Project 2018 October 31, 2018.

Slides:



Advertisements
Similar presentations
BSA Health System, May 2009 Next Slide Previous Slide BSA HEALTH SYSTEM Infection Control during Construction, Renovation, Repairs, and Maintenance All.
Advertisements

Building for Learning Project Photo Progress Report October 2009 Project commencement 21 st September 2009.
Visalia WCP Trickling Filter Upgrade Project 1994/1995 Trickling Filters, Pump Station and Flow Control Box Modifications.
April 21, 2010 Barbara C. Jordan Elementary School Update Presented by.
DG Inyorkern Weekly Project Summary 1/17/14. DG Inyokern 1/17/14: Percentage Overview Demolition: Pad Prep: 100% Finished and ceriified Footing & Foundation:
October 2009 Construction Progress. University City School District Bond Wolfe Architects – architect McCarthy Construction – construction manager Barbara.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
RENOVATION & RESTORATION. New 3 rd Floor Prosecutors Office Existing Attic Space.
PKI-Anwendungen 6/2/ Base framework. PKI-Anwendungen 6/2/ Bottom frame.
Subtracting Rational Numbers
BUILDING TRADE SAFETY ELECTRICAL SAFETY.
Renovation 2014 Preserving the Past | Preparing for the Future The renovation we are planning seeks to preserve the past by maintaining the character and.
HVACR116 – Trade Skills Mechanical Drawings.
Building for Learning Project Photo Progress Report 3 October 2009 – November 2009 Project commencement 21 st September 2009.
Elevator Installation, Window Replacement, HVAC, Sprinklers, Block wall skimcoating (resident rooms & 1 st through 4 th floor resident corridors). New.
IPM in Multifamily Housing Training
Finishing the Building
Roof and Ceiling Framing
 5 + (-9) is read: positive 5, negative 9  5 – 9 is read: positive 5, negative 9  is read: negative 15, positive 8  -7 + (-10) is read: negative.
Welcome to the road safety quiz, click on the start button to begin.
DIL-009 Phasing Plan TASKS START END CONSTRUCTION (7 weeks) 02/07/11 04/01/11 PHASE 1: BACKROOM AND GROCERY (2 WKS) 2/7/11PM2/18/11AM.
Planometric Views (room corner). GC Credit Paper – 2002 – Question 3 An Elevation and Plan of a room layout are shown. Using the given sizes and start.
Chapter 38 Fireplace Construction and Layout. 2 Links for Chapter 38 Fireplace Terms Energy Efficiency Fireplace Section Related Web Sites Fireplace Elevations.
Tangible Property Regulations Presented by David W. Jennings, CPA.
Project Status The project is progressing well with both grading aspects and building components. The mason has erected many walls to “scaffold high”
Prof Ralph V. Locurcio, PE CON 2001 CVE Sequence Single Family House - 3,000 square feet Duration 1 General Conditions 21 2 Apply for Permits.
Absolute Value and turning mixed numbers to improper fractions.
` riddle design 25 January 2009 Emmanuel Episcopal Church Formation Addition and Renovations.
Elevating the Quality of Life in the District. Agenda  SITE VIEW  SECTIONS  CONSTRUCTION STRATEGY  TIMELINE – JUNE 2013 TO JULY 2015  TIMELINE –
F ACILITIES, P LANNING, AND C ONSTRUCTION December 14, 2015 – Monthly Construction Report.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
BLUEPRINT READING The ability to do basic drawing and read blueprints are valuable skills needed in all areas of construction. Students do a simple sketch.
Elevating the Quality of Life in the District. Agenda  SITE VIEW  SECTIONS  CONSTRUCTION STRATEGY  TIMELINE – JUNE 2013 TO JULY 2015  TIMELINE –
HEALTHCARE SYSTEM Infection Control during Construction, Renovation, Repairs, and Maintenance All workers engaged in the construction, renovation, repair,
Safe Facilities and Pest Management
Alpine County Government Center Board of Supervisors Presentation October 2, 2012.
by: Maryam Musab Amine We use bricks and tiles to build a house. We use bricks to build the walls. We use tiles to build the floors. The bricks and tiles.
When all the walls have been coated with Carlite finish and dried the plumbers can return to fit all the necessary pipe work and the radiators. Then a.
TRIGON, INC ARDMORE CITY SCHOOLS 2013 BOND ISSUE PROJECTS.
Session 1: Identifying Construction Drawings and Drawing Components.
Quick and Easy Model Building
Upon completion of this module, you will be able to:
Capital Projects Requests
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
PRR Activation Meeting
Assembly And Installation Of Ikea Kitchen Cabinets
Construction Documents
Heating, Ventilating, and Air Conditioning
Heating Ventilating and Air Conditioning
Renovation & Expansion
PERSPECTIVES & ELEVATIONS
FLOOR PLANS CHAPTER 7 – PART 1.
Total Fitness Gym By Student Architect Jhonatan Rubio
Home Remodeling House renovation is a fun, but expensive project. Contact a reliable plumbing contractor to have the best designs, the most cost-effective.
Heating, Ventilating, and Air-Conditioning
Mission Hall Updates Ask & Learn Christine Shaff UCSF Real Estate
RISER PROJECT L, m, l/m kitchen.
INTEGER RULES Positives & negatives.
Entering Escape of Water Information
2007 Bond Issue Capital Improvement Program
Lecture 4 Building Construction 2 Week 5
POW Examples Problem of the Week.
n/o back to back kitchens
INTEGER RULES Positives & negatives.
Recent Bond Accomplishments
Help Mark get to the correct floor
MEGA MATHS! Name:____________________ Date:______________ FAST FIVE!
Solving Equations Challenge Answers
EAST PENNSBORO AREA SCHOOL DISTRICT
BA6. BA6 Sprinkler Station Structure Sprinkler Station Structure The metal sheet has been added for being able to install the.
Presentation transcript:

Project 2018 October 31, 2018

HVAC work has continued inside the renovation HVAC work has continued inside the renovation. Ventilation ducts have been relocated. Return ducts added and new HP units installed.

The unseen task of plumbing all of the sinks, restrooms and sprinklers has occurred each evening between the 1st floor ceiling grid and second floor slab. Lots of work that is needed but never seen.

Picture taken at 16’ feet off of Westbound outside stripe Picture taken at 16’ feet off of Westbound outside stripe. At the elevation of 5’.

Sitework and signage is ongoing and should finish up in the coming week or two. Striping, directionals, stop bars, signs and lot marking completion really add to the increased safety and functionality we will have in the new lot.

Some challenges have arisen on steel placement and existing construction. These items have been corrected and answered. Work will resume as items in question are delivered. For the time being, ... moment connections have been made.

Positive directions have recently been made as well on some of the conditions internally that required extra attention. It is an absolute must to be patient and get things correct during this phase. As an example: The old junction box pictured, appears to have arced as wall coverings were added in the 90’s, before corrective action was taken to remove the power supply.