JS Pilot and TEG Meeting, Vienna, 12/02/2019

Slides:



Advertisements
Similar presentations
1TAP TSI Masterplan introduction TAP TSI Masterplanning Introduction to company implementation planning Preparation for Masterplanning Kick-off event on.
Advertisements

Ken Tanner DTM, PID Transitions Area and Division Governors D42 Executive - February 28, 2015.
Sprint 112 Review / Sprint 113 Planning July 29 th, 2013.
Stefan Jugelt (ERA) TAP TSI CCM – baseline version th RISC Committee – January 2014.
GEMINI Re-platforming Project September 2012 GRP External User Changes and Key Messages ahead of seeking approval.
1TAP Masterplanning kick-off25 September 2012 TAP TSI Masterplanning Overview of RU/IM obligations Masterplanning Kick-off Brussels, 25 September 2012.
The Intranet.
Operations Coordination Team Maria Girone, CERN IT-ES GDB, 11 July 2012.
Campus wide Ticketing Tool for UC Berkeley
IT solution for reporting MiFIR Transactions
The Intranet.
How to Access and Redeem Cisco Certification Exam Discount Vouchers Step-by-Step Guide August 2013.
"Step by Step" Guide to implement TAF TSI
Internet and Intranet.
Assess Survey Invitations
Author: NG ETR team Last Updated: 30-Oct-2014 (V0.2)
ČD Cargo TAF Implementation
COMPUTER NETWORKS CS610 Lecture-33 Hammad Khalid Khan.
For Using of TAF Test Manager (TTM)
PCS Statistics and main development’s history 2017
PCS Technical Board Vienna, 28th February 2017.
Texas Instruments Supplier Portal- Web Invoice Overview
TAF/TAP workshop Brussels, September 2017.
Internet and Intranet.
Choosing the Discovery Model Martin Forsberg
Customer Requirement Survey
CDISC SHARE API v1.0 CAC Update 22 February 2018
Non-RU Applicant (NRA), PCS UG
RFC Short Term Path Request Pilots
Current activities Vienna, 10th May 2017.
Redesign of the International Timetabling Process (TTR)
Removal of national particularities, PCS UG
PCS Technical Board 17th October 2017, Vienna.
Envelope Concept report, PCS UG
PCS Outlook PCS User Group 12th September 2018, Vienna.
PCS Minor Release th February 2018, PCS UG.
PCS CCB Group 22nd February, 2017.
TAF-TSI Train Object 25th June 2018, Prague.
Internet and Intranet.
Communication Plan PPT Template
EEC Core Team 6th February 2018, Vienna.
PCS IT Day Operation Points updates from SNCF-Réseau’s interface.
PCS Day Vienna, 23rd November 2016.
Removal of national particularities
PCS User Group 15th February, 2017.
PCS User Group Vienna, 13th September 2017.
PCS Developments – PCS CCB
PCS IT Day 23 November 2017, Vienna.
Retrospective report of the past year
PCS Groups and Boards PCS Day 2016
TTR IT Landscape PCS-TTR Day Vienna, 21 November 2018.
TAF-TSI Pilot PCS Day 2017.
TSI Compliant PCS Mandatory Interface
Overview of CRISP Connectivity Process
JS Handbook overview of changes
ÖBB-Infrastruktur AG Network Access – Customer Care Patrick Wögenstein
«Data exchange in bovine identification database BOVEX»
PR deadline experiences, PCS UG
Envelope concept changes
PCS Technical Board 27th February 2018, Vienna.
Annex A1.6.2b RU access to OBI RNE General Assembly 16 May 2018.
Internet and Intranet.
Status PCS projects March 2019 Gilles Vergote.
Connecting Europe, Railway Undertakings and ProRail
Trafikverket TSI Compliant PCS Mandatory interface
Developments Confirmation by the CCB that the TAF TSI components have been successfully implemented into PCS Confirmation by the CCB that PCS has been.
Envelope Concept report, PCS TB
Modelling of Train and Path in TAF/TAP TSIs
PCS Test Group 9 July 2019, Vienna.
"Step by Step" Guide to implement TAF TSI
Presentation transcript:

JS Pilot and TEG Meeting, Vienna, 12/02/2019 TAF/TAP Joint Sector Pilot for TAF/TAP TSI Short Term Path Request and Train ID Seid Maglajlic JS Pilot and TEG Meeting, Vienna, 12/02/2019

JS Pilot: Topics for today Current status of testing with partners Update of the program plan Impact assessment Technical pre-conditions for testing - revisited The inclusion of TIS in the pilot program. Introduction of the daily object in the pilot. JS Pilot Meeting, 12.12.2018

JS Pilot: Topics for today Status of testing with partners RCA/RCG – ÖBB: Discussion with ÖBB-Infra ongoing SBB Infra CI-CI communication established. System development was scheduled for Q1/Q2-2019 Trafikverket Problems with CI-CI heartbeat outage solved with the new version of CI RNE Test Environment upgraded to CI 2.0 JS Pilot Meeting, 12.12.2018

JS Pilot: Topics for today Status of testing with partners Prorail CI-CI communication established with problems. Firewall and proxy settings were an issue. Functional part is about to start Infrabel together with Prorail - currently in preparation SZDC system-to-system planned for 2019 Changes in RNE Test Environment will be done by end of February 2019 JS Pilot Meeting, 12.12.2018

JS Pilot: Topics for today JS Pilot plan update – short term Upgrade of RNE Test Environment CI 2.0 upgrade - done XSD 2.2.3 until end of February Messaging with PCS as a broker until end of February FTE test cases Inclusion of PathDetailsMessage exchange with TIS (Operations) JS Pilot Meeting, 12.12.2018

JS Pilot: Topics for today JS Pilot plan update – short term JS Pilot Meeting, 12.12.2018

JS Pilot: Topics for today Long term plan JS Pilot Meeting, 12.12.2018

JS Pilot: Topics for today Impact assessment survey External document – will be prepared as survey JS Pilot Meeting, 12.12.2018

JS Pilot: Topics for today Technical pre-conditions – revisited (1) CI-CI communication Your CI machine: Ensure that your team has an access Ensure you can “ping” and “traceroute” the RNE CI machine 195.110.209.104 (taftest1.railneteurope.info) All RNE CIs have a valid security certificate Ignore the certificate warning It comes due to the CA-authority RNE, which is not recognized by browsers. Don’t worry, the certificate is valid. JS Pilot Meeting, 12.12.2018

JS Pilot: Topics for today Technical pre-conditions – revisited (2) CI-CI communication Provide us with your IP address Of your CI machine OR – if you are using proxy, then incoming and outgoing proxy IP! We will report you the “traceroute” results Only when both “traceroutes” work, the CI-CI Heartbeat can be established Only when CI-CI Heartbeat is successfully tested, the messages can flow JS Pilot Meeting, 12.12.2018

JS Pilot: Topics for today Technical pre-conditions – revisited (3) System-CI-CI-PCS communication XSD Schema 2.1.7 currently CI routes (company codes): RU-IM / IM-RU To be 2.2.3 by end of February RU-PCS / PCS-RU IM-PCS / PCS-IM JS Pilot Meeting, 12.12.2018

JS Pilot: Topics for today Inclusion of TIS Path Details Message from PCS will feed TIS with timetable data (CTT) PCS TIL will produce Path Details Message for each day in calendar of the path Dossier must be in “active timetable” in PCS PCS TIL will send the Path Details Messages on behalf of IM It will be PCS-CI-CI-TIS connection JS Pilot Meeting, 10.10.2018