Andrew Christensen, SRWG Chair March 2017 Chair Report Andrew Christensen, SRWG Chair Western Electricity Coordinating Council
SRWG Leadership Transition Chair: Andrew Christensen alchristensen@bpa.gov Vice-Chair: Jonathan Young young@columbiagrid.org Compliance Subgroup Chair: Sirisha Tanneeru sirisha.tanneeru@xcelenergy.com Base Case Coordination Subgroup Chair: Erik Olson erik.olson@pse.com Thank you to our outgoing leaders: Eleanor Ewry and John Gross Western Electricity Coordinating Council
Model Implementation Schedule No new models to report Three phase overcurrent relay modeling should be finished as of 9/2016 Adding clarity for the MVWG Library Removal Date https://www.wecc.biz/Reliability/WECC-Approved-Dynamic-Model-Implementation-Schedule-v3.xlsx Western Electricity Coordinating Council
2017 Compilation Schedule change request WestConnect going before PCC on March 23rd 2028 WPR case that would represent high renewables and light load conditions WPR’s will provide case description May be able to provide a seed case https://www.wecc.biz/Administrative/Request%20from%20WC%20-%20Modification%20of%202017%20Case%20Schedule.pdf Western Electricity Coordinating Council
2017 Compilation Schedule change request Proposed to replace either: 2027-2028 HW1 – Planners needing a heavy winter case could update the 2026-2027HW1 case created in 2016, or modify the 2028HS1 case planned for 2017. 20XX TEPPC – Replace the TEPPC place-holder case with the 2028 Light Load case. Would reach out to TEPPC find out if this would be acceptable. 2021 LSP1-S – Replace this 5-year scenario case with the 10-year light load case. SRWG is checking with the requestor, to see if they might consider changing from a 5-year to a 10-year scenario. Talk to your PCC representative Western Electricity Coordinating Council
Western Electricity Coordinating Council RAS file submissions RAS submissions are due with the 2018HSP1-OP – TODAY Some RAS Models have been submitted in formats other than the WECC Common format GE is patching the long_ID naming issue next week Finalized 2018HSP1-OP will be finalized without RAS RAS will come later with a version 2 posting Western Electricity Coordinating Council
Annual SRWG Charter review https://www.wecc.biz/Corporate/SRWG%20Charter.pdf Western Electricity Coordinating Council