API Subcommittee 13 on Drilling, Completion and Fracturing Fluids Upstream - Standards - Committee on Standardization of Oilfield Equipment and Materials (CSOEM)
Sheraton Denver Downtown 2018 Exploration and Production Standards Conference on Oilfield Equipment and Materials June 11 – 15, 2018 Sheraton Denver Downtown
Welcome Safety minute First time attendees Agenda SC 13 background API Subcommittee 13 on Drilling, Completion and Fracturing Fluids Welcome Safety minute First time attendees Agenda SC 13 background
Wi-Fi Connection Connect to: Sheraton Meeting Room Password: Api18
API App
API App
API Subcommittee 13 on Drilling, Completion and Fracturing Fluids Tuesday, January 23rd, 2018
API Subcommittee 13 on Drilling, Completion and Fracturing Fluids Wednesday, January 24th, 2018
API Subcommittee 13 on Drilling, Completion and Fracturing Fluids Wednesday June 13, 6:00 pm – 7:30 pm API Reception Note: Refreshments will be available from 10:00 am to 10:30 am and 2:00 pm to 2:30 pm both days
Charge Committee Scope API Subcommittee 13 on Drilling, Completion and Fracturing Fluids Charge Develop and Maintain Specifications and Recommended Practices for Drilling, Completion, Fracturing Fluids/Proppants, Fluids Processing Equipment and related subjects Committee Scope SC 13 develops and maintains 14 standards on: Drilling Fluids, Drilling Fluid Processing Systems, Testing of Heavy Brines, Completion and Fracturing Fluids and Proppants.
API Subcommittee 13 on Drilling, Completion and Fracturing Fluids API Website: Standards – Committee Info - CSOEM – SC13 Sign-in: Email address & 1st time Password: FirstnameLastname or “Forgot Password”
Chair: Saleh Al-Ammari Vice Chair: Brent Estes API Subcommittee 13 on Drilling, Completion and Fracturing Fluids Chair: Saleh Al-Ammari Vice Chair: Brent Estes Secretary : Carl Stouffer Members 36 Alternates 11 Mailing List and Website 107
SC13 Standers Associate John Buflod Jacqueline (Jacqi) Roueché
API Subcommittee 13 Task Groups Title Work Group Publication 2 Publications 1 3 OBM Procedures 4 WBM Procedures 5 Solids Control 6 Testing of Heavy Brines 12 7 Rheology & Hydraulics 8 Materials Specifications 9 Comp, Stim, Frac Fluids 10 Proppants Total 34 16
API Subcommittee 13 Work Groups TG Title Documents Work Group Status Chair 3 OBM Procedures RP 13B-2 1 OBM Chemical Analysis Hibernation Jose Perez 2 High Temperature Viscometer Hibernation PSD Test Method For OBMs/SBMs Active Scott Klasner 4 NAF Activity Modifiers Brent Estes WBM Procedures RP 13B-1 RP 13I Simulated Drill Solids for Fluid Testing Greg Perez PPT Procedure Revision Filter cake Compressibility PSD LCM Fred Growcock 5 Solids Control RP 13C SCE Determination George Fisher Screen Certification or Monogram Program Mike Morgenthaler Screen RP to Auditable Standard La Tosha Moore
API Subcommittee 13 Work Groups TG Title Documents Work Group Status Chair 6 Testing of Heavy Brines RP 13J 1 Revisions to Testing of Heavy Brines Hibernation Judy Guy Caffey 2 Brine Buffer Capacity 3 PCT Test Procedures 4 Corrosion Update 5 Future Projects Return Permeability 7 Displacements Active Ed Rapp 8 Hydrates 9 Scale 10 CRA Testing Program JIP Paul Agosta 11 Emulsion Technology Gianna Pietrangeli/Katrina Schultz 12 Brine viscosity
API Subcommittee 13 Work Groups TG Title Documents Work Group Status Chair 8 Materials Specifications Spec 13A RP 13K 1 WG Reference Materials Active David Bredeen 2 Xanthan, Starch & Guar Tests Hibernation 3 Barite 4.1 4 Update on Barite Chemical Analysis Vacant 5 Starch Specifications 6 Alternate Methods for Density Determination Mohad Abshar 9 Comp, Stim, Frac Fluids RP 13M-1 RP 13M-2 RP 13M-4 RP 13M-5 Measurement of Fluid Loss Under Dynamic Condition Mahmoud Asadi Regain Permeability Asadi & McElfresh Co Friction of non Newtonian fluids Shah/Reinaldo 10 Proppants RP 19 C RP 19 D Physical Properties Testing S. Schilling/J. Jackson Long-term Conductivity Testing D. Goloschchapova 15 34 18 16
Proposed as TR 13M-6 (ISO 13503-6) API Subcommittee 13 Publications No. Title Number Responsible TG 1 Drilling Fluid Materials Spec 13A TG08 2 Field Testing Water-based drilling fluids RP 13B-1 TG04 3 Field Testing Oil-based Drilling Fluids RP 13B-2 TG03 4 Drilling Fluid Processing Systems Evaluation RP 13C TG05 5 Rheology & Hydraulics of Oil-well Fluids RP13D TG07 6 Laboratory testing of drilling fluids RP 13I 7 Testing of Heavy Brines RP 13J TG06 8 Chemical analysis of barite RP 13K 9 Training & Qualification of Drilling Fluid Technologists RP 13L TG02 10 Measurement of Viscous Properties of Completion Fluids RP 13M-1 TG09 11 Testing the performance of friction reducers in straight, smooth conduits TR 13M-5 12 Measuring stimulation and gravel-pack fluid leakoff under static conditions RP 13M-4 13 Measurement of Properties of Proppants used in hydraulic fracturing and gravel-packing operations, RP 19C TG10 14 Measuring the long-term conductivity of proppants RP 19D 15 Stress Corrosion Cracking of Corrosion Resistant Alloys in Halide Brines Exposed to Acidic Production Gas 13 TR 1 TG6 16 ISO 13503-6:2014 – Completion fluids and materials – Part 6: Measuring leakoff completion fluids under dynamic conditions First edition 2014-03-15 Proposed as TR 13M-6 (ISO 13503-6) TG9
API SC13 TG & WG Agenda Checklist API Subcommittee 13 on Drilling, Completion and Fracturing Fluids API SC13 TG & WG Agenda Checklist I. Call the meeting to order and review agenda II. Read TG / WG Charge and designate someone to keep minutes III. Present / update membership, call roll and document attendance / quorum IV. Present previous meeting minutes, revise and approve V. Discuss progress on previous “action items” VI. Present new work & other major topics VII. Revise timeline / calendar for the work of this TG / WG VIII. Old Business IX. New Business X. Review current “action items” XI. Schedule next TG / WG meeting XII. Review / revise names for TG Chair succession XIII. Adjourn meeting