VSOP-2 project Update Hisashi Hirabayashi /JAXA VSOP-2 Project status

Slides:



Advertisements
Similar presentations
Environmental Application of Remote Sensing: CE 6900 Tennessee Technological University Department of Civil and Environmental Engineering Course Instructor:
Advertisements

LightSail.
GCOM/AMSR2 status Earth Observation Research Center and GCOM Project Team Japan Aerospace Exploration Agency AMSR-E Joint Science Team Meeting Huntsville,
Japanese VLBI programs, East Asian VLBI Network and Space VLBI;VSOP-2 H.Kobayashi(NAOJ) 2011, Jan., 27 Future of VLBA.
PLATO Phase A/B1 Status TOU Meeting Catania 28 Feb 2011 PLAnetary Transits and Oscillation of stars.
Questions from the European colleagues & Answers (only) from the Chinese engineers present for Y.-W. Zhang and S.-G. Yuan Chinese Academy of Space Technology.
Polar Highly Elliptical / Molniya Orbit Science (PHEMOS) Mission Phase 0/A Studies Mid-Term Review Meetings January 12-14th, 2011.
NEXT SPACE VLBI MISSION, ASTRO-G (VSOP-2) AND ITS SPECTRUM MANAGEMENT ASTRO-G Project (JAXA) Y. Murata ( JAXA)
Space radio astronomy observations Y.Hagiwara (NAOJ)
1 Virgo Commissioning progress and plans ILIAS, Jan 23 rd 2007 Matteo Barsuglia on behalf of the Commissioning Team.
Millimetron mision sensitivities and instrumentation concept
Very Long Baseline Interferometry (VLBI) – Techniques and Applications Steven Tingay ATNF Astronomical Synthesis Imaging Workshop Narrabri, 24 – 28 September,
TARANIS a CNES Scientific Mission – C. Bastien-Thiry Workshop on Coupling of Thunderstorms and Lightning Discharges to Near-Earth Space – Corte 2008 TARANIS.
VSOP-2 Ground Link Station - Tracking Station Requirements - National Astronomical Observatory of Japan Y. Kono.
VLBI in Africa Michael Bietenholz Hartebeesthoek Radio Observatory.
1 Project Name Solar Sail Project Proposal February 7, 2007 Megan Williams (Team Lead) Eric Blake Jon Braam Raymond Haremza Michael Hiti Kory Jenkins Daniel.
Next Space VLBI mission: VSOP-2
High Altitude Scientific Ballooning (Near Space Engineering)
ReVeal Passive Illumination by Radar (PAIR). Overview Payload / Mission Communication Launch Orbit Power Thermal Attitude Propulsion Finance.
Tielong Zhang On behalf of the CGS Team in the Institute of Geology and Geophysics, Chinese Academy of Science Spacecraft System and Payload China Geomagnetism.
DBBC Stutus Report November 2007 G. Tuccari, W. Alef, S. Buttaccio, G. Nicotra, M. Wunderlich.
Student Satellite Project Tracking, Telemetry & Command UASat Progress Review Tracking, Telemetry and Command (TTC) January 26, 1999 Dana Irvin, Team Leader.
FIRST/Planck 12 December 2000PT The FIRST Mission Implementation Status and Schedule T. Passvogel The Promise of FIRST.
Radio Astronomy Applications Group Kashima Space Research Center National Institute of Information and Communications Technology EGU2005 GI3-1TH5P-0057.
Spacecraft and Ground Segments Status March 21, 2014 Dan Ossing STEREO Mission Operations Manager (240)
PHASE REFERENCED MAPPING AND DIFFERENTIAL ASTROMETRY: APPLICATIONS JON MARCAIDE 26 Sept 2001 Castel San Pietro Terme.
Status and future of East Asia VLBI network H.Kobayashi(NAOJ) East Asia VLBI
ASTRO-G project VSOP-2 – VLBI Space Observatory Programme times higher sensitivity. 10 times higher frequency observation 10 times higher resolution.
- JAXA Agency Report - Osamu OCHIAI JAXA/EORC WGISS#18, SG#17 Sept. 6-10, 2004.
QZSS (quasi-zenith satellite system) is a Japanese satellite navigation program with a regional service coverage. The orbits for QZS are 24-hour elliptic.
上海天文台 Shanghai Astronomical Observatory 4th IVS General Meeting Spacecraft Tracking with Chinese VLBI Network Xiuzhong Zhang and Chinese VLBI Network Team.
GEO Visit to EUMETSAT, 2 July MONITORING WEATHER AND CLIMATE FROM SPACE Overview of Current Satellite Operations GEO Visit – 2 July 2015.
03/6/121 Using the VLBA for Spacecraft Navigation Jonathan Romney National Radio Astronomy Observatory VLBA 10 th Anniversary 2003 June 9 – 12.
Tracing the JWST Proposal from User Interface to Commanding of an Instrument Margaret Meixner & WIT Balzano, Robinson & CMD.
ASTRO-G Ground Tracking Station Plan Y.Murata (JAXA) Start from HALCA design Functions –Uplink reference signal –Data demodulation –Data recording –Telemetry.
Action Items 1 November Action Items - I Assess frequency coverage at 22 GHz vs. science goals, and decide whether lower frequency should be changed—Murata,
ISS Commercial Resupply Services Michael Suffredini ISS Program Manager June 17 th, 2009 Augustine Committee UPDATED: Corrected page 10 (replaced “first.
Next Generation Space VLBI Project: VSOP-2 Inoue, M. 1, Nagai, H. 1, Asada, K. 2, Saito, H. 2, Tsuboi, M. 2, and the Next Generation Space VLBI Working.
GCOM-W1 Status Keizo Nakagawa 1, Norimasa Ito 1, Marehito Kasahara 1, and Keiji Imaoka 2 1 GCOM Project Team 2 Earth Observation Research Center (EORC)
ACE Science Workshop March 10 th, 2009 Armin T. Ellis, Deborah Vane, Mark Rokey Jet Propulsion Laboratory.
Lunar CRater Observation and Sensing Satellite Project LCROSS Astronomer Workshop Feb. 29, 2008 NASA/ARC, Mountain View, California Mission Design & Observation.
Sketch for a telecoms system
Astro-G/VSOP-2 in Europe JIVE, Dwingeloo, The Netherlands
Status Following these success of VSOP, science targets of VSOP-2 approach the central region of AGN. studies of accretion disks and jets in AGN studies.
CINEMA System Engineering
Maxim Pathfinder Prework 16 August 1999
National Astronomical Observatory of Japan Yusuke Kono
VLBI in China and the Collaboration with NL
Ulysses Nutation anomaly in
Potential NASA Funding Sources
Veronika S. Kobets Institute of Solar-Terrestrial Physics
Architectural Design Space Exploration
NRAO-GB Support for VSOP-2
Astrometry Observation of Spacecraft with Phase delay
Rick Perley National Radio Astronomy Observatory
Portfolio Management Process & Customer Request Management
(National Astronomical Observatory of Japan)
Technician Licensing Class
Astro Space Center of Lebedev Physical Institute, Moscow
VLBA Correlator Interfaces for VSOP-2
Update on Status of LIGO
TGac Status and Timeline
M.Sekido, R.Ichikawa,H.Osaki, T.Kondo,Y.Koyama(CRL)
Shanghai VLBI Center Activities
EagleSat 2 – Mission and Development Overview
Action Items Following these success of VSOP, science targets of VSOP-2 approach the central region of AGN. studies of accretion disks and jets in AGN.
Second Independent Evaluation of UNAIDS
DBBC Stutus Report November 2007
Nataliya Zubko, Jyri Näränen, Markku Poutanen
Presentation transcript:

