EUSERC DWG. 301 Project 14-05-05.

Slides:



Advertisements
Similar presentations
Trystar Generator Docking Stations & Portable Power Cable
Advertisements

Revenue Protection & Safety Field Safety. Safety First Section 1.5 Personal Protective Equipment.
FIRE PUMP ELECTRICAL CONFIGURATIONS UNDER 600 VOLTS.
Merging 3D layers in Photoshop. Photoshop document with one layer.
The Vanjen Group • Manufacture's Representative – Power Generation/Oil & Gas • Covering TX, OK, LA, AK, in some cases NM and MS • Extensive.
Warm Up #4 1. Evaluate –3x – 5y for x = –3 and y = 4. –11 ANSWER
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Ch POD 1. A = M = Equations with variables on both sides Solve: 6x + 3 = 8x - 21 First we want to get x on one side…. 6x.
Distribution Systems-General
SIZE - Top SERVER ROOM Designed by – openbox |
Lately I’ve been, I’ve been doing math Thinking about the different plots and graphs An outlier’s less or greater than the rest Said no more counting numbers,
Create a grid. Write one factor (in expanded notation) along the top. Multiply each expanded number in the top factor by each expanded number in the.
Circuit Breakers CBI and ETA product offerings. Breaker Technologies - Hydraulic-Magnetic Not effected by ambient temperatures Possible to obtain any.
1 EASTERN MUNICIPAL WATER DISTRICT Proposed Revisions to the Administrative Code Elizabeth Lovsted, PE Sr. Civil Engineer July 8, 2015.
Contact Us.
Smitty’s Two Minute Drill Grounding
Unit 7 - Exponents.
Smitty’s Two Minute Drill Grounding
Grounding the Electrical System
Training on Power Monitoring and Management Solution
Power Generation and Distribution
Fennville Public Schools
Times Tables and Top Tips! The 2 times table
Utilizing Your Business Facebook Page
Getting Started with the Grants Portal Non-Grants
Electrical Equipment CSP uses conventional electrical equipment in the majority of areas All installations follow the mandatory electrical codes The.
Grounding the Electrical System
Smitty’s Two Minute Drill Mixed Content -05
Examples of Multiplying Radicals
How To Add A Xerox Printer To Google Chrome
Frio River Cabins - Frio Vacation Homes - Frio Country Resort
Request Management System Update

Electrical Equipment CSP uses conventional electrical equipment in the majority of areas All installations follow the mandatory electrical codes The.
New Functionality in ARIN Online
Log in to BenefitBridge from internet
Solving 2-Step Variable Equations
Section 8.2 Problem Solving in Geometry With Proportions
2014 Changes Two Minute Drill
10:00.
Process for reviewing student ethics applications
Lab Notebook Name, Period, Class should be on outside front cover in pen Name Period Class.
Dividing Monomials.
Equations with Variables on Both Sides
EUSERC Training May 2017 Connecting Single phase 3 wire invertor to 3phase 4 wire utility service. Lessons learned - Customer Owned Interconnected Generation.
Let’s Graph Unit 1.
EET 323 – Electrical System Design Lecture 11: Panel-boards and Switch-boards Instructor: Radian Belu, PhD.
Safety Meeting Topics Standby Generator Safety

Smitty’s Two Minute Drill Grounding and Bonding
There are many things that you can do to improve your bone health.
Introduction to Ag. Mechanics
Earthing Arrangements
5-6 Inequalities in ONE Triangle
Solving 2-Step Variable Equations
Balancing Redox reactions in an acid or a base
SMART Program Specific Metering Wiring Diagrams May 2019
Electrical components and systems
Submission of Animal Use Protocols through
Firebase Vs. MongoDB: Choose the Best Database of 2019
Dominion Energy South Carolina: Solar Equipment Requirements
CHPATER 4 DESCRIPTIVE WRITING
Meet Us
Solving Equations with Variables on both sides
Contact Us
North Carolina Department of Insurance Office of State Fire Marshal
Presented by: HJ Arnett Industries, LLC
How to access the dashboard: visit
Accounts Payable Section 4 – Petty Cash, Expense Report,
Presentation transcript:

EUSERC DWG. 301 Project 14-05-05

EUSERC REQUEST

CURRENT EUSERC DWG. 301

EUSERC DWG. 301 1- NOTE 1 TO READ; “This equipment may be constructed as a combination panel allowing either OH or UG service supply applications.” 2- ADD CONDUIT ON TOP TO SIGNIFIFY BOTH FEED APPLICATIONS. 3- ADD WORDING IN NOTE 2 TO READ; “Lugs shall always be placed on UG side of the meter for safety purposes. Any variation should be approved by Utility.” 4-ADD WORDING IN NOTE 2 TO READ; In OH application, conductor shall be placed as to not contact bus bars or lugs. 5- POSSIBLY ADD A NOTE STATING; Conductors shall loop to the bottom of the panel before being placed on the landing lugs.”

Discussion, Suggestions?? LET’S VOTE YES NO