GLAST Large Area Telescope: Gamma-ray Large Area Space Telescope GLAST Large Area Telescope: Subsystem Name Subsystem manager name Institution Position email address Phone number ~ 20-25 minutes overall.
Outline Overview Schedule Roadmap to Manufacturing Top Issues and Risks
Overview (one slide) --- Use one or two graphical slides from your Delta Review, for example: Tracker – slides 3 and 4 Calorimeter – slides 3 and 4 ACD – slide 3 Electronics – slides 3, 4, 5 Mech/Thermal – 2.1-2, 3.1-3 ~ 1 minute
~ 5 minutes: set the context for the next set of slides. Schedule Status Summary Schedule for next 12 months Key milestones Critical Path Deliveries to/from other Subsystems (if relevant) ~ 5 minutes: set the context for the next set of slides.
Roadmap to Manufacturing Design Status E.g., progress since Delta Review, open trade studies EM Development and Test Plans Test matrix, EGSE, MGSE, software requirements Major procurements in upcoming 12 months Fabrication Plans for Flight Hardware ~ 5 minutes
Top Issues and Risks List of Top Three Likely Impact Mitigation plans Status ~ 10 minutes