Interstate 35 Building Project Update

Slides:



Advertisements
Similar presentations
House of my dream….
Advertisements

Recent Bond Accomplishments. Bordeaux Elementary Remodel.
Current Project Update October 25th 2012 Good Evening!!!
Progress Report 12/13/11. Progress Schedule December 2011 Work Completed December: Installed Concrete topping on roof Rough In M&E East side screen wall.
September 21 Update. Future Main Entrance (looking south)
Up Small Window Bed Room 6 m 4 m 2 m 1 m 4 m Path Room Hallway 2.6m.
In 1852 Hiram Lewis built a log cabin school house where the firehouse stands today. It was similar to the one pictured below. The first teacher was.
Madison Elementary School District Bond Project Update August 2013.
Bar joist over kitchen and band room. Setting bar joist over kitchen and electrical/mechanical rooms.
MAIN ENTRANCE SOUTH EAST VIEW NORTH EAST VIEW.
ALMA PIERCE ELEMENTARY SCHOOL Presented by: Frank Architects Inc. JUNE 26, 2002 DESIGN DEVELOPMENT PHASE.
Building for Learning Project Photo Progress Report 3 October 2009 – November 2009 Project commencement 21 st September 2009.
MARIAN BROTHERS- YUMBE(UGANDA) Construction of toilets, kitchen and renovation of library for Immaculate Heart Secondary School Yumbe- Uganda.
UC Santa Cruz Engineering Building 2 69,000 ASF ~$47M.
ADDITION & REMODEL Eugene Field Elementary School.
Trinity Lutheran Church Major Maintenance Tuesday, February 17, 2015.
ENERGY EFFICIENT HOUSE DESIGN UDC, Van Ness Campus Student Architects: Sarah Alexander and Roberto Martin.
1 SCS Building Committee. 2 The SCS Building Committee Members: Guy Blelloch Randy Bryant Sharon Burks Peter Lee Jim Skees Manuela Veloso.
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. November 5, 2007 Prepared.
Seating Room for lighting, recording etc. Area behind Stage Wings Stairs Orchestra Pit Wall for Backdrops.
BUILDING UPDATE AUGUST 23,2014. BUILDING “A” NORTHEAST VIEW.
Pasco County Schools – October 1, 2014
WEEK 1 You have 10 seconds to name…
THE FINANCIALS The loan for TPF campus. Update THE FINANCIALS For the building project.
Greater Mt. Zion Baptist Church 26 January 2014 Jackson Galloway Associates, PLLC.
` riddle design 25 January 2009 Emmanuel Episcopal Church Formation Addition and Renovations.
Floor Plan Sketch on 17” x 22” Graph Paper  Rough Scale Drawing  Room dimensions  Room Names  Basic House Characteristics AutoCAD floor plan including:
Weekly Schedule of Events January 3-9, Sunday, January 3, 2016 Fellowship, 9:15 am Sunday School for all ages, 9:30 Morning Worship Service, 10:45.
Dream House Bradyn Lange. Outside View The outside of my house is all gold, driveway is made up of brick, and same with the walkways. This is only showing.
NEW MEDICAL FACILITY BUILDING By: Vincent Cannatella and Shelbi Remy Advisor: Edward Rode Instructor: Cris Koutsougeras ET Senior Design 1.
Entrance/Exit onto West Grand Avenue 1 st Church of the Nazarene is the completed building at the top of the picture.
Teacher: Ms. Carolina. August What happened on a day like this? Early in the morning of August 13, 1961, the East German government closed.
Chicago Public Library Board of Directors Meeting January 13, 2015 Projects in Planning Schedule/Activity Phase 1 – Under construction. Refer to YOUmedia.
Turner Sims - stage layout WITHOUT ORGAN
Lounge Closely Seated Permitted Persons 80
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Allen Bond Proposal Components and Descriptions September 12, 2017
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
International Scholars’ Travel Workshop
Good Morning Today is __________.
Good Morning  Place your bags under the dry erase board at the front left side of the room and be seated. Turn around and face the back ready for announcements.
Graduation Project 2 Redesigning a Villa
The UK Tier 1 Entrepreneur Visa and the UK Representative of Overseas Business Visa - SmartMove2UK
This Is London.
Are you a ‘Rusty Mentor’ ?
Performance Based Design of a Steel Frame Hotel
Special Valuation The Masonic Temple 1110 West Riverside Avenue
a week-by-week Bible study for 2017 week 5: Romans 1:18-32
Рiglet has a small house. He has a hall, a kitchen and a room
istockphoto
a week-by-week Bible study for 2017 week 11: Romans 3:21-31
a week-by-week Bible study for 2017 week 9: Romans 3:1-8
G kitchen What makes you special!
Ашық сабақ 7 сынып Файлдар мен қапшықтар Сабақтың тақырыбы:
Windows басқару элементтері
What is a Passive Solar House?
Minuteman Vocational Technical Regional High School Progress
Computer Technology Mr. Talley 45 Minutes
Around the room Orders of operations.
Recent Bond Accomplishments
Сабақ тақырыбы: Теңдеу.
RPC Renovation and Addition
WES Renovation Update Photo Gallery
Презентация құру тәсілдері
Қош келдіңіздер!.
The following model requirements are based on a basic slab door finish kitchen similar to the one shown in the image.
The clown is here By lee smith.
Информатика пән мұғалімі : Аитова Карима.
Sue Morris Complex FIELD 4 (dirt) FIELD 2 turf Concession Stand
SOMERSET ACADEMY CENTRAL MIRAMAR
Presentation transcript:

Interstate 35 Building Project Update January 30, 2019

High School Commons Area

Concession stand corner- 1 week later Concession stand corner- today

Nurse’s Office (facing west) Secondary Conference Room (facing west)

High School offices

Elementary Kitchen--dishwashing window (today)

Elementary Kitchen (this morning) Elementary Kitchen (2 weeks ago)

Elementary Kitchen—serving line

Catwalk in auditorium

West wall of the auditorium with concrete slabs for seating Southwest wall of the auditorium West wall of the auditorium with concrete slabs for seating