VSOP-2 project Update Hisashi Hirabayashi /JAXA VSOP-2 Project status Tracking Station mtg,, Feb. 19 & 20, 2006, OAM Madrid VSOP-2 project Update     Hisashi Hirabayashi /JAXA VSOP-2    Project status    Spacecraft and instruments Act 2

VSOP-2 Project Budget request was approved Dec. 2006 Internal Reviews; ISAS System Definition Review March 19, or 26. JAXA Project Review March, or April Project formal start April 1, 2007 (FY2007 start day) Project Manager Prof. Saito Project Scientist Prof. Tsuboi (transfer from Nobeyama R. O. Director after Hirax’s retirement ) Meetings; VSOP Lessons Learned mtg in Hakone April org.ed by YH/HH/LIG VSOP-2 symposium in Sagamihara Dec. 2007 Satellite ETS-VIII (now Kiku-VIII) launched and 2 LDRs were successfully deployed (Dec, 25-26, 2006). Launch in Jan.-Feb. 2012 is current plan, but ? Still Uncertainty in Launcher VLBI-Link 40GHz up and 37GHz down link, we propose.

30,000 km HALCA and VSOP (1997 - 2006) 1.6 GHz (18 cm) 5 GHz (6 cm) VLBI Space Observatory Programme HALCA and VSOP (1997 - 2006) Highly Advanced Laboratory for Communications and Astronomy 1.6 GHz (18 cm) 5 GHz (6 cm) Resolution of 360 μarcseconds   at λ= 6 cm 30,000 km Launch: ISAS M-V rocket Feb. 12, 1997 10 years anniversary, a week ago ! Time flies as rockets do.

