Overview of Euro-Argo Preparatory Phase and status

Slides:



Advertisements
Similar presentations
29 November Research Infrastructures in FP7 Jean-Louis Picqué European Commission DG Research.
Advertisements

27 September, 2004 GEO Special Session on Governance Analysis of Comments on Governance of GEOSS International Cooperation Subgroup Co-Chairs Patricio.
November 2004 The Research Infrastructures in FP7 DG RTD – Directorate ‘Structuring ERA’
NMP-NCP meeting - Brussels, 27 Jan 2005 Towards FP 7: Preliminary principles and orientations… Nicholas Hartley European Commission DG Research DG Research.
A European Strategy for Marine and Maritime Research
CEN WS/BII2 1 Spreading interoperability in eProcurement processes across Europe Open Seminar Brussels December 6, 2012.
Potential role of WMO in Space Weather Jerome LAFEUILLE WMO Space Programme Office World Meteorological Organization Geneva.
CREST OMC Working Group Internationalisation of R&D Brussels, 3rd April nd Phase of the CREST OMC Working Group “Internationalisation of S&T“ Final.
Research and Innovation Research and Innovation Research and Innovation Research and Innovation Research Infrastructures and Horizon 2020 The EU Framework.
The Preparatory Phase Proposal a first draft to be discussed.
IGST – Exeter - 14 November 2005 Overview of MERSEA Mike Bell & Yves Desaubies  The fast-track marine service for GMES  The M ERSEA.
Research Infrastructures in FP7 On behalf of : Anna Maria Johansson, Hervé Péro European Commission, DG RTD/B3 MarineERA workshop Feb
Towards Sustainability Partnership for a European Centre for Ocean Monitoring and Forecasting (ECOMF) 16 April 2013, MyOcean Annual Review, Cork, Ireland.
EPOS Preparatory phase Torild van Eck (ORFEUS) Call INFRA Deadline: December 3, 2009 Funding: between 3 and 6 MEuro Duration: max 4 year.
Results of the HPC in Europe Taskforce (HET) e-IRG Workshop Kimmo Koski CSC – The Finnish IT Center for Science April 19 th, 2007.
Sophie Sergent Ifremer European Affairs Department / MariFish WP7 ERANET MariFish COORDINATION OF EUROPEAN MARINE FISHERIES RESEARCH Presentation of MariFish.
Notur: - Grant f.o.m is 16.5 Mkr (was 21.7 Mkr) - No guarantees that funding will increase in Same level of operations maintained.
1 Support for New Research Infrastructures in the EU 7 th Framework Programme for Research Elena Righi European Commission SKADS Workshop, Paris, 4 September.
1 RESEARCH INFRASTRUCTURES RESEARCH INFRASTRUCTURES in FP7 EUDET I3 Kickoff meeting, Desy, Hamburg 15-17/2/2006 Presentation by Stefano Fontana, DG Research.
ESTELA Summer Workshop, 26 June 2013 The EU-SOLARIS project.
Argo Status 3000 floats in November 2007 ! Commitments for 2008&2009 seem ok Global array issues QC and delayed mode processing Pressure errors New products.
24 marine institutes, universities, foundations and SMEs, + 1 associated partner - from 16 European countries - agree to propose together their research.
International Argo structure Argo TC M. Belbeoch Accra, Ghana.
IRCC 7, report from IHO European Union network WG Mexico, 1-3 June Report from the International Hydrographic Organisation - European Union Network.
EPOS - Rome meeting, September 1 EC + ESFRI Recommendations Elisabeth Kohler CNRS-INSU.
1 Joint Research Centre (JRC) Annual Meeting of the EGTC Platform The EGTC-ready to use - Beyond cohesion policy Ulla Engelmann Interinstitutional and.
