Technical report Mats Lindroos.

Slides:



Advertisements
Similar presentations
DESIR Progress Report DESIR hall details defined for civil construction: - compressed air, liquid nitrogen, cooling water, etc detailed layout of RFQ-HRS.
Advertisements

Design of Beam Line for Ion Transport at Low Energies and The Ejection of Specific Ions From Electron Beam Brice Cannon † ** Research Advisor (s): Fredrik.
RFCC Module Update Derun Li Center for Beam Physics LBNL, Berkeley, CA MICO Weekly Phone Meeting March 21, 2011.
MICE Project Report Paul Drumm ~ Sunday August 1 st 2004.
Alain Blondel MICE VC 9 september 2010 Spokesmouse report o VC 22nd April o 12th-13th May posters for IPAC (Vittorio Palladino) o VC 20th May o IPAC May.
Neutron background measurement at LNGS: present status Measurement carried out in collaboration between LNGS ILIAS-JRA1 and ICARUS groups.
1 Warm Magnets Work Package Status J. Bauche, TE-MSC Technical Meeting, 9th January 2014.
On-line tests RFQ cooler ISCOOL A quick summary P. Delahaye, H. Frånberg, I. Podadera ISCOOL, COLLAPS, ISOLDE collaboration.
Template For Building Project Schedule Jazz Presentation.
Mats Lindroos Technical report Mats Lindroos on behalf of The ISOLDE team.
HIE-ISOLDE contribution packages M. Pasini BE/RF.
1 MICE CM28 PM Report Progress since CM27 Schedule, dates, milestones Electrical substation Visiting RAL Andy Nichols, STFC 4 th October 2010.
Mats Lindroos INTC Agenda 09:00 Introduction by the Chairman, J. Äystö 09:05 Report by the ISOLDE Technical Coordinator, M. Lindroos 09:25 Report by the.
1 BROOKHAVEN SCIENCE ASSOCIATES ASD Procurements Gregory Fries Liaison/Manufacturing Engineer NSLS-II ASAC October 22-23, 2009.
ISOLDE: Status report building th ISCC meeting CERN, 22 October 2013 Maria Borge, Erwin Siesling.
F Booster Long Straight Corrector Upgrade Technical Status and Schedule for Installation Craig Drennan DOE Tevatron Operations Review March 27, 2007.
Status of renewal of Buildings 115 & 507 Borge & Erwin Siesling.
RFQ cooler and buncher project for ISOLDE Present status and off-line test results Hanna Frånberg, ISOLDE.
Mid Term Review Meeting, 26 September 2012D. Lanaia1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
Mats Lindroos ISOLDE Technical report INTC 14/2/2007 Mats Lindroos.
ECOOL Meeting 03/26/10 1 Low-E cooler baseline decisions: 1.FNAL’s cooling section “as is” – with weak solenoids, correctors, etc. (to prevent over focusing.
Technical report for ISOLDE Mats Lindroos on behalf of the ISOLDE team.
Technical report for ISOLDE INTC 19 May 2007 Mats Lindroos.
Mid Term Review Meeting, 26 September 2012J. MONTAÑO1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
Georg Bollen Michigan State University Facility for Rare Isotope Beams ISOLDE Preparing for New Science Opportunities.
Last years of the SC-ISOLDE and move to the PS-booster H. Haas CICECO, Universidade de Aveiro, Aveiro, Portugal and CERN/PH-IS, CH-1211 Geneve-23,
Middle Fork Project Relicensing Process Plan April 25, 2006.
Technical Report for the ISCC Meeting 18 th May 2009 R. Catherall/ M. Lindroos.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
WLTP-13-xxe Report by Drafting Coordinator, Serge Dubuc WLTP GTR 15.
Development of High Current Bunched Magnetized Electron DC Photogun MEIC Collaboration Meeting Fall 2015 October 5 – 7, 2015 Riad Suleiman and Matt Poelker.
Do Now Write this down! Below are nets for 3D shapes. Identify the shape and find the area of the net cm 7 ft 10 ft.
D. Li, Project X Collaboration Meeting, Fermilab (October 25-27, 2011) Overview of Project X Frond-End R&D at LBNL Derun Li Project X Collaboration Meeting.
ELENA installation progress F. Butin / ELENA collaboration.
CBETA Project ALD’s Cost and Schedule Review February 6, 2017
The DESIR facility at SPIRAL2
Proposal to the INTC, 21. May 2007
Status of the CLIC DR wiggler design and production at BINP
HIE-ISOLDE Report Jose Alberto Rodriguez on behalf of Yacine Kadi and the HIE-ISOLDE project team.
Planning Geomagnetic Disturbance Task Force (PGDTF) Update to the ROS
Project Management Processes
AWAKE proposals for BE/BI
Target and Horn status report
Spectrometer Solenoid Fabrication Status and Schedule
Introduction to ISOLDE RFQ
ISOLDE Technical report for INTC 21/5/2007
Technical Report ISCC Meeting 16th February 2009
Magdalena Kowalska, CERN PH-SME-IS
Thermal emittance measurement Gun Spectrometer
Injector Performance Requirements Conventional Facilities Update
Technical report for ISOLDE INTC 19 May 2007
LCLS Injector: Introduction D. H
Preparation of the CLAS12 First Experiment Status and Time-Line
INTC September 2002 ISOLDE Mats Lindroos Mats Lindroos.
Mats Lindroos for The ISOLDE team
Advanced Research Electron Accelerator Laboratory
Project Management Processes
ESB Networks Market Release Meeting of the IGG, April 16th 2009
HIE-ISOLDE contribution packages
Florida Atlantic University
Cooler e-source Magnetized Beam LDRD Progress Report
LCLS Undulator System Status and Schedule
A. Herlert, CERN PH-SME-IS
LCLS Undulator System Status and Schedule
LCLS Injector System Overview D. H
The HIE-ISOLDE Design Study and the CATHI Fellow Participation
IKCA CEA Technical ANNEXES Follow up 18th DECEMBER 2015.
Accelerator Installation Schedule
EA Renovation Project – Project Team 29 – 28 June 2019 NEWS
Cooler e-source Magnetized Beam LDRD Progress Report
Presentation transcript:

Technical report Mats Lindroos

Consolidation project; part financed by ISC Outline Shutdown work Consolidation project; part financed by ISC Extensions

Shutdown work Migration of control system to JAVA Good progress Acceptance tests planned for March Work coordinated by Jose Sanchez (AB/OP) Emittance measurements on-line Renovation of stepping motor system General shutdown work

And the Emittance LA2 Experiment After HRS Magnet Fredrik Wenander, Tomas Fritioff, Tim Giles

ISOLDE consolidation HRS: Comment: Status: Milestones: Existing pool face windings restricted to corrections for masses below 13 due to “unexpected” field suppression from iron yoke Status: In progress Milestones: Emittance meters for 2004 run Study of external correctors and pool face shaping (simple) for 1 June 2003 Implementation of possible improvement for run in 2004 Budget from ISOLDE collaboration: Total: 300 kchf Committed: 5 kchf Responsible: Tim Giles and Thomas Fritioff

A New Emittance Meter for ISOLDE Tomas Fritioff

A New Emittance Meter for ISOLDE Beam energy 30-60 keV Emittance 10-20 p mm mrad Emittance meter should be small, 10 cm. Tomas Fritioff

ISOLDE consolidation RFQ cooler: Status: Milestones: In progress Milestones: Specification and budget for 15 March 2003 Drawings for 1 October 2003 Assembly complete for 1 March 2004 Off line tests finished 1 November 2004 Commissioning 1 March 2005 Budget from the ISOLDE collaboration and BMBF (LMU) Responsible: Ari Jokinen and Ivan Podadera

General Purpose RFQ cooler Ari Jokinen, Ivan Podadera, Tomas Fritioff

ISOLDE consolidation RILIS: Status: Milestones: In progress Milestones: Laser beam diagnostics - mid 2003 CVL beam guidance (screening of the laser beams) - mid 2003 Automated beam positioning - mid 2004 Automated laser power monitoring - mid 2004 Budget from the ISOLDE collaboration: Total: 220 Committed: 110 kchf Responsible: Valentin Fedosseev

ISOLDE consolidation Beam transport: Status: Milestones: In progress Milestones: Emittance measurements in Off-line period Documentation and proposal by 1 July 2003 Budget from the ISOLDE collaboration Total: 140 kchf Committed: 140 kchf Responsible: Fredrik Wenander and Tim Giles

ISOLDE consolidation Tape station hardware Status: Milestones: In progress Milestones: Definition March 2003 Budget from ISOLDE collaboration: Responsible: Gerrit Jan Focker and Philippe Dessange

Extensions Radioactive laboratory off class A (building 179) Details for financing under finalization Solid state laboratory (building 115) Financed through ISC Extension of hall Financing under discussion with the main part being external

Building 170