Direct Hits on Titanium Alloy Spoilers

Slides:



Advertisements
Similar presentations
Collimation in the ILC BDS Carl Beard ASTeC Daresbury Laboratory People Requirement Recent Successes Future Aims.
Advertisements

Background studies Takashi Maruyama SLAC GDE Baseline Assessment Workshop SLAC, January 18-21, 2011.
Wire scanners MDW chicane energy collimator 3 MPS collimators in this region end of linac Damage Simulation in MPS Collimators L. Keller Apr. 9, 2006.
Question from the GDE : Could local “doughnut” type muon spoilers like those in SLC be substituted for the 5 meter magnetized wall? 5m magnetized wall.
(ATLAS) Higgs Prospects at HL-LHC. ATLAS CMS ALICE LHCb Center-of-Mass Energy ( ) 7 TeV Center-of-Mass Energy (Nominal) 14 TeV ? Center-of-Mass.
Collimator Damage Adriana Bungau The University of Manchester Cockcroft Institute “All Hands Meeting”, January 2006.
CLIC collimator survival IWLC 2010 J.L. Fernández-Hernando – ASTeC/Cockcroft Institute (Daresbury Lab.) 21/10/2010 J.L. Fernández-HernandoASTeC/CI21/10/2010.
Zero Degree Extraction using an Electrostatic Separator Take another look at using an electrostatic separator and a weak dipole to allow a zero degree.
Collimation MDs LHC Study Working Group Daniel Wollmann for the Collimation-Team, BLM-Team, Impedance-Team, … LHC Study Working Group,
NLC - The Next Linear Collider Project NLC IR Layout and Background Estimates Jeff Gronberg/LLNL For the Beam Delivery Group LCWS - October 25, 2000.
PROBLEM: Radiation Dose Rate in IR2 When IR1 is Operating (and Vice Versa) Muon Dose Rate > 1 mRem/hr for 0.1% Collimated Halo.
NLC - The Next Linear Collider Project Backgrounds Update Tom Markiewicz SLAC LCWS Cornell 15 July 2003.
BLM thresholds for MQW magnets V. Raginel, B. Auchmann, D. Wollmann BLM Threshold Working Group meeting, 24/02/2015.
A.Seryi, Nov 22, 2005, slide 1 Evaluation of Aug9 2mrad Use 2mrad extraction, version Aug 9, Use high.
ILC RTML Lattice Design A.Vivoli, N. Solyak, V. Kapin Fermilab.
Design of the Photon Collimators for the ILC Positron Helical Undulator Adriana Bungau The University of Manchester Positron Source Meeting, July 2008.
Backgrounds in the NLC BDS ISG9 December 10 – Takashi Maruyama SLAC.
Plans for collimator survival and SLAC tests J. L. Fernandez-Hernando STFC/ASTeC Daresbury Lab.
1 Collimator Design Adriana Bungau The University of Manchester, UK Annual EuroTev meeting - Frascati, Italy, January 2008.
1 Collimator Design Adriana Bungau The University of Manchester, UK Annual EuroTev meeting - Frascati, Italy, January 2008.
17 th November, 2008 LCWS08/ILC08 1 BDS optics and minimal machine study Deepa Angal-Kalinin ASTeC & The Cockcroft Institute Daresbury Laboratory.
P. 1Mario Deile – Meeting on Experiment Protection from Beam Failures Protecting TOTEM Mario Deile PH-TOT
Collimator design and short range wakefields Adriana Bungau University of Manchester CERN, Dec 2006.
10 mm depth 16 mm depth BEFORE AFTER. TiTi alloyDiff. % 2 mm10 mm16 mm2 mm10 mm16 mm Adriana GEANT ~7% Luis FLUKA ~10.
L. Keller 3/18/02 Beam-Gas-Bremsstrahlung and Coulomb Scattering in the NLC Beam Delivery System Conditions for Calculation: 1. Program is DECAY TURTLE.
G.Kurevlev - Daresbury meeting Collimators Material Damage Study Previous results In our group - Adriana Bungau’s thesis - heat deposition on.
Russian Research Center” Kurchatov Institute” Shock wave propagation near 450 GeV and 7 TeV proton beams in LHC collimator materials Alexander Ryazanov.
LHC Injectors Upgrade Project 1/12/2010 R. Garoby.
Frank Zimmermann, material for LTC coherent tune shift due to collimator impedance - its dependence on gap size, bunch length, chromaticity, beta function,