ICOS status report, Oct The current Carboeurope atmospheric network Stars = vertical profiles Blue circles = continuous observatories Yellow diamonds.
European Energy Research Alliance Cork April 12 Henry Jeffrey Institute for Energy Systems EERA and EERA Ocean Energy.
European COstal-shelf sea Operational observing and Forecasting system ECOOP 1. Annual Meeting Athens February 2008 Erik Buch Coordinator.
EPOS where we are, where we go ! Massimo Cocco INGV Rome September EPOS Meeting.
GODAE IGST X Exeter, Nov Mercator Status 1. The system 2. Some users 3. The consortium 4. Mersea & plans
E u r o p e a n C o m m i s s i o nCommunity Research Global Change and Ecosystems Malta, 27 January 2004 Alan Edwards EUROPEAN COMMISSION GMES – Implications.
1 RESEARCH INFRASTRUCTURES RESEARCH INFRASTRUCTURES in FP7 CARE Collaboration Meeting CERN, Switzerland, November 2005 Presentation by Daniel Pasini,
Astroparticle Physics European Consortium What can large Astroparticle Physics projects like LAGUNA-LBNO expect from the new APPEC, the Astroparticle Physics.
H. PERO, E uropean Commission European policy developments and challenges in the field of Research Infrastructures.
European Commission, DG EAC – Unit B5 – Erik Hess 1 ∙ EQAVET 1st Annual Forum ∙ April 2010, Madrid ECVET State of play ∙ EQAVET 1st Annual Forum.
IGST 12 – August 2007 – St Johns EURO-ARGO A new European Infrastructure for Research.
Research & Innovation Preparatory Phase and Early Phase Support under the WP * of Horizon 2020 Harry Tuinder Research Infrastructure Unit DG Research,
Launch event ICRI 2016, Cape Town - South Africa Launch event ICRI 2016 Cape Town South Africa David Bohmert Member ESFRI Executive Board Swiss ESFRI Delegate.
Netherlands Organisation for Scientific Research
EUROPEAN UNION – MAKING OFF European Economic Community
INTAROS – Integrated Arctic Observation System
ACTRIS on the ESFRI Roadmap
PRACE Experiences of an e-Infrastructure Flagship Project
Venue: WIIW, Vienna Andrea Mervar, EIZ
JCOMM in-situ Observations Programme Support Centre www. jcommops
FP7-Infra : Design studies for European Research Infrastrutures
Baltic Sea Region Programme : New Funding Opportunities
European Ice Service EIS
Regional and Bilateral cooperation instruments
Overview of working draft v. 29 January 2018
Key Points from Development Partners Roundtable April 2016
JCOMM in-situ Observations Programme Support Centre www. jcommops
DG Environment, Unit D.2 Marine Environment and Water Industry
EuropeAid F3 Roberto Ridolfi, Head of Unit F3
Coordinating Operational Oceanography and Marine Meteorology
JCOMM in-situ Observations Programme Support Centre www. jcommops
CEITEC Nano Research Infrastructure
ASTRONET Coordinating strategic planning for European Astronomy
2nd Marine Board Forum: towards a European Network of Marine Observatories for monitoring and research Session 2: Projects and Initiatives Alan Edwards.
REPORTING ON DELIVERY OF EU BIODIVERSITY ACTION PLAN
Institut Français de Recherche pour l'Exploitation de la Mer
ACTRIS – EMEP, THE WAY FORWARD
The Joint Action on Health Information InfAct
Assembly of Members – 12 March 2019
Assembly of Members – 12 March 2019
GODAE Final Symposium, 12 – 15 November 2008, Nice, France
The marine perspective of Copernicus
Job de Kleuver NWO-I/APPEC
Experience of the implementation of FP6; preparations towards FP7
Presentation transcript:

Overview of Euro-Argo Preparatory Phase and status AST-10 Hangzhou, March 22 P.Y. Le Traon, Ifremer Euro-Argo: A new European Research Infrastructure Coordinator: Institut Français de Recherche pour l'Exploitation de la Mer - France

Euro-Argo : A new European research infrastructure European contribution to a global ocean observatory A significant component of the global Argo array of 3.000 floats in operations Requires strong international and European cooperation Proposal : Europe establishes an infrastructure for ¼, i.e. 800 floats in operation Requirement : 250 floats per year including regional enhancements (Nordic seas, Mediterranean&Black seas) (about 50 floats per year for regional enhancements)

Euro Argo Preparatory Phase (2008-2010) FP7 funding Euro Argo Preparatory Phase (2008-2010) FP7 funding. New European research infrastructure (ESFRI roadmap) Main expected outcomes : Agreement for long term (10-20 years) operation of Euro- Argo (financial, governance, organisation, technical). Member States and GMES. Most technical and organizational issues to be solved.

Euro Argo Preparatory Phase partnership 12 countries, 15 partners France: IFREMER (representing the multi- agency Coriolis project) + SHOM Germany: BSH + Konsortium Deutsche Meeresforschung (KDM) UK : Met Office and NERC. Netherlands: KNMI Spain: IEO Italy: OGS Ireland: Marine Institute Norway : IMR Portugal : FCCUL Greece : HCMR Bulgaria : USOF Poland : IOPAS

5

EURO ARGO PP in 2008/2009 see http://www.euro-argo.eu/ Kick Off 14/15 January, Ifremer, Brest First European Argo User Group meeting (June, 2008 Southampton) National discussions (ministerial level) Define infrastructure and overall cost (almost done) Interactions with GMES bureau (2 meetings) Interactions with ESFRI (update of roadmap published in 2008) Meetings and conferences (Eurogoos, GMES forum, GODAE, ESFRI) Legal and organization structure (to be decided mid 2009) Links with international structure (Argo, Jcomm) First annual meeting (Hamburg) (20-22 January) Joint discussion with GMES, DG Research and DG Mare (April, 2009) Second European Argo User Group meeting (Trieste, June 17-19, 2009) Decision on legal and governance structure (September 2009) Decision/commitments on long term funding (EC, Member States) (end of 2009). see http://www.euro-argo.eu/

Euro-Argo progress Several reports on infrastructure description, costs, float technology, deployement issues, data processing issues and improvements, impact of Argo data Float technology tests : Arvor-Iridium, Argos3, Sea Ice and O2 sensors Strengthening the user community in Europe Trying to secure national funding and attracting new countries EC long term funding and GMES Definition and agreement on the future governance and legal structure

Towards a long term Euro-Argo Research Infrastructure (RI) Objectives of the RI Better, more efficient coordination and cooperation Significant increase of European Argo contribution attract EC funding and secure sound funding base (national and EC) Improve the links with the international structure A central facility (Central RI) & Distributed national facilities Gouvernance model defined (council, board, scientific and technical AG). Coordination of European contribution to Argo (floats procured at national and through the central facility). Need a legal structure for the central RI To receive EC (GMES) and national (member states) funding. To procure floats (includes logicitics and test facilities). To provide funding to the AIC The centralized structure 2 (minimum) to 4-5 people funded by Euro-Argo members and by the EC

Long –term plan from Euro-Argo partners France - 65 floats (50 Ifremer, 15 SHOM). Yearly budgets but stable Germany - 50 floats (5-year) – operational line + 10 research mode United Kingdom - 30 floats (aspiration 45 floats). Spain: 20 floats in 2009 (inc. 8 Med Sea). Long term plans under discussion. Greece : 2 floats in 2009/2010. Plan for 4-5 floats/year Italy : 3 floats in 2009. Initial plan of 30 floats/year not accepted. Poland : 2 floats in 2009. Plan for 2/3 floats/year Portugual : setting up of a consortium (proposal). Good prospects. Ireland, Norway, Netherlands : no commitments for 2009. Bulgaria : 1 or 2 floats (goal) – Black Sea. A minimum target of 150 floats/year is realistic. EC funding needed to reach our goal (250 floats/year)

Euro Argo and GMES Argo is the single most important global/regional in-situ observing system for the GMES Marine Core Service. Delivers critical data for assimilation in ocean forecasting models, climate monitoring and seasonal to decadal forecasting. Feasibility demonstrated. Maturity. Ready for pre-operational implementation. It is thus essential for GMES (as it is for satellite data) to ensure that over the next 10 to 20 years, Argo will continue to provide the required global temperature and salinity observations.  Float technology will also evolve in the coming years to include new sensors (e.g. oxygen, biology) and new capabilities (e.g. under ice measurements) that are essential to the MCS.

Funding issues Estimation of Euro Argo cost is about 7.5 Meuros/year. Based on planned Member States contributions (4-5 Meuros/year), a direct EC funding (through GMES and DG Research) of about 2 to 3 Meuros/year focused on activities of European relevance will be needed (see below) from 2010.

Towards a long-term direct funding from the EC EC fully recognizes the need and importance to fund part of Euro-Argo. Good prospects for the post 2013 funding phase (GMES). Situation more difficult/complex in the short term. 2009-2013 : several EC funding lines are explored FP7 funding through GMES (FP7 Space) in a 2010 call DG Research / FP7 Capacities for post preparatory phase funding. DG Mare 2014 -2020 Euro-Argo part of a proposed “operational” GMES funding line (depends on decisions on long-term funding for GMES). Meeting end of April in Brussels with the EC