Pellet Target developments

Slides:



Advertisements
Similar presentations
CBM slow controls CBM collaboration meeting DAQ work group CBM collaboration meeting DAQ work group Burkhard Kolb GSI1.
Advertisements

Oak Ridge SNS Experimental Facilities X /arb 1 SNS MPS Review Target-MPS Review WBS Ron Battle Target Controls, Target Systems Experimental.
Data acquisition and control system for HEDP experiments on FAIR and GSI. A. Kantsyrev 1, D. Varentsov 2, A. Hug 2, S. Udrea 2, L. Shestov 1, V. Turtikov.
REMOTE TROUBLE SCHOOTING WITH GANMVL Petra Schütt GSI WAO 2007, Trieste September 24, 2007.
UNILAC SIS 18 SIS 100/300 HESR Super FRS NESR CR RESR Sergey Kozub Institute for High Energy Physics Protvino, Russia SIS300 meeting 19 March, 2009 Sergey.
Data Acquisition System for 2D X-Ray Detector Beijing Synchrotron Radiation Facility (BSRF) located at Institute of High Energy Physics is the first synchrotron.
February 17-18, 2010 R&D ERL James Jamilkowski R&D ERL Controls Larry Hoff James Jamilkowski February 17-18, 2010 Controls.
Automation and Drives Vision Sensor SIMATIC VS 110 Image processing without the need for specialist knowledge.
LKr readout: present and future R. Fantechi 30/8/2012.
Data acquisition system for experiments at GSI HHT experimental area. A. Kantsyrev 1, D. Varentsov 2, A. Hug 2, S. Udrea 2, L. Shestov 1, V. Turtikov 1.
AIDA FEE64 production report June 2011 LYCCA tests and MBS Production of FEE64 Preparation for October test. 13th June
Workshop “Vacuum systems of Synchrotron Light Sources“ organized by MAX-LAB & ALBA Barcelona, th September 2005 Instrumentation and Vacuum Control.
Berliner Elektronenspeicherringgesellschaft für Synchrotronstrahlung mbH (BESSY) Accelerator and Experiment Control and Monitor Systems Ralph Lange BESSY,
1 Development of models of intrabeam scattering for charged beams in storage rings E. Mikhaylova Joint Institute for Nuclear Research Dubna, Russia The.
ETRAX CRIS architecture and Xilinx FPGA Peter Zumbruch Experiment control systems group GSI (KS/EE)
E v3 aLIGO SEI Testing and Commissioning Overall Plan
ATF Control System and Interface to sub-systems Nobuhiro Terunuma, KEK 21/Nov/2007.
Ulrich RaichAnnual Report Preparation Meeting GSI January 2006 Progress report for Task SIS100_5 Digital Signal-Analysis Electronics for Beam Position.
Presentation: Phidgets for Rapid Pervasive Prototyping Applied Pervasive Computing.
LHC Collimation Project Integration into the control system Michel Jonker External Review of the LHC Collimation Project 1 July 2004.
Status of RICH mechanical design at PNPI E.Vznuzdaev for PNPI group: V.Dobyrn, A.Khanzadeev, E.Kormin, V.Lebedev, N.Miftakhov, V.Polyakov, V.Samsonov,
Milestone 1 Pablo Canseco Domenick Albanese Ronald­-Dean Allado Command and Control Subsystem for Regolith Mining Robot.
World Leaders in Combustion Management Solutions New Product Developments Autoflame Sales Meeting 2011 New Product Developments.
1 SVT Status Update Yuri Gotra CLAS12 Silicon Vertex Tracker TCB Meeting March 13, 2015.
Programme for “Target 3” – test of alternative bearing materials (from Jason Tarrant) –Drawing updates by 11 th November –Bearings: Material approval –
11 th February 2008Brian Martlew EPICS for MICE Status of the MICE slow control system Brian Martlew STFC, Daresbury Laboratory.
H. Weick, 8 th MAC meeting, GSI, Super-FRS Status Target Area H. Weick / M. Winkler 8th FAIR - Machine Advisory Committee Meeting
PANDA Collaboration Meeting, GSI November 2010 H.O. Cluster-Jet works at GSI Herbert Orth, GSI Darmstadt, Germany Title.
Cluster-Jet Target Target TDR Alfons Khoukaz Institut für Kernphysik, WWU Münster, Germany PANDA Collaboration Meeting December 8-12, 2008.
Systematic studies on pellet beam production M.Büscher, A.Gerasimov, V.Chernetsky, P.Fedorets, A.Dolgolenko,V.Balanutsa, A.Boukharov, L.Gusev, S. Mineev,
Mitglied der Helmholtz-Gemeinschaft Status of day-one experiment commissioning at COSY Huagen Xu Goa, Mar
PANDA Target Pipe Meeting Alfons Khoukaz Institut für Kernphysik, WWU Münster, Germany PANDA Target Pipe Meeting February 2013.
1PANDA, Target meeting, Juelich, 08/09/2009 Pavel Fedorets Progress on Moscow-Jülich Pellet Target A.Boukharov, M.Büscher, V.Chernetsky, P.Fedorets, A.Gerasimov,
Spanggaard BE-BI-EA(1)EA Lectures February, 2016 Introduction to Beam Instrumentation (in the Experimental Areas of the SPS, the PS and the AD)  EA -
Laser Control Status A. Masi, T. Feniet, K. Szczurek Awake Technical Board November 12 th 2015 Thanks for inputs from: M. Donze`, V. Fedosseev, C. Hessler.
Laser Line work package (WP6) AWAKE Technical Board meeting 19 May 2014.
PSL APA Update May 3, 2016 UW Physical Sciences Lab.
Mitglied der Helmholtz-Gemeinschaft STT News Peter Wintz (IKP, FZJ) PANDA Collaboration Meeting, Dec-2013, FAIR.
Combining safety and conventional interfaces for interlock PLCs
National Centre for Nuclear Research, Poland
P.Fedorets on behalf of the Pellet target group
Status of the pellet target at ITEP
Beam diagnostics from GSI
PANDA Muon Group Meeting, Protvino 7 June 2011 G
STT Detector risk’s assessment
Current Status of IPM-Linac Control System
Institute of Nuclear Physics Polish Academy of Sciences
Experience & Status of the LIGO Slow Controls System(s)
ATF/ATF2 Control System
Performance of an Automated Water Based Cooling System for CBM MuCh
Summary of activities of the pellet target development
Development of the pellet target in ITEP
Silicon Lab Bonn Physikalisches Institut Universität Bonn
Project Members: M.Premraj ( ) G.Rakesh ( ) J.Rameshwaran ( )
ProtoDUNE SP DAQ assumptions, interfaces & constraints
Hall A Compton Electron detector overview
Cryogenic C&C Scope of work
FutureJet Cryogenic Jets of Nano- to Micrometer-Sized Particles for Hadron Physics From HP2 to HP3 HadronPhysics2 Meeting GSI, 3rd-4th November 2011.
الدليل التدريبي للتقييم البيئي المتكامل للمنطقة العربية
Project planning and status (February 2018)
Effective luminosity simulation for PANDA experiment
Control System Summary of Changes Since PDR
Advanced Research Electron Accelerator Laboratory
Pellet target developments at ITEP
News from the Pellet target
Project planning and status (May 2018)
Pellet Target developments
Commissioning the European XFEL cryogenic system and best practice
Nov. 10th, Meeting INGRID T. Nakaya (Kyoto)
Determining the Risk Level Regarding to the Positioning of an Exam Machine Used in the Nuclear Environment, based of polynomial regression Mihai OPROESCU1,
Presentation transcript:

Pellet Target developments A.Gerasimov, V.Chernetsky, M.Büscher, P.Fedorets, A. Kantsyrev, E. Lushchevskaia, V. Panyushkin, A. Bogdanov, A.Dolgolenko, P.Balanutsa, E.Ladygina, L.Gusev, S.Mineev, I.Tarasenko, V. Demekhin, S.Makagonov, D.Bogachenko, N.Kristi, V.Karasev Institute for Theoretical and Experimental Physics named by A.I. Alikhanov of National Research Centre «Kurchatov Institute» Moscow, Russia PANDA Meeting, Darmstadt, Novemver 05-09, 2018

After transfer of the first prototype from FZJ to ITEP Transfer succeeded on the end of May. Activities: Papers for coming equipment Unpacking Assembling subsystems Testing subsystems

Subsystems for the second prototype hydrogen purifier system purifier Assembled Connected Tested for leakages pump

Subsystems for the second prototype beam dump system Assembled Tested for leakages dump chamber pump

Subsystems for the second prototype scattering chamber scattering chamber assembled with the diagnostic setup and the tube

Adjustment system elements System of linear actuator + stepper motor operated via L-CARD E14-140 controller 4 modules for four axes: 4 stepper motors - delivered 4 linear actuators - produced 4 mechanical support – produced software on Delphi prog. – done and tested Test with L-Card controller and Delphi prog. – done Installation on the Pellet target – in progress USB L-CARD - controller

New light modules for diagnostics New backlight elements based on the LED Cree XP-E 1 W, Red with operational control designed and produced test on the Pellet target in progress

Raspberry PI 3 Model B – as bridge to EPICS DAQ for pellet target – mix of present system with integration to EPICS of GSI/FAIR Data acquisition system Software will be modified for integration to EPICS system of GSI/FAIR. Use of Raspberry Pi controller as bridge for slow control system Present DAQ system – based on individual software-hardware modules (installed on PAC, PLC controllers and Windows PCs) united by TCP/IP Sockets protocole and using of MySQL database for data storing Data To pellet target Data From PANDA control system Ready for start Stop of pellets generation Pellet size and frequency Start of pellets generation Error in pellet target Set of luminosity mode (ten or more variations) Actual luminosity mode Raspberry PI 3 Model B – as bridge to EPICS Experimental Physics and Industrial Control System at GSI (already using in PANDA and CBM experiments)

Current activities and last achievements Transfer of the first prototype from FZJ to ITEP Commissioning of the subsystems from the first prototype. Development of the adjustment system Update of the diagnostics system Advanced data acquisition with PLC Continue R&D for TDR Preparation of the draft of the TDR