DN OAD Processes: RG 0316 : Offtake Workstream

Slides:



Advertisements
Similar presentations
Exit Reform Review Transmission Workstream 07 January 2010.
Advertisements

UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
Capacity Release Processes and Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Mod 116B Steve Rose - on behalf of RWE Trading. 2 Background Mod 116 B was raised after discussion with a number of shippers about aspects Mod 116 which.
Review of Offtake Arrangements Document Section I - NTS Operational Flows 9 th July 2010 – Offtake Arrangements Workstream.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Flow Variations at Entry Transmission Workstream Martin Watson 1 st November 2007.
Flow Margin Assumptions for NTS Planning and Development Transmission Planning Code Workshop 3 5 th June 2008.
Offtake Arrangements Document – An Overview Paul Roberts 12 th May 2005.
OPNs & LDZ Demand Forecasts Chris Shanley & Nick Reeves.
LDZ System Charges – Structure Methodology 26 April 2010.
Review Group Modification Proposal Introduction of Enduring NTS Exit Capacity Arrangements.
Transmission Planning Code – Design Margin Update Transmission Workstream, 4 th February 2010.
1 Operating Margins – Request for Proposals Transmission Workstream 6 th April 2006 Dave Smith, National Grid NTS.
Flow Flexibility Capacity Joint Office 7 th December 2006.
DN Operation Iain Ward DNCC Manager. Responsibilities  Licence Holder  Obligation For 1 In 20 Capacity  DNCC Operates Networks Under Direction of The.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
A System Sensitivity Example Friday 19 Sept 2014 EE 401: Control Systems Analysis and Design Example #2:  Nominally, K = 5 and H =  Determine the.
Enduring Exit Regime & NTS Risk Management Processes Offtake Arrangement Workstream – OAD Section I Review Group 316.
Ofgem Information Request on availability of NTS Exit Flexibility Capacity Ritchard Hewitt Gas Code Development Manager National Grid Transmission 7 th.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Demand Side Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Review Group -140 Thoughts on additional information requirements.
Review of Offtake Arrangements Document Section I - NTS Operational Flows 10 th June 2010 – Offtake Arrangements Workstream.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Transitional Exit Capacity Proposals -Update Transmission Workstream, 1 Dec Nov 05.
Stuart Forrest, Network Planning Manager, Scotia Gas Networks 19 th October 2010 MOD Review of Industry Charging & Contractual Arrangements in Relation.
Aligning the Gas and Electric Markets: EDF Solutions
CE 3372 Water Systems design
Transitional offtake arrangements – Ofgem Initial Proposals on transitional incentives 6 October 2005.
DWG Meeting March 7, 2017 (Update to a Meeting held July 26, 2016)
Workgroup meeting October 2014
Transitional Exit Capacity Proposals -Update
SGN Modification Proposal Amendments to UNC TPD OCS Process Long Term Allocation of Capacity for the Transitional Period.
Exit Capacity Release Methodology Statement
Review of Demand Estimation Times for Modification Proposal 461
PLC = Peak Load Contribution (aka “ICAP”)
System information provision
Offtake Workstream : 8th September 2010
MIPI Energy – Daily Reports
Transmission Workstream 4th July 2007
Mod 0621 Amendments to Gas Transmission Charging Regime
Transmission Workstream, 6 August
Internal/External Sales Rate Development Level II
Resource Adequacy Demand Forecast Coincidence Adjustments
LDZ System Charges – Structure Methodology 26 July 2010
Mod 0621 Amendments to Gas Transmission Charging Regime
Capacity Methodology Statements
Danishtah Parker 0621 Workgroup 26 April 2018
2 hour / 5% Rule Bethan Winter.
Avoided Cost and E3 Calculator Update Workshop
Publication of Zonal Flex Data
Review of Physical Regime Times for Modification Proposal 461
MOD National Grid NTS Initiated Flow Swaps
Modification Proposal 0101 – “Amendment to demand forecasting timings in relation to the Gas Balancing Alert”
Flow Swaps at NTS / LDZ offtakes
Flow Swap Scenarios – Agreed Logic
Review Group /09/2007.
Richard Fairholme E.ON UK
UNC Transmission Workstream 15th June 2005
Flat, flex, assured pressures Network Development Statement
Overview of RbD Risk Modelling 31 March 2008
Workgroup meeting October 2014
Stefan Leedham Transmission Workstream 2nd November 2006
Offtake Workstream : 19 March 2012
195AV “Future work” – system flexibility
Proposed Changes to UNC Section Q Emergencies - Mod 035
Exit Constraint 23rd January 2013.
Transmission Workstream, 1 Mar 07
Presentation transcript:

DN OAD Processes: RG 0316 : Offtake Workstream 8th October 2010

Introduction Overview of DN Flat and Flex capacity requirements Overview of D and D-1 Processes

Overview of DN Flat and Flex capacity requirements

DN Flat and Flex Capacity Requirements Sufficient flat and flex capacity booked to meet 1:20 peak day licence conditions DNs use consistent modelling processes to determine requirements Flat usage generally behaves as modelled Flex usage shows more variation in practice particularly at volumetrically controlled offtakes

Determining LDZ Storage Requirements Empty LDZ storage and possible use of NTS flex Fill LDZ storage and possible use of NTS flex

Factors taken into account to determine requirements Previous demand profiles Latest demand forecasts

Output This is then used to determine flex requirements at individual offtakes

Performance

Key reasons for Flex breaches Demand tracking Reconfiguration of the network Faults Maintenance Flow swaps (Other than in the case of demand tracking, a breach of flex at one offtake is likely to be offset by a reduction in flex usage at another)

Overview of D and D-1 Processes

Definitions: LDZ Demand: LDZ Intake: NTS Intake: Sum of Net Temperature and non-temperature sensitive load including vldmcs etc LDZ Intake: Gas being brought into the LDZ to meet LDZ’s own requirements (demand + stock change), which may be sourced from NTS or NON- NTS offtakes and inter-LDZ transfers (in) NTS Intake: Gas being brought into the LDZ from NTS offtakes only which may be used to satisfy the LDZ’s own requirements and also requirements for other LDZ via inter-LDZ transfers (out)

Information provision at 13:00 D-1 and all other round-up times Forecast LDZ Demand 20 Stock Change 2 LDZ Transfers (in) 0.5 LDZ Transfers (out) 0.1 LDZ Intake 22 NTS Intake* 21.6 Required Flex* 1

Additional information provision at 18:00 D-1 and where changes are required Offtake Profile Nominations 1 value per hour and per offtake

Production of OPNs OPN processes may vary by DN and by LDZ High level process will be similar: Determine NTS Intake Allocate NTS Intake to NTS Offtakes Pressure controlled offtakes are allocated first Volumetrically controlled offtakes are allocated next These slides cover generic core system only

Determine NTS Intake Inputs: NTS Intake* 21.6 Required Flex* 1 Hours when flex is taken, paid back 2 hour / 5% rule (not as defined in OAD)

Allocate NTS Intake to Pressure Controlled Offtakes Inputs: LDZ Demand profile - (total 20) Latest hourly volumes for each pressure controlled offtake Pressure controlled offtakes will be assumed to follow the same profile as LDZ Demand based on the ratios of their most recent actual

Allocate NTS Intake to Volumetrically Controlled Offtakes Inputs: NTS Intake profile - (total 21.6) Sum of Pressure controlled projections (from last slide) Latest hourly volumes for each volumetric offtake

Determine total volumetric intake ie Shortfall (NTS Intake – Pressure controlled projections)