HALCA/VSOP project started in April 1989 HALCA Launch in Feb. 1997 HALCA last command   November 30, 2006 (3213 days after launch) HALCA/VSOP was a 17 years project, and terminated in March 2006. Lessons Learned mtg in Hakone, April l6, 17, 2007

ISAS Astronomy satellites Series Astro-E launch failure 2002 ? Astro-E II = Suzaku X-ray 2005 Astro-F = Akari IR 2006 Solar-B = Hinode Sun 2007 last usage of M-V rocket here is a long gap. Astro-G = ??? Radio 2012 NeXT X-ray

VSOP-2 spacecraft In-Orbit Configuration 7 modules Feed/LNA Mass (wet) 910Kg Power 1,800 W In-Orbit Configuration 7 modules Sub-reflector with 3-dim adjust. Solar Paddle Solar Paddle Feed/LNA 9m offset Cassegrain Antenna with Modular Structure Link Antenna Launch Configuration in M-V rocket Main-Reflector with 2-dim adjust

Modular antenna structure for VSOP-2 deployment mechanism and back-structure same as ETS-VIII but with new antenna surface design (Study since 2000 with budgets) ETS-VIII(Kiku-VIII) was Launched in Dec. 2006, and was successfully Deployed as below. ½ scale 7 modules successful deployment test in 2006 Oct. by Ariane piggyback We use … NASDA HPでcheck!

VLBI Link system Proposed frequency Astro-G High Gain Antenna Diameter: 80cm Astro-G Proposed frequency VLBI Data Downlink Frequency 37-38 GHz Bit Rate 1 Gbps Modulation QPSK TX-Power 20 W Phase Transfer Uplink Frequency 40 GHz No Modulation TX-Power 10 W Ground Link Station Diameter >10m Data Storage Data Storage Capacity 4 TB / 8 hours H Maser Phase Comparison

Phase-referencing observation Study Rapid switching between target and phase reference sources Increase sensitivity Astrometric studies Requirements 3 degeree separation within 1 min cycle High torque actuator : CMG (Control Moment Gyro)   with 4 Reaction Wheels Orbit determination accuracy: < 5cm with GPS + SLR Problems; Expensive CMGs OD accuracy cannot be enough Consideration or Decision needed ?? For other option, we think the capability of phase referencing. Off course, observing two objects at same time is better. And frequency switching is also available for improvement of sensitivity. But rapid switching or tilting is the most realistic method, for the present. So the requirements for phase referencing are these. High torque actuator for rapid maneuver. Because the phase error is orbit error times separation angle, now we assume maximum separation 3 degree. Control Momentum Gyro(Honeywell)

Solar-B, Solar X-ray/Opt/UV Observatory, was renamed HINODE which means “sunrise”. It was launched near the sunrise into sun-synchronous orbit. HINODE launch by M-V-7 (the last M-V launch) September 23, 2006 US/European contribution to HINODE On-board Instruments (US,UK) Tracking support (ESA) Uncertainties for Astro-G launcher H-IIA other ? Orbit ? in case of shared launch

VSOP-2 Mission, Concluding Remarks Astro-G Tracking Meeting, Feb, 2007, OAM Madrid VSOP-2 Mission, Concluding Remarks 2nd Generation space-VLBI mission VSOP-2 is now funded for Astro-G satellite launch in Feb. 2012, And the project will formally start in April 2007. (Phase-A to Phase-B) Design study and mission planning are in progress, Group is being established in Japan. VSOP-2 Orbit

US/Japan meeting, Socorro, Feb. EVN Directors mtg, Firenze, May 2006 US/Japan meeting, Socorro, Feb. EVN Directors mtg, Firenze, May Europe/Japan mtg, JIVE, June  COSPAR GA, Beijin, July IAU GA, Prague, Aug.   EVN symp. Torun, Sept.  Tracking meeting, Pasadena, Oct. Nov. EVN Directors mtg,Bonn, Nov. 2007 Lessons Learned mtg, April 18, 19, Japan (?) Europe/US/Japan mtg, May, Bonn VSOP-2 symposium Dec. 3-6. ISAS VSOP-2 Selected Contractor Selection (Now) Budget Announciation (Dec. 2006) ISAS Mission Def. Review JAXA Review VSOP-2 Project start (April 2007)

5 Stations Tracking Network for HALCA VSOP-2 tracking station(s) in the European longitude Yebes South Africa ? 10m 64m 13m 40m 43 GHz Space- Ground baseline at Yebes HALCA-Usuda first fringes (via 10m) (64m) at 1.6 GHz This slide was shown to Dr. Southwood and ESA members more than once.

VLBI Two-Way Link Need to make basic design soon so that each partner can understand and explain to funding agencies. Need to establish an international Study team by interested (or approved) parties. VSOP had 5 stations network with 3 different design; Usuda (ISAS) 1 DSN (JPL) 3 GB(NRAO) 1 with compatibility test One group to design one scheme is important. OFDM (8CH, QPSK) 1CH、QPSK, 16QAM,… Analog

Common design and delivery (draft thought) Make common basic design Review at April mtg at Sagamihara Common frequencies with NTS engineers’ presence with RFI consideration with some more details RF part feed (antenna dependent) polarizer / diplexer IF and LO frequency chain and O/E, E/O (station dependent) Demodulator/ Modulator module exist ? (JPL?) Japanese FPGA-based design ? Doppler compensation (unified open loop !) Time/ phase correction measurement circuitry to be confirmed Control and Logging Computer and Software which cmputer ? language? later Station Prarticipation Who can work, or deliver in what part how many spare parts ?