WEEKLY PHOTO REPORT WEEKLY PHOTO REPORT September 16 th, 2013 – October 25 th, 2013.
CURRENT WORK West Wing - Exterior: Masonry and shingles finished, fascia and soffit work ongoing - 1 st Floor: Final coat of paint, casework installed,
Progress and Status COMPANY SWITCHES INSTALLED A/V CABLE INSTALLED THEATRICAL CABLE INSTALLED ORCHESTRA LIFT IS OPERATIONAL STAGE.
Hospital of the Future Construction Update as of Dec. 3, 2010.
The Dalles Middle School
Update on FCPS Construction/Renovation Projects August 2009.
April 21, 2010 Barbara C. Jordan Elementary School Update Presented by.
Progress Report 12/13/11. Progress Schedule December 2011 Work Completed December: Installed Concrete topping on roof Rough In M&E East side screen wall.
Johanna Mikitka AE-390 October 13, 2004
Civil Engineering & Architecture 2.3 Residential Design.
October 2009 Construction Progress. University City School District Bond Wolfe Architects – architect McCarthy Construction – construction manager Barbara.
EXTERIORS FOR WOOD LIGHT FRAME CONSTRUCTION
Renovation Update Meeting: November 11, Phasing Plan: Currently working in Phase 5, Façade 6, and Crystal Palace.
Interior and Exterior Demo Continue Dust Control Measures for Air Quality Management Per LEED Construction Plan 4/16/12 – 4/20/12 Iconic Birdcage Removed.
Facilities Modernization Program Funded by Measure B Project Report April 16, 2012.
TECHNICAL ASSIGNMENT #1 – NATHAN BRASKEY SUNNYVALE PLAZA [Cooper Carry, Inc.]
House Construction. Learning Standard 5. Construction Technologies Construction technology involves building structures in order to contain, shelter,
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Chapter 22 Selecting Interior Finishes
Construction Residential Houses Definition of a House: A structure serving as a dwelling for one or more persons, especially for a family.
HVACR116 – Trade Skills Mechanical Drawings.
Precedent Analysis arc 572 UT Solar Decathlon 2009 BLOOMhouse University of Texas at Austin I 2007 ARCHITECTURE I INTERIOR I TECHNOLOGY I SOCIETY architecture.
MAIN ENTRANCE SOUTH EAST VIEW NORTH EAST VIEW.
Transportation Center Rolling Forward Into Phase 2 October, 2008.
Energy Performance and Moisture Control of Ceilings and Roofs 1.
Construction Update August 18, 2010 Rob Gaertner, P.E. Director of Facilities.
MSU/MCTC Law Enforcement and Criminal Justice Center March 10, 2010.
Chapter 23 Plumbing Systems. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify several.
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
Progress Photos Goodnoe Elementary School Additions and Renovations Project November 2013 Goodnoe Elementary School.
Facilities Modernization Program Funded by Measure B Project Report March 19, 2012.
Winchester Medical Center Campus Expansion June 21, 2011.
TCUSD New K-5 Construction PROJECT UPDATE NOVEMBER 4,
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
A-211 – Reflected Ceiling Plan, First Floor Building 1
ASSIGNMENT. Luanda, Angola Latitude: 8° 50' 18 S Longitude: 13° 14' 4 E.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
Phase III – SHDH Air Handler Upgrade Project Town Hall Meeting – July 21, 2015.
FORSYTH COUNTY SCHOOLS 2014 CAPITAL PROGRAM TIMELINE LOCATIONCONSTRUCTION PROJECTARCHITECTA/E STARTGC/CMOPENSUMMARY STATUS HIGH SCHOOL ADDITIONS AND MODIFICATIONS.
Elevating the Quality of Life in the District. Agenda  SITE VIEW  SECTIONS  CONSTRUCTION STRATEGY  TIMELINE – JUNE 2013 TO JULY 2015  TIMELINE –
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Organize Project Team 1 Project is to build Crew Boat facility on Lake Washington Construction Management involves working in teams to meet owner requirements.
October 19, 2011 Construction Progress Report. Construction Progress Report – October 19, 2011 Contract sum to date:$ 162,736,722* Total completed to.
Upon completion of this module, you will be able to:
Bond Oversight Committee
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
School Improvement Bond Projects
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Upcoming Activities Fun Fact Click here to view the live WEBCAM
San Luis Potosi – New plant April 24th 2015
Heating, Ventilating, and Air Conditioning
Heating, Ventilating, and Air-Conditioning
Troy School District Bond Program – Series 1 Construction Update
VINYL SIDING / CARPENTRY SECTION EXISTING CONDITION PHOTOS
Minuteman Vocational Technical Regional High School Progress
Carleton College Summer 2018 Science and Campus Construction Plan
Progress Report 11/10/11.
Permanent window shutter details
Minuteman Vocational Technical Regional High School Progress
Lehigh Valley Heritage Center
New White Lake Township Library
Wall and Ceiling Construction
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
EAST PENNSBORO AREA SCHOOL DISTRICT
Minuteman Vocational Technical Regional High School Progress
Presentation transcript:

Minuteman Vocational Technical Regional High School Progress December 17th 2018 – January 22nd 2018

January 22nd View of Area A+B – Upper Level Prime & First Coat of Painting Complete Ceiling Grid installation in progress January 22nd View of Area A+B – Lower Level MEP Devices – Lights, Cord Reels, Grilles installation in progress

January 18th View of Area A+B – Roof Level Roof Top equipment has been set, connections to equipment in progress. January 22nd View of Area A+B – Main Elect. Rm Permanent switchgear has been set. Distribution and terminations in progress.

January 18th View of Area G – Roof Level Roof Top Air Handlers have been set & connected. Metal Panel screen wall around perimeter of units in progress. January 22nd View of Area G – Upper Level Prime & First Coat of Painting Substantially Complete Ceiling Grid Installation to commence.

January 22nd View of Area E – East Elevation Roof Soffit Sheathed & AVB Complete. Masonry Stone Veneer in progress on lower level.

January 22nd View of Area E – Media Center Rough-in of Overhead MEP’s in Progress Wall Framing in Progress on Upper and Lower Levels.

January 22nd View of Area D – Upper Level Sheetrocking activities completed. Taping & Sanding Activities nearing completion.

January 22nd View of Area D – Gymnasium Rough-in of large overhead MEP’s is complete. Prime painting of walls, roof deck and MEP’s in progress.

January 22nd View of Area D – Mechanical Room Boilers, Pumps, Chiller and Water Heaters have been set. Terminations to equipment is in progress.

January 22nd View of Area E+F – Cafeteria Rough-in of overhead MEP’s is complete. Soffit framing in progress. Sheetrocking activities on Upper Level in progress.

January 22nd View of Area F – East Elevation Curtain Wall installation substantially complete. Architectural stone veneer complete. Metal panel installation in progress. January 22nd View of Area F – Lower Level Interior CMU wall construction complete. Interior wall framing in progress.

January 22nd View of Area C – West Elevation Masonry Veneer activities complete on the Theater tower. Veneer activities on the lower level in progress. January 22nd View of Area C – Mezzanine Level Misc Metal stairs and railings in progress. Overhead rough-in of MEP’s in progress.

January Construction Schedule Look Ahead: Area A+B Complete Taping on Lower Level B Commence Prime Painting on Lower Level B Commence installation of Lights, Registers and other MEP devices in ceiling grid Area G Complete taping activities on the Lower Level Continue prime painting activities on the Lower Level Commence Ceiling Grid installation on the Upper Level Area E Complete Curtain Wall & Window System installation Complete Rough-In of OH MEP’s on all levels Complete Wall Framing activities on all levels Continue Rough-In of in-wall MEP’s Continue Sheetrocking activities Area D Complete Masonry Veneer activities Complete Taping activities on Upper Level Continue Terminations of MEP’s to equipment in Mechanical Room Commence Prime Painting on Upper Level Area F Complete Rough-In of OH Duct work. Continue Wall Framing activities Commence Rough-In of in-wall MEP’s Area C Complete exterior masonry veneer on remaining elevations. Continue Rough-In of OH MEP’s over the theater space. Exterior/Sitework Complete setting balance of equipment curbs and equipment on all roof levels. Permanent power established for the building targeted for mid-February Project team currently coordinating with National Grid to obtain a schedule for the gas installation