial College) D. Braga, L. Jones, P. Murray, M. Prydderch (RAL)
Lauri A. Wendland: Hadronic tau jet reconstruction with particle flow algorithm at CMS, cHarged08, Hadronic tau jet reconstruction with particle.
Simulation Studies of a (DEPFET) Vertex Detector for SuperBelle Ariane Frey, Max-Planck-Institut für Physik München Contents: Software framework Simulation.
CMS Phase 2 Upgrade: Scope and R&D goals CMS Phase 2 Upgrade: Scope and R&D goals October 21, 2014 Jeremiah Mans On behalf of the CMS Collaboration.
The Silicon Track Trigger (STT) at DØ Beauty 2005 in Assisi, June 2005 Sascha Caron for the DØ collaboration Tag beauty fast …
Upgrading the CMS simulation and reconstruction David J Lange LLNL April CHEP 2015D. Lange.
LHC SPS PS. 46 m 22 m A Toroidal LHC ApparatuS - ATLAS As large as the CERN main bulding.
PHENIX Vertex Tracker Atsushi Taketani for PHENIX collaboration RIKEN Nishina Center RIKEN Brookhaven Research Center 1.Over view of Vertex detector 2.Physics.
Silicon Tracking for Forward Electron Identification at CDF David Stuart, UC Santa Barbara Oct 30, 2002 David Stuart, UC Santa Barbara Oct 30, 2002.
09 September 2010 Erik Huemer (HEPHY Vienna) Upgrade of the CMS Tracker for High Luminosity Operation OEPG Jahrestagung 2010.
February 19th 2009AlbaNova Instrumentation Seminar1 Christian Bohm Instrumentation Physics, SU Upgrading the ATLAS detector Overview Motivation The current.
The SLHC and the Challenges of the CMS Upgrade William Ferguson First year seminar March 2 nd
CBC2: CMS microstrip readout for HL-LHC
Electronics procurements Geoff Hall 24 October 2014.
Jornadas LIP, Dez P. Martins - CFTP-IST The NA60 Silicon Vertex Telescopes Dimuon measurements Dimuon measurements Vertex telescope used in: Vertex.
Jeroen van Hunen The LHCb Tracking System. May 22, 2006 Frontier Detectors for Frontier Physics, Elba, Jeroen van Huenen 2 The LHCb Experiment LHCb.
CBC2: a strip readout ASIC with coincidence logic for trigger primitives at HL-LHC D.Braga, M.Prydderch (STFC RAL) G.Hall, M.Pesaresi, M.Raymond (IC) WIT2012.
Non-prompt Track Reconstruction with Calorimeter Assisted Tracking Dmitry Onoprienko, Eckhard von Toerne Kansas State University, Bonn University Linear.
HallA/SBS – Front Tracker PARAMETERDESIGN VALUE Microstrip Silicon Detector Number of tiles/plane and size2 Number of planes2 Size of the single
Operation of the CMS Tracker at the Large Hadron Collider
Design and development of micro-strip stacked module prototypes for tracking at S-LHC Motivations Tracking detectors at future hadron colliders will operate.
1 Mark Raymond ACES Workshop, March 2014 CMS Strips Readout current status future plans.
The ATLAS Global Trigger Processor U. Schäfer Phase-2 Upgrade Uli Schäfer 1.
26 June 2006Imaging2006, Stockholm, Niels Tuning 1/18 Tracking with the LHCb Spectrometer Detector Performance and Track Reconstruction Niels Tuning (Outer.
W. Smith, U. Wisconsin, CMS SLHC EMU Upgrade Workshop, Jan. 8, 2008Introduction to CMS SLHC Triggers - 1 CMS Trig & DAQ for LHC Overall Trigger & DAQ Architecture:
The CBC2 ASIC for 2S Modules at HL-LHC Davide Braga IOP 2014 Joint HEPP and APP Groups Annual Meeting, Royal Holloway, May 2014.
Muon detection in NA60  Experiment setup and operation principle  Coping with background R.Shahoyan, IST (Lisbon)
PT module design and readout Work in Progress The concept does not have to be fully accurate but a concrete picture is needed to expose the major issues.
Marcello Mannelli October 2011 Overview of CMS Tracking Trigger.
Beam Test of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger, A.
LCWS11 – Tracking Performance at CLIC_ILD/SiD Michael Hauschild - CERN, 27-Sep-2011, page 1 Tracking Performance in CLIC_ILD and CLIC_SiD e + e –  H +
CMS Upgrade Workshop - Fermilab Trigger Studies Using Stacked Pixel Layers Mark Pesaresi
The SLHC CMS L1 Pixel Trigger & Detector Layout Wu, Jinyuan Fermilab April 2006.
Christian Lippmann (ALICE TRD), DPG-Tagung Köln Position Resolution, Electron Identification and Transition Radiation Spectra with Prototypes.
Leonardo Rossi INFN Genova - UTOPIA #12 0 What we have learned from UTOPIA so far? Defined a set of gauge histos to compare layouts Exercised on barrel-part.
1 Experimental Particle Physics PHYS6011 Fergus Wilson, RAL 1.Introduction & Accelerators 2.Particle Interactions and Detectors (2) 3.Collider Experiments.
A Fast Hardware Tracker for the ATLAS Trigger System A Fast Hardware Tracker for the ATLAS Trigger System Mark Neubauer 1, Laura Sartori 2 1 University.
SPHENIX Mid-rapidity extensions: Additional Tracking system and pre-shower Y. Akiba (RIKEN/RBRC) sPHENIX workfest July 29,
The BTeV Pixel Detector and Trigger System Simon Kwan Fermilab P.O. Box 500, Batavia, IL 60510, USA BEACH2002, June 29, 2002 Vancouver, Canada.
Iterative local  2 alignment algorithm for the ATLAS Pixel detector Tobias Göttfert IMPRS young scientists workshop 17 th July 2006.
A Time-Multiplexed Track-Trigger for the CMS HL-LHC upgrade
Test beam results of MCz-Si detectors
Scope R&D Participants/Infrastructure
LHC Upgrades: Detectors & Technologies for Flavour Physics
IOP HEPP Conference Upgrading the CMS Tracker for SLHC Mark Pesaresi Imperial College, London.
The ATLAS tracking and vertexing detector
A Level-1 Tracking Trigger in Super-LHC
2018/6/15 The Fast Tracker Real Time Processor and Its Impact on the Muon Isolation, Tau & b-Jet Online Selections at ATLAS Francesco Crescioli1 1University.
Resolution Studies of the CMS ECAL in the 2003 Test Beam
Requirements and Specifications for Si Pixels Sensors
Upgrade Tracker Simulation Studies
A.Rozanov CPPM Highlights of b-layer upgrade workshop
ALICE upgrade plans Paolo Giubellino LHCC Upgrades
The CBC microstrip readout chip for CMS at LHC Phase II
Pixel-strip-EMC tracker and DC option
ATLAS-CMS SLHC Workshop This talk is available on:
The Silicon Track Trigger (STT) at DØ
SLHC Upgrades CMS Perspectives
Reddy Pratap Gandrajula (University of Iowa) on behalf of CMS
Experimental Particle Physics PHYS6011 Putting it all together Lecture 4 6th May 2009 Fergus Wilson, RAL.
Niels Tuning (Outer Tracker Group LHCb)
8th International Conference on Advanced Technology and
Experimental Particle Physics PHYS6011 Putting it all together Lecture 4 28th April 2008 Fergus Wilson. RAL.
The LHCb Level 1 trigger LHC Symposium, October 27, 2001
The LHCb VErtex LOcator
Presentation transcript:

Motives and design of future CMS tracker Tracker replacement essential for Run 4 (post-2025) because of radiation damage and high pileup LS3 - 30 months 2023-2025 Trigger must be substantially upgraded to handle high pileup -> Linst ~ 5 x 1034 cm-2s-1 (levelled) => <Nev> ~ 140 – 200 Calorimeter issues isolation of e/g/t degraded by pile-up from p0 gs and hadrons many more jets, which overlap Muon system issues increased combinatorial fakes, enhanced by multiple scattering To control much higher rate of L1 triggers only significant new data comes from tracker Geoff Hall Elba 2015

Silicon tracker with trigger-stub capability ~15000 modules transmitting pT-stubs to L1 trigger @ 40 MHz full hit data to HLT @ 0.5-1 MHz Geoff Hall

Stacked-tracker principle Compare pattern of hits in contiguous sensor elements in closely spaced layers pT cut set by angle of track in layer primarily depends on layer separation but increasing separation worsens fake combinations details depend on pitch thickness charge sharing track impact point … EXP. pT cut: 2.14 GeV/c FIT: pT cut: 2.17 GeV/c σ: 0.1 GeV/c data from 2013 beam test assumes r=75cm layer Geoff Hall Elba 2015

CMS Tracker ASIC evolution RAL TD-Imperial 1999: APV25 0.25µm 2011: CBC 0.13µm 2013: CBC2 0.13µm 7 mm x 8mm (128 chan) 7mm x 4mm (128 chan) 11mm x 5mm (254 chan) pipeline 128x192 128 x preamp/shaper APSP + 128:1 MUX pipe logic bias gen. CAL FIFO control logic pipeline 128 x 256 pipeline 254 x 256 analogue data ~4 µs latency binary data, 6.4 µs latency wire-bondable 2015: CBC3 (final – in layout) up to 12.8 µs latency (512 bx) bump-bondable, cluster & correlation logic Geoff Hall Elba 2015

Geoff Hall

reconstructed pT cut of r=75cm layer Module status EXP. pT cut: 2.14 GeV/c FIT: pT cut: 2.17 GeV/c σ: 0.1 GeV/c 2S-modules furthest advanced – several beam tests Dec 2013: DESY test beam June 2015: mini-module with irradiated sensors in CERN Nov 2015: first full-size module in H6 test beam reconstructed pT cut of r=75cm layer 6 Geoff Hall