News p10.15.03 has no fetchpkgs.sh and fetchprod.sh shell script in the .../D0reltools/ These are missing due to the switch over to the new distribution.

Slides:



Advertisements
Similar presentations
McFarm: first attempt to build a practical, large scale distributed HEP computing cluster using Globus technology Anand Balasubramanian Karthik Gopalratnam.
Advertisements

Open Source Software WampServer Presented By Mr. R.Aravindhan.
DTS Web Hosting, Rates And Services Web Hosting Internet Services Unit May 2006.
SCRAM Software Configuration, Release And Management Background SCRAM has been developed to enable large, geographically dispersed and autonomous groups.
DØ IB Meeting, Nov. 8, 2001 J. Yu, UTA, Remote Analysis Status Remote Analysis Coordination Computing hardware is rather inexpensive –CPU and storage media.
To Download It From The Web 1) Go to and click on the tab named Microsoft Office and click on the link to MEGAUPLOADwww.jonathan2.tk.
Avamar Technical Workshop
High Energy Physics At OSCER A User Perspective OU Supercomputing Symposium 2003 Joel Snow, Langston U.
Tech Vocabulary A Guide to Computer Terms and Acronyms.
SunSatFriThursWedTuesMon January One month per page.
DOSAR VO ACTION AGENDA ACTION ITEMS AND GOALS CARRIED FORWARD FROM THE DOSAR VI WORKSHOP AT OLE MISS APRIL 17-18, 2008.
DØ RAC Working Group Report Progress Definition of an RAC Services provided by an RAC Requirements of RAC Pilot RAC program Open Issues DØRACE Meeting.
DOSAR Workshop at Sao Paulo Dick Greenwood What’s Next for DOSAR? Dick Greenwood Louisiana Tech University 1 st DOSAR Workshop at the Sao Paulo, Brazil.
Status of UTA IAC + RAC Jae Yu 3 rd DØSAR Workshop Apr. 7 – 9, 2004 Louisiana Tech. University.
Status of Grid-enabled UTA McFarm software Tomasz Wlodek University of the Great State of TX At Arlington.
26SEP03 2 nd SAR Workshop Oklahoma University Dick Greenwood Louisiana Tech University LaTech IAC Site Report.
DØSAR a Regional Grid within DØ Jae Yu Univ. of Texas, Arlington THEGrid Workshop July 8 – 9, 2004 Univ. of Texas at Arlington.
1 Modeling the Shallow Water Equations with C and MPI LA-UR Approved for public release; distribution is unlimited Bob Robey.
From DØ To ATLAS Jae Yu ATLAS Grid Test-Bed Workshop Apr. 4-6, 2002, UTA Introduction DØ-Grid & DØRACE DØ Progress UTA DØGrid Activities Conclusions.
GridPP11 Liverpool Sept04 SAMGrid GridPP11 Liverpool Sept 2004 Gavin Davies Imperial College London.
LTU Site Report Dick Greenwood LTU Site Report Dick Greenwood Louisiana Tech University 1 st DOSAR Workshop at Sao Paulo September 16-17, 2005.
THEGrid Workshop Jae Yu THEGrid Workshop UTA, July 8 – 9, 2004 Introduction An Example of Existing Activities What do we want to accomplish at the workshop?
UTA Site Report DØrace Workshop February 11, 2002.
DØRACE Workshop Jae Yu Feb.11, 2002 Fermilab Introduction DØRACE Progress Workshop Goals Arrangements.
UTA MC Production Farm & Grid Computing Activities Jae Yu UT Arlington DØRACE Workshop Feb. 12, 2002 UTA DØMC Farm MCFARM Job control and packaging software.
DØRACE Workshop Agenda Feb. 11, 2002 (Morning – 1West) 8:30 Registration at High Rise next to 1 West Conference room 9:00 Welcome (John W.) - Session Chair:
DØRACE Workshop Agenda Feb. 11, 2002 (Morning – 1West) 8:30 Registration at High Rise next to 1 West Conference room 9:00 Welcome Womersley 9:10-9:30 DØRACE.
DOSAR Workshop III, OU P. Skubic DOSAR Workshop III Goals and Organization P. Skubic OU.
PROTO-GRID Status of Grid-enabled UTA McFarm software Tomasz Wlodek University of the Great State of Texas At Arlington.
Powered by: Jazz Presentation
2015 monthly calendar template
OUHEP STATUS Hardware OUHEP0, 2x Athlon 1GHz, 2 GB, 800GB RAID
Testing for patch certification
2016 monthly calendar template
TYPES OF SERVER. TYPES OF SERVER What is a server.
2018 monthly calendar template
Blank Food Diary template
Blank Fitness Diary template
2020 monthly calendar template
News & Action Items Automatic Release Ready notification system is in place and working (Thanks Alan!! ) Needs refinements!!! New Fermi RH CD-Rom released.
Powered by: Jazz Presentation
UM D0RACE STATION Status Report Chunhui Han June 20, 2002
2017 monthly calendar template
2019 monthly calendar template
Academic Calendar Click to add notes
2019 picture monthly calendar
2019 monthly calendar template
2016 monthly calendar template
2017 monthly calendar template
2014 monthly calendar template
2018 picture monthly calendar
2010 monthly calendar template
2010 monthly Academic calendar template
DØ MC and Data Processing on the Grid
2020 picture monthly calendar
2018 monthly calendar template
Academic Calendar Click to add notes
2020 monthly calendar template
2009 monthly calendar template
2016 monthly calendar template
DØRACE Workshop Summary
Remote Analysis Coordination
Remote SAM Initiative (RSI) – Proposed Work Plan
News Learned at the OU workshop that we need further split of releases
DØ RAC Working Group Report
2013 monthly calendar template
SAM Offsite Coordination
News New Updated DØRACE setup instruction to reflect the download split available on the web Three new sites are at various stages Princeton: Phase IV.
3 Week A: May 1 – 19 3 Week B: May 22 – June 9
HEP Data Grid for DØ and Its Regional Grid, DØ SAR
Presentation transcript:

News p10.15.03 has no fetchpkgs.sh and fetchprod.sh shell script in the .../D0reltools/ These are missing due to the switch over to the new distribution system  done automatically at the download Release status web page had a face-lift: http://www-d0.fnal.gov/computing/releases/status.html Linked from the DØRACE home page Sites: Oklahoma Univ.: SAM file transfer working LTU Working on getting SAM working Rice also making progress Two more VRVS Testing last week UM to UTA: Chunhui used Netmeeting as an H323 agent Sharon, Tom, etc tested and worked June-20-2002 DØRACE J. Yu, News

SAM initiative: UTA installed network testing beacon UTA’s McFarm control software has been released Instructions, scripts, and software tar-ball on the web http://www-hep.uta.edu/~d0race/McFarm/McFarm.html Three pilot sites with dedicated farms are setting up Tata institute Oklahoma Univ. Luisiana Tech. Univ. McFarm control software for PBS system in the works No meeting on July 4 Next meeting during the OU workshop: Wed., July 10 SAM/Grid meeting followed immediately by Remote analysis Sun virtual room reserved from 8:30am-12:30pm, July 10 June-20-2002 DØRACE J. Yu, News