F.Staufenbiel / EuCARD 2 / Heat load and stress studies of the ILC collimator G. Moortgat-Pick 1;2 S. Riemann 2, F. Staufenbiel 2, A. Ushakov.
Performance Study of Pair-monitor 2009/06/30 Yutaro Sato Tohoku Univ.
DRAFT Simulation of Errant Beams in the BDS How many bunches will damage beamline components or quench SC coils? Analysis Steps 1.Use TRANSPORT with BDS.
Energy deposition as function of intensity and emittance  The damage potential of a beam does not only depend on the total intensity Energy deposition.
Recent Energy Deposition Simulations TCSM-A6L7 L. Keller LARP Video Mtg. 02 Oct
G. Penn SLAC 25 September 2013 Comments on LCLS-IISC Design.
Optics for x-ing IR Andrei Seryi November 5, 2004.
Baseline BDS Design Updates Glen White, SLAC Sept. 4, 2014 Ichinoseki, MDI/CFS Meeting.
LHC Injectors Upgrade Project 11/11/2010 R. Garoby.
Fluka Simulations: Electron spectrometer window for AWAKE Jose A. Briz and V. Vlachoudis.
Status of Collimator Damage Studies
Experimental tests of wakefields and material damage for ILC spoilers
Radiation damage simulations for CLIC and ILC spoilers and ATF tests
Melting Temperatures, ᵒF
Design and testing of the Beam Delivery System collimators for the International Linear Collider J. L. Fernandez-Hernando STFC/ASTeC Daresbury Lab.
Setup beam intensities for FCC-hh
Collimator design and short range wakefields
Problem: A kicker failure can deposit 9 x 1011 protons on any metallic
Final Cooling For a High-Luminosity High-Energy Lepton Collider
PLACET collimator studies
Septum protection challenges by LIU beams in the SPS
The Post-linac Collimation System of CLIC: Machine Protection Aspects
SuperB General Meeting June , Perugia (Italy)
Site: Roma Tor Vergata Campus
,. . ' ;; '.. I I tI I t : /..: /.. ' : ····t I 'h I.;.; '..'.. I ' :".:".
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
US LHC Accelerator Research Program
NLC 2001 Beam Delivery Layout
RC1 Prototype Conceptual Design Review 15 December, 2005
Simulation of the FCC-ee lattice with quadrupole and sextupole misalignments Sergey Sinyatkin.
Collective effects in the SPS and LHC (longitudinal plane)
US LHC Accelerator Research Program
Wednesday h10: Programmed dump. 07h54: Injection. 200b.
Low Energy Electron-Ion Collision
Saturday 12 March Morning: problem on RSD1.A12B2 – flow rate problem on the cooling water for the converter. 14:00: Loss map -500 Hz (positive energy offset)
Saturday 1st October 03:05 UPS trip at point 5: 07:00 Visit Access
CEPC SRF Parameters (100 km Main Ring)
Proposal for quadrupole families
Saturday 15th May One bunch 1 e11 per beam 09:57: start ramp
Feasibility of Recuperation of Magnets in Decommissioned Storage Rings
Deuteron and Small Aperture
Presentation transcript:

Direct Hits on Titanium Alloy Spoilers Maximum ΔT/ 2x1010 bunch at the Hit Location, ºC/bunch L. Keller Nov. 2, 2005 Steering Condition 250 GeV Beam Size (µ) σx σy Max. Temperature (ºC/b) Comments 500 GeV CM 1 TeV Hit consumable 0.6 rl Ti Betatron spoiler (SP2,4) 28 6 1380 2770 1st bunch fractures or melts Ti alloy Hit survivable 0.6 rl Ti 111 9 290 560 Survive two bunches at 500 GeV, one bunch at 1 TeV CM Hit survivable 1.0 rl Ti Energy spoiler (SPE) ∆E/E = 0.06/0.03 % 15 (58 11) at 500 GeV 260 720 Big increase in temperature from 500 Gev to 1 TeV CM because of smaller ∆E/E Hit AB3 (30 cm copper) 20 1.4 25,000 ~60,000 Hopefully very rare occurrence Notes: Ti–6Al–4V alloy – fracture 770 ºC, melt 1800 ºC Copper – melt 1080 ºC Nominal emittances, εx / εy = 10 / 0.04 x 10-6 See talk at Daresbury Collimation Meeting, Nov. 2-3, 2005 for details