DisCo Performance- An Annual Comparison

Slides:



Advertisements
Similar presentations
Cost Ranges for the Development and Operation of a Day One Regional Transmission Organization PL
Advertisements

CPCS Transcom Limited Solutions for growing economies Industry and Transaction Review Conference The Reductions in Aggregate Technical and Non- Technical.
STATE : KARNATAKA BESCOMMESCOMHESCOMGESCOM BENCHMARK PARAMETERS BESCOM CESCO GESCOM MESCOM HESCOM.
JLBC Government Finance Officers Association of Arizona October 26, 2007.
KERALA STATE BENCHMARK PARAMETERS BENCHMARK PARAMETERSOF.
Production and Cost CHAPTER 12. The average total cost curve for transactions with a human teller is ATC T. The ATM and the Cost of Getting Cash The average.
Federal Reserve Bank of New York Recommendation on the FFR November 2006.
Welcome and Introductions CoServ Presentation & Member Input.
Refuse Analysis th & 6 th study the refuse bills & present their findings.
Cochise College Center for Economic Research Economic Review & Outlook Bisbee, Arizona.
September 18, 2013 Presentation to Regulatory Flexibility Committee RESIDENTIAL & LOW-INCOME CONSUMERS & CUSTOMER CHOICE.
FIBI FIRST INTERNATIONAL BANK OF ISRAEL O verview
Funding Proposal Carolinas District Kiwanis International Bev Martin, Governor May 18, 2005.
4 th FTS – CEER bilateral meeting Sergey G. Novikov Head of the FTS of Russia Florence February,
COCHISE COLLEGE Center for Economic Research Economic Review & Outlook Douglas, AZ.
Unbilled Revenue Presented by Mindy Willis Orlando Utilities Commission.
Reducing waste through a better grocery shopping experience Recipes > Featured Items > Grocery List >
The Great Recession vs. The Great Depression Dr. Norman Cloutier, Director UW-Parkside Center for Economic Education Wisconsin Council for the Social Studies.
FPL Energy Wind Index May FPL Energy Wind Index Rolling 15 months, current portfolio 1 1 Average wind speed for the period from those reference.
Investor Relations BANCO DO BRASIL 3Q05 Results.
CONFERENCE CALL THIRD QUARTER OF 2000 CONFERENCE CALL THIRD QUARTER OF 2000 October 25, :00 a.m.
Example of Revenue Decoupling Utah Committee of Consumer Services Witness: David Dismukes Docket No T01 Exhibit CCS-2.1 Allowed Revenue per Customer.
Fair Go Rates System Dr Ron Ben-David Chairperson MAV Rate Capping Forum 26 November 2015.
01/17/ CP Discussion October 16,2002 Retail Market Subcommittee Austin, Texas.
Find the amount after 7 years if $100 is invested at an interest rate of 13% per year if it is a. compounded annually b. compounded quarterly.
Indiana 2005: Utility Billing and Collection Reporting Prepared By: Roger Colton Fisher, Sheehan & Colton Belmont, MA Coalition to Keep Indiana Warm.
Comparing and Ordering & Equivalent Fractions Third Quarter.
1 Market Operations Presentation Board of Director’s Meeting December 13, 2005.
Monetary Policy Update 2008:1 23 April Repo rate held unchanged at 4.25 per cent. The repo rate is expected to remain unchanged during the remainder.
Christopher M. Quinn, MACC, CPA, CFE, CGFO, CGMA Finance Director Tuesday, May 3 rd, 2016.
City of Palo Alto Utility Rate Changes FY 2013 Facility Managers’ Meeting August 16, 2012 Ipek Connolly, Senior Resource Planner.
Goal Review In October, we outlined the following goals for our contract: PPC o Grow revenue by an average of 4% on a monthly basis o Achieve average.
Minimum Disconnection Amount Deanna Foong Consumer Utilities Advocacy Centre.
ATC&C “ATC&C Loss The Aggregate Technical, Commercial, and Collections Loss. This loss is the difference between the amount of electricity received by.
Current Water Rates $26.66 per month readiness to serve fee (billed on a quarterly basis at $80.00) 5.14 per 1,000 gallons of water used The City of Flushing.
Compliance Report to ERCOT BOD December 2006
Director, Transmission Services
Fair Go Rates System Dr Ron Ben-David Chairperson
Year 10 Compound Interest
Latest developments in Estonia
Q2. Why is npower reducing prices. A2
THE ECONOMY. THE ECONOMY PAYROLL JOBS (THOUSANDS) PAYROLL JOB GROWTH Selected Large Metro Areas | 12 Months Ending August 2017 PAYROLL JOBS (THOUSANDS)
Ten Charts on Business Economics
IMPEL SA Management’s Presentation
Lesson 6: Part II Property Tax Adjustment
Economic & Revenue Outlook
Finance & Investment Committee FY2017/2018 1st Quarter Results
Organisational Performance Report
May 2018 Proposed Electric Rate Increase - First Public Hearing
Timelines and Penalties for Supplemental Reporting
Spiritual Leadership Development
VOCA Reporting Requirements for Texas CASA Programs September 21, 2016
A Historical Record of Charts from the Quarterly Press Releases of the Leading Indicator of Remodeling Activity 2007 to Present.
10 Charts on BUSINESS ECONOMICS.
Definition Return on Capital Employed (ROCE)
Fair Go Rates System Dr Ron Ben-David Chairperson
Timelines and Penalties for Supplemental Reporting
Third Quarter, FY 2017 Financial Reports
Bronx Community College
Business Revenue Prediction
How to be an Informed Board
How Power Reaches Households
MVECA October 19, 2017 Board meeting.
A Historical Record of Charts from the Quarterly Press Releases of the Leading Indicator of Remodeling Activity 2007 to Present.
February 2007 Note: Source:.
Canada’s Tax System.
Town of Wrentham DPW Water Department
DisCos Performance Reporting
DisCos Performance Reporting
Presentation transcript:

