C=Council A = Assembly SR = Stakeholder Review

Slides:



Advertisements
Similar presentations
IHB Report on IRCC-2HSSC-2. IRCC-2 Establish, coordinate and enhance cooperation in hydrographic activities amongst States on a regional basis, and between.
Advertisements

Report to SNPWG. S-100 Still awaiting the portrayal component It is getting closer – model is complete Agreed to incorporate a product specification template.
Reference “IHO S The New Hydrographic Geospatial Standard for Marine Data and Information” R. Ward, L. Alexander, B. Greenslade
IHO Work Programme 2 – “Hydrographic Services and Standards”
7 th Meeting of the Inter Regional Coordination Committee IHB Report IRCC7-05B.
IHO INTER-REGIONAL COORDINATION COMMITTEE IRCC-6 Agenda item 10 Input from HSSC-5 IHB.
SPWG Final Report 8 th. Meeting at Pusan Korea From 2 to 4 May 2006 VII MACHC Meeting October 4 th Acapulco, Gro. México.
Member States Approve S-101 Update S-57 to S-101 Convertor Finalize S-101 User Review and Input OEMs Implement S-100 based ECDIS ECDIS On-Shore Trials.
Member States Approve S-101 Update S-57 to S-101 Convertor Finalize S-101 User Review and Input OEMs Implement S-100 based ECDIS ECDIS On-Shore Trials.
International Hydrographic Organization - ECDIS Stakeholders’ Forum - Captain Robert WARD Captain Robert WARD Director, IHB.
IHO INTER-REGIONAL COORDINATION COMMITTEE IRCC-8 Agenda item 8 Input from HSSC-7 IHB.
INToGIS PROJECT II KHOA / IHO Sec. Presented by KHOA (Yong BAEK)
1.5 Weighted Voting and Voting Power
NCWG Terms of Reference NCWG April 2016, IHB, Monaco
Hopes, Expectations for the IHO Council
IHO Council – October 2017 Review of IHO Strategic Plan
Hydrographic Services and Standards Committee
Report of the Data Quality Working Group
Report of the Nautical Cartography WG Mikko Hovi, Chair NCWG
S-121 Maritime Limits and Boundaries
WORLDWIDE ENC DATABASE WORKING GROUP (WENDWG)
S-121 Maritime Limits and Boundaries
Work Advancement Meeting WebEx Meeting’s Agenda
Agenda Item 5.1 – S-100 Interoperability Specification
Standards” and by the Council key Priorities
Future of the Paper Chart
S-121 Maritime Limits and Boundaries
IRCC work is guided by the IHO Work Programme 3
Hydrographic Services and Standards Committee Report of the ENCWG
Brief on Nautical Information Provision Working Group work
THE IHO INTER-REGIONAL COORDINATING COMMITTEE IHO-IRCC 10 Goa, India
Development and future provision of S-100 based Products
Meso-American - Caribbean Sea Hydrographic Commission (MACHC)
Provision of Data Beyond Charts
Report from the S-100WG to NCWG April 2016, IHB, Monaco
International Hydrographic Organization
Interrelation between IHO organs with special regard to the Council
Hydrographic Services and Standards Committee
Hydrographic Services and Standards Committee
8TH MEETING OF THE IHO INTER-REGIONAL COORDINATION COMMITTEE
ACTIONS AND DECISIONS..
Updates and Proposals from the HSSC
Proposed Review Cycle to
Report from the 7th Meeting of the IHO Hydrographic Services and Standards Committee (HSSC7) to NCWG April 2016, IHB, Monaco.
Hydrographic Services and Standards Committee
Report of the Nautical Cartography WG Mikko Hovi, Chair NCWG
Hydrographic Services and Standards Committee
Hydrographic Services and Standards Committee
HSSC11 – 5.1D S-100 Readiness Levels.
IHO Secretariat, Monaco, November
OGC Marine DWG Update for MSDIWG (Vancouver 2017)
IRCC-7 Agenda item 10 Input from HSSC-6 IHB
42nd Meeting of the US / Canada Hydrographic Commission (USCHC) Biloxi, Mississippi, USA, March 2019 IHO Secretariat Report Dr Mathias Jonas Secretary-General.
Hydrographic Services and Standards Committee
IHO NCWG2 IHB, Monaco April 2016
Report of the S-101 Project Team
Status Report on Inland ENC Development and Standardization
Hydrographic Services and Standards Committee Report of the ENCWG
Hydrographic Services and Standards Committee
CBSC15 Paramaribo, Suriname, 7-9 June 2017 IHO Secretariat Report
IEC Activities affecting HSSC Hannu Peiponen Chair IEC TC80
Hydrographic Services and Standards Committee
Hydrographic Services and Standards Committee
WENDWG – WENSWG Progress Report
IHO HYDROGRAPHIC SERVICES AND STANDARDS COMMITTEE
Region F ICCWG Report to MBSHC Montenegro – Wednesday 5 July 2017
Provision of Data Beyond Charts WEND’s S-100 Future Challenges
Dr. Mathias JONAS, Secretary-General (IHO Secretariat)
3rd Meeting of the IHO Council
Roadmap for the S-100 Implementation Decade
Presentation transcript:

2017 2018 2019 2020 C=Council A = Assembly SR = Stakeholder Review S-129 UKC Development and Testing SR HSSC Approval S-129 Edition 1.0.0 Released for System Implementation S-128 Catalog of Catalogs Development (TBD) S-127 Sea Traffic Management Development (TBD) S-124 Nav Warnings Development and Testing SR HSSC Approval S-124 Released for System Implementation S-123 Radio Services Development and Testing MS Vote S-123 Edition 1.0.0 Released for System Implementation C=Council A = Assembly SR = Stakeholder Review MS = IHO Member State S-122 MPAs Development and Testing MS Vote S-122 Edition 1.0.0 Released for System Implementation S-121 - MLB Development and Testing SR HSSC S-121 Edition 1.0.0 Released for System Implementation S-111 Surface Currents Development and Testing SR HSSC Approval S-111 Edition 1.0.0 Released for System Implementation S-104 Water Levels Development and Testing SR HSSC Approval S-104 Edition 1.0.0 Released for Implementation S-102 Bathy Development and Testing SR MS Vote S-102 Edition 2.0.0 Released S-101 ENC Development and Testing SR HSSC Approval S-101 Edition 1.0.0 Released for System Implementation 2017 2018 2019 2020 A2 C2 HSSC11 C3 C4 HSSC10 HSSC12 S-100 Edition 4.0.0