Way of working with ICS HWI Hardware and Integration

Slides:



Advertisements
Similar presentations
Internet Information Services 7.0 and Internet Information Services 7.5 Infrastructure Planning and Design Published: June 2008 Updated: November 2011.
Advertisements

Copyright Hub Software Engineering Ltd 2010All rights reserved Hub Document Exchange Product Overview Secure Transmission for Transaction-based Documents.
ESS Timing System Plans and Requirements Timo Korhonen Chief Engineer, Integrated Control System Division May 19, 2014.
Quality is about testing early and testing often Joe Apuzzo, Ngozi Nwana, Sweety Varghese Student/Faculty Research Day CSIS Pace University May 6th, 2005.
The ESS vacuum team has overall responsibility for all technical vacuum systems used on the: Accelerator, Target and Neutron Scattering Instruments and.
© The McGraw-Hill Companies, An Introduction Chapter 1 Software Project Management 4 th Edition Robert Hughes and Mike Cotterell.
Improvements to Service Provisioning Platform Deployment Process Master’s Thesis – Matti Jylhä Supervisor: Professor Jorma Jormakka.
Requirements Engineering for the Accelerator Eugene Tanke Systems Engineer Workshop on Requirements Conformance for SRF.
Autodesk Inventor ® Professional Design, Validate and Document the Complete Machine Autodesk Inventor ® Professional Introduction.
Creator: ACSession No: 16 Slide No: 1Reviewer: SS CSE300Advanced Software EngineeringFebruary 2006 (Software Quality) Configuration Management CSE300 Advanced.
1 Activities covered by project management Feasibility study Is project technically feasible and worthwhile from a business point of view? Planning Only.
New coding arrangements for Healthcare Science December 3 rd Presented by Nick Armitage, Health and Social Care Information Centre.
Introduction to ITIL and ITIS. CONFIDENTIAL Agenda ITIL Introduction  What is ITIL?  ITIL History  ITIL Phases  ITIL Certification Introduction to.
Electrical Engineering for NSS - Status and Planning- Thomas Gahl Electrical Engineering Group Leader February 26, 2014.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
In-Kind Strategy Integrated Control Systems Garry Trahern Head of ICS Division TAC 9, 3 rd April, 2014, ESS, Lund.
M. Munoz April 2, 2014 Beam Commissioning at ESS.
ICS interfaces Timo Korhonen ICS Apr 22, 2015.
Communication WG Summary Purpose To achieve Increased collaboration and cooperation between AD Groups/WPs/IK partners A common understanding and commitment.
ESS Timing System Plans Timo Korhonen Chief Engineer, Integrated Control System Division Nov.27, 2014.
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
Campus wide Ticketing Tool for UC Berkeley
Software Reviews Ashima Wadhwa.
Michael J. Novak ASQ Section 0511 Meeting, February 8, 2017
Onboarding Learning Objectives Checklist
PBIS in Secondary Classrooms March 29, 2017
Software Project Configuration Management
Road Manager Module National Heavy Vehicle Regulator
Issues regarding effective use of ICT resources
THE OSI MODEL By: Omari Dasent.
Software Configuration Management
Coordinator Orientation for PBIS at the Universal Level
Presented by Munezero Immaculee Joselyne PhD in Software Engineering
Chapter 1 The Systems Development Environment
Software Configuration Management
Test stand preparation and EMR "live" data summaries
Tom Shea Front End Meeting Catania
Roberta Roth, Alan Dennis, and Barbara Haley Wixom
Automated Test Execution & Reporting (TER) Plugin using JIRA
Engineering Processes
Terminology and Concepts
Lockheed Martin Canada’s SMB Mentoring Program
Leading teams in ServiceNow
Survey Results Overview
CHIPS for schools NSW Education Complaint Handling Improvement Program
POP: Building Automation Around Secure Server Deployment
Total Rewards Cost Project Update Presentation to C&B Managers
Decisions and Recommendations for the
Road Manager Module National Heavy Vehicle Regulator
Performance Management Training
Some Practical Considerations for Systems Engineers in a Lean-Agile Airborne Weapons System Program June 12, 2018 Ken Garlington.
Mirjam van Daalen, (Stephan Egli, Derek Feichtinger) :: Paul Scherrer Institut Status Report PSI PaNDaaS2 meeting Grenoble 12 – 13 December 2016.
Plan for controls with the digital platform
Status of Control Services ICS WP10 (accelerator integration work package) Tuesday 20th November
ICS update 7th Experiment Control Workshop
PLCs integration into the ICS
Beamline Controls Group (BCG)
Automation of Control System Configuration TAC 18
Testing Coordination at ESS
MPS commissioning at ESS
Configuration Management
Configuration Management
(Beam) Commissioning Plan
ePerformance: A Process Crosswalk May 2010
Machine Protection PLC Based System Verification and Validation Plan
Executive Project Kickoff
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
CE compliance -LLRF- Anders Svensson, ESS
ICG-WIGOS, eigth session, Jan 2019
Rebecca Nyman Service Designer Gordon Williamson Product Manager
Presentation transcript:

Way of working with ICS HWI Hardware and Integration www.europeanspallationsource.se 2018-11-19

Background My impression coming in in April 2018 Little interaction on developer level Communication characterized by coffee machine small talk Unclear priorities Unclear decisions Unclear responsibilities Meetings and discussions characterized by frustration on both sides Lack of trust What has happened A series of meetings on different levels to discuss way of working Introduction of dedicated work package manager for IFC platforms Addition of development resources from ICS (2 new developers and one returning from parental leave) Where we are today Much improved interactions on developer level Communication has moved from coffee machine to Jira We have a commonly established priority for the IFC platform We still have room for improvement regarding clarity of decision We still have room for improvement regarding clarity of responsibility At least we have a platform for starting to re-build mutual trust

Purpose The purpose of the talk is to: Give a systematic view of the different type of control system activities within ICS HWI Show the system engineering life cycles for the different types of activities Map these activities towards the concrete beam instrumentation systems Map these activities towards the ICS HWI work packages Give concrete instruction for how to make engineering work requests toward the different work packages in Jira

ICS Life cycles Control System of interest standard component or software generic control system technology ESS facility control system section 5. Standard control components and software drivers, PCB boards, hardware modules, APIs section 4. System life cycle for generic control systems and technology developments generic chopper control system generic cryomodule control system generic RF control system section 3. System life cycle for ESS facility control system ESS process control system ESS device integration system ESS standardised generic control systems ESS facility control systems ESS standardised control components used several times in

Generic control system life cycle Requirements Design Development Integration and Test SRR System Requirements Review CDR Critical Design Review SAR System Acceptance Review Use this for Standard MTCA crate configurations (e.g. generic BLM crate) Standard EPICS modules and environment Other reusable standard systems system life cycle phase system review

ESS facility control system life cycle Use this for Beam loss monitoring system Beam position monitoring system Other ESS wides systems built on the standard systems

Work packages and line management in ICS HWI Hardware and Integration Group Karl Vestin WP04: Hardware Core Simone Farina WP10: Accelerator integration Philippe Rabis WP11: Target integration WP11: Target integration WP11: Target integration

System ownership for beam instruments Proton Beam Instrumentation Systems ICS delivers integration to the facility control system (WP10) BCMs BLMs BPMs FCs <other local BI group/system> BI (possibly with ICS) support develops instrument application (WP10) ICS delivers standard generic control systems (WP04) BPM-01 BPM-... BPM-14 FBPM-01 ICS provides standard control system components (WP04) BPM-01 .B01 BPM-01 .B ... BPM-01 .B17 BPM-01 control system

Jira for team communication From the ICS HWI Jira User Manual (ESS-0289012): Stakeholder responsibility Create an issue of the type “Task” Provide accurate and complete specifications for the service requested. Assign the issue to responsible work package manager Respond accurately and in a timely fashion to requests for further information posted as comments in the Jira ticket ICS HWI responsibility Responsible work package manager to provide initial response within 3 working days Follow up and track request to completion Update the ticket accurately and in a timely fashion with each step of the process (e.g. update the ticket when goods are ordered, received etc).

Jira for team communication For requests concerning components or generic control systems (e.g. a IFC board or standard MTCA crate configuration): Raise a Jira ticket for WP04. For requests concerning ESS facility control systems (e.g. integration of a BLM): Raise a Jira ticket for WP10. A request is confirmed only after the responsible work package manager has acknowledged it in Jira. It is likely that there will be questions regarding requests. Once we have stabilized on a format we can promote this to a task template in Jira to ensure all relevant information is included and reduce the amount of questions that needs clarification.

Thank you for your attanetion Questions are welcome