DisCo Performance- An Annual Comparison The DisCos in general, have capitalized the additional energy received from TCN, improving their performance 60 % Collection Efficiency October 2016 – September 2017 Energy billed 18,552 GWh Equivalent to NGN 579.0 billion Collection NGN 344.7 billion Energy received 24,217 GWh 24 % ATC losses 54 % ATC&C losses 9 % 11 % 23 % 65 % Collection Efficiency October 2017 – September 2018 Energy billed 20,600 GWh Equivalent to NGN 650.1 billion Collection NGN 422.5 billion 22 % ATC losses Energy received 26,368 GWh 49 % ATC&C losses Source: DISCOs KPI Report to NERC

DisCo Performance- A Quarterly Comparison Improved performance continued for the 3rd Quarter of 2018, although the energy received has not increased as much as projected. 60 % Collection Efficiency Energy billed 4,620 GWh Equivalent to NGN 147 billion Collection NGN 88.4 billion Third Quarter 2017 Energy received 5,988 GWh 23 % ATC losses 53.6 % ATC&C losses 5 % 9 % 19 % 66 % Collection Efficiency Energy billed 5,015 GWh Equivalent to NGN 158.2 billion Collection NGN 105.1 billion Third Quarter 2018 20 % ATC losses Energy received 6,283 GWh 47 % ATC&C losses Source: DISCOs KPI Report to NERC

Energy Received, Energy Billed and ATC losses (Moving Average) Since July 2016, there has been a gradual rise in both energy received by DisCos and consequently on the energy billed. 2,274 2018S1 2,054 2016S1 2,073 2017S2 2,029 2017S1 1,826 2016S2

Revenue Collection and collection efficiency analysis Although that the retail tariff has not been changed since Feb 2016, the revenue collection has been increased continuously up to N36 billion per month as the average of year 2018. 24 25 29 31 36 56% 58%