Overview of Progress with Management Procedures

Slides:



Advertisements
Similar presentations
Workshop 3 Writing a good thesis and graduating within a year: is it