CMA on-site 2 Announcement

Slides:



Advertisements
Similar presentations
1 Update on progress in SOE-drafting group. 2 Water Directors Steering of implementation process Chair: Presidency, Co-chair: Commission Strategic Co-ordination.
Advertisements

Chemical Monitoring On Site (CM Onsite) organised by NORMAN Association and JRC in support of CIS WFD NORMAN Interlaboratory study (ILS) on passive sampling.
1 AMPS 5 Expert Group on Analysis and Monitoring of Priority Substances Georg Hanke, Jan Wollgast JRC IES IMW.
European Commission - DG Environment Unit D.2: Water & Marine 1 Pau-Plenary Session 14 may 2008 Pau-Plenary Session 14 may 2008 CMA developments and state.
CMA-3 Support to Standardisation 6 th CMA Plenary Meeting under the German Presidency Berlin, 02 nd May 07 (modified: 03 rd May 07) modified according.
AMPS 2 Analysis and Monitoring of Priority Substances and Chemical Pollutants Second Meeting Ispra Review of Actions.
CMA-3 Support to Standardisation 7 th CMA Plenary Meeting Palais Beaumont, Pau, France, 14 th May 08 Ulrich Borchers, Peter Lepom, Bernd Gawlik.
October 2008 CMA on-site 2 17./ Budapest, Hungary.
Water.europa.eu CMEP progress CMEP progress Mario Carere, Bernd Gawlik, Mario Carere, Bernd Gawlik, WG E
DIRECTIVE 2000/60/EC 2 nd MEETING CHEMICAL MONITORING ACTIVITY (CMA) BRUSSELS, 17 th NOVEMBER 2005 Chemical Monitoring Activity Draft Outline of a Guidance.
European Commission - DG Environment Unit D.2: Water & Marine 1 Need for continuous exchanges on chemical monitoring issues, in the light of the on-going.
1 AMPS 4 22/ Brussels Discussion Paper As of , Bullet 4 Analytical Methods for Operational and Surveillance Monitoring Of WFD PS.
Water.europa.eu Draft mandate WGE Chemical Status WG E Priority Substances 8-9 October 2009 Jorge Rodriguez Romero Madalina David DG Environment, European.
Intercalibration excersice progress report Presented by Palle Haastrup Joint Research Centre Institute for Environment and Sustainability Inland.
Draft examples of possible GES Decision criteria Descriptor 8
SW/MW guidance Milestones
D8 and D9 REVIEW PROCESS April-June 2014: February 2015:
Synthesis of the intercalibration process Working group 2.5.
Chemical Monitoring on-site 3
Working Group 2A ECOSTAT progress report Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability Inland.
Chemical Monitoring mandate
Berlin 2 May CMA 6° Plenary Meeting
Bruxelles 17 october-2007 WG E Meeting
Chemical Monitoring Activity (CMA)
Identification of standardisation needs in the light of the SW/MW Guidance development - 3rd CMA meeting - 23 March 2006, Brussels Ulrich Borchers,
Contribution from AQUILA to Air Policy Review
on Priority Substances Strategic Coordination Group
Chemical Monitoring on-site 3
Proposed EQS Directive
WFD Public Hearings The Water Management regulation : Work Program
Chemical Monitoring Activity 9° Plenary Meeting Ghent
Discussion agenda Summary & proposals (30 min)
Table of existing standard methods and proposed quality standards for priority substances in water AMPS (2) Jan Wollgast.
Philippe Quevauviller
Meeting of the WFD CIS Working Group on Ecological Status (ECOSTAT)
Chemical Monitoring Activity (CMA) ( )
CMA Plenary Meeting 21/10/2008 PARIS
Strategic Coordination Group 4-5 November 2009
Drafting group Mixing Zones
Chemical Monitoring Activity Draft Guidance Document on Chemical Monitoring of Surface Water (Version 3.0)
Agenda Item 10: Feedback on dangerous substances workshop and Implementation Guidance WG-E(1)-07/04/INERIS - Implementation guidance.
Meeting of Water Directors Future Work Programme of the CIS
Project 2.7 Guidance on Monitoring
Streamlining and coherence of reporting obligations
MIG-P orientation debate
COST EFFECTIVNESS ANALISYS Country report - HUNGARY
CMA Drafting group on sediment/biota monitoring
Water Framework Directive 2000/60/EC
The Chemical Monitoring Activity beyond 2009 (?)
Work Programme of the CIS
Plenary Session 21° October Paris
Working Group 2A ECOSTAT progress report Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
Workshop on metals bioavailability under the Water Framework Directive
Part I.
by B. M. Gawlik, L. Galbiati, J. Zaldivar, G. Bidoglio
PRIORITY (HAZARDOUS) SUBSTANCES
WG E on Priority Substances
Common Implementation Strategy for the Water Framework Directive
Brussels 7 November 2007 SCG Meeting
Streamlining of monitoring and reporting under WFD, Nitrates Directive and EEA's SoE –concept paper DG Environment.
WFD CIS 4th Intercalibration Workshop
Chemical Monitoring On-site 3
Short update on the Status of the execution of
Philippe QUEVAUVILLER
Reporting template for milestone reports
Chemical Monitoring Activity Final Draft Guidance Document on Chemical Monitoring of Surface Water Peter Lepom.
Chemical Monitoring on-site 3
EU Water Framework Directive
Strategic Coordination Group Brussels, 5-6 November 2008
CMA-1 activity Berlin – 2 May 2007
Presentation transcript:

CMA on-site 2 Announcement May 2008

Is it possible to measure WFD priority substances with currently applied methods at WFD relevant levels? Adressed to: Laboratories organising, commissioning and performing WFD compliance checking May 2008

Organised by JRC IES with support by ICPDR and the Slovak EI CMA on-site 2 17.+18.9.2008 Budapest Hungary Danube River Organised by JRC IES with support by ICPDR and the Slovak EI May 2008

Collaborative field study: Comparison of monitoring methods on-site River water samples (whole procedure including sampling) River water extract (measurement with real sample matrix) Standard solutions (instrumental measurement only) May 2008

Selected (challenging) organic WFD priority substances Target Compounds PBDE PAH OCP Polycyclic Aromatic Hydrocarbons Polybrominated Diphenylethers OCP (to be confirmed) Others? Sampling and analysis according to current WFD chemical guidance draft document and WFD EQS proposal May 2008

Flexible site selection Sampling in main stream Currently organising (to be confirmed) Ship-based sampling Flexible site selection Sampling in main stream Availability of laboratory space for sample preparation and packaging May 2008

ARGUS Serbian survey ship used during Joint Danube Surveys May 2008

Sending documentation and technical annex for final registration Next step: Sending documentation and technical annex for final registration 11 interested laboratories so far In case of interest please contact E-mail: georg.hanke@jrc.it May 2008