Construction Engineering Department Construction Project with Resources Constraints By. M. Chelaka, D. Greenwood & E. Johansen, 1999 4/9/2019.

Slides:



Advertisements
Similar presentations
MANAGING PROJECT RESOURCES. Resource Allocation Problem  A shortcoming of most scheduling procedures is that they do not address the issues of resource.
Advertisements

1 of 14 1 /23 Flexibility Driven Scheduling and Mapping for Distributed Real-Time Systems Paul Pop, Petru Eles, Zebo Peng Department of Computer and Information.
Resource Management Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall.
An Application of Approximation Algorithm for Project Scheduling Problem based on Semi Definite Optimization Authored by T.Bakshi, A.SinhaRay, B.Sarkar,
1 9. S EQUENCING C ONSTRUCTION T ASKS Objective: To understand the problem of sequencing tasks in a manufacturing system, and the methods of finding optimal.
CS3773 Software Engineering Lecture 8 Software Planning and Estimation.
9-1 Resource Allocation Some definitions Resource allocation, loading, leveling Expediting and crashing projects Goldratt’s “Critical Chain”
BSBPMG503A Manage Project Time 6.5 Develop Schedule The process of analysing activity sequences, durations, resource requirements and schedule constraints.
Chapter Nine Project Scheduling 9-3 Gantt Chart for Five Activities (Refer to Example 9.1) Fig. 9-1.
Project Management Aim To introduce best practice in the management of research projects outlining the need to plan, schedule and effectively control assignments.
Determination of Construction Contract Duration for Public Projects in Saudi Arabia By: Ahmed Saleh Al-Sultan, June 1989 Presented by Sameh Elish January.
Center for Computational Biology Department of Mathematical Sciences Montana State University Collaborators: Alexander Dimitrov John P. Miller Zane Aldworth.
Center for Embedded Computer Systems Dynamic Conditional Branch Balancing during the High-Level Synthesis of Control-Intensive.
Multicast Routing in ATM Networks with Multiple Classes of QoS Ren-Hung Hwang, Min-Xiou Chen, and Youn-Chen Sun Department of Computer Science & Information.
Constrained Pattern Assignment for Standard Cell Based Triple Patterning Lithography H. Tian, Y. Du, H. Zhang, Z. Xiao, M. D.F. Wong Department of ECE,
Instructor: Tasneem Darwish1 University of Palestine Faculty of Applied Engineering and Urban Planning Software Engineering Department Software Systems.
Capacity Constrained Routing Algorithms for Evacuation Planning: A Summary of Results Speaker: Chen-Nien Tsai.
Project Scheduling & Budgeting CEE 402 Engineers Without Frontiers Lecture 6 February 26, 2003.
Centro de Estudos e Sistemas Avançados do Recife PMBOK - Chapter 6 Project Time Management.
Prepared by: Michael Palazzo
CEM 514 Modeling of Construction Operations The LP/IP hybrid method for construction time-cost trade-off analysis By Samir Abdallah Sulaiman.
Resources Management Dr. Ahmed Elyamany.
Article Title: Optimization model for resource assignment problems of linear construction projects ShuShun Liu & ChangJung Wang, National Yunlin University.
Operations Management Contemporary Concepts and Cases Chapter Thirteen Scheduling Operations Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights.
A Budget Constrained Scheduling of Workflow Applications on Utility Grids using Genetic Algorithms Jia Yu and Rajkumar Buyya Grid Computing and Distributed.
Column Generation Approach for Operating Rooms Planning Mehdi LAMIRI, Xiaolan XIE and ZHANG Shuguang Industrial Engineering and Computer Sciences Division.
MANAGING PROJECT RESOURCES
10/14/20151 Optimally Scheduling Resource Constraint Project Using SAS/OR® Jeff Cai Amgen Inc.
Slide 1 Mixed Model Production lines  2000 C.S.Kanagaraj Mixed Model Production Lines C.S.Kanagaraj ( Kana + Garage ) IEM 5303.
RESOURCE ALLOCATION & LEVELLING
INVENTORY CONTROL AS IDENTIFICATION PROBLEM BASED ON FUZZY LOGIC ALEXANDER ROTSHTEIN Dept. of Industrial Engineering and Management, Jerusalem College.
Efficient Backbone Construction Methods in MANETs Using Directional Antennas 1 Shuhui Yang, 1 Jie Wu, 2 Fei Dai 1 Department of Computer Science and Engineering.
Scheduling Optimization in Wireless MESH Networks with Power Control and Rate Adaptation SECON 2006 Antonio Capone and Giuliana Carello Keon Jang 2007.
© 2014 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected by Copyright and written permission should be obtained.
Presented By Dr. Mohsen Alardhi College of Technological Studies, Kuwait April 19 th,2009.
11/24/2015Dr. SASTRY-PROJ SOFTWARE PROJECT MANAGEMENT By Dr. M V S PERI SASTRY. B.E,Ph.D.
An Optimized EV Charging Model Considering TOU price and SOC curve Authors: Y. Cao, S. Tang, C. Li, P. Zhang, Y. Tan, Z. Zhang and J. Li Presenter: Nan.
Project Scheduling Software
A local search algorithm with repair procedure for the Roadef 2010 challenge Lauri Ahlroth, André Schumacher, Henri Tokola
Demand Side Management in Smart Grid Using Heuristic Optimization (IEEE TRANSACTIONS ON SMART GRID, VOL. 3, NO. 3, SEPTEMBER 2012) Author : Thillainathan.
1 Planning Base Station and Relay Station Locations in IEEE j Multi-hop Relay Networks Yang Yu, Seán Murphy, Liam Murphy Department of Computer Science.
Planning in production systems Operation scheduling Slovak University of Technology Faculty of Material Science and Technology in Trnava.
Unit 2 Time Management Prepared by: Prof. Seemaah Keddar.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
6 Resource Utilization 4/28/2017 Teaching Strategies
Approximation Schemes for Constrained Scheduling Problems Author : Leslie A. HalP 0. R. Center, M.I.T. David B. Shmoyst Dept. of Mathematics, M.I.T. 報告者:童耀民.
CE 332 – Construction Engineering and Management
& Urban Planning Civil Engineering Department
Scheduling Resources and Costs
Simulation and Exploration of
Project Management Techniques
Classification Analytical methods classical methods
Basic Project Scheduling
Basic Project Scheduling
James D. Z. Ma Department of Electrical and Computer Engineering
Unit 4 Project Design, implementation and evaluation
PRODUCTION AND OPERATIONS MANAGEMENT
ENGINEERING MANAGEMENT (GE 404)
Affiliation of presenter
Resource management Chapter 12 Copyright ©2016 Pearson Education, Inc.
Project Management Operations -- Prof. Juran.
2016 International Conference on Grey Systems and Uncertainty Analysis
Chapter 9 Resource Allocation © 2012 John Wiley & Sons Inc.
Operations Research Lecture 2.
CEM 510 Construction Planning & Scheduling Dr Almohawis
Introduction to Scheduling Chapter 1
Automated Software Integration
King Fahad University of Petroleum and Minerals
Precedence tables and activity networks
King Fahad University of Petroleum and Minerals
Presentation transcript:

Construction Engineering Department Construction Project with Resources Constraints By. M. Chelaka, D. Greenwood & E. Johansen, 1999 4/9/2019

OUTLINE . INTRODUCTION . Schedules based on time-oriented networks . Resource Scheduling . Optimizing resource-constrained scheduling . Solutions based on mathematical optimization . Solutions based on Heuristics . Research objectives . Proposed new resources scheduling algorithm . Conclusion 4/9/2019

Different project’s problems. Projects duration VS project resources . Different project’s problems . Projects duration VS project resources. . Conflict with projects. . Resource constraints in projects. . Mathematical Techniques “LINRES” INTRODUCTION 4/9/2019

Schedules based on time-oriented networks CPM & PERT Assumes unlimited resources Activities Analysis based on Time Requirements Projects resources demands VS limited quantities 4/9/2019

Resource Scheduling Time- constrained scheduling Manipulating the activities time within their TF. Resource-constrained scheduling Resource-constrained priority is fixed resource availability. 4/9/2019

Optimizing resource-constrained scheduling Solutions based on mathematical optimization Short project duration & smoothest resource profile Solutions based on Heuristics Computer packages. 4/9/2019

Research Objectives To develop a new Heuristic, as close as CPM output Test the new Heuristic performance. 4/9/2019

Proposed new resources scheduling algorithm LINRES Developed using Precedence & Grantt chart Aim is optimized resource constraint & best (t) Example 4/9/2019

Conclusion Resource-constraints is persisting problem Software might speedup process of LINRES The LINRES algorithm is satisfactory Further investigation is needed 4/9/2019

Questions ? 4/9/2019

Thank you ! 4/9/2019

Back 4/9/2019

Resource availability Resource requirement Resource utilization Resource idle Project time Project time Project time Project time Back 4/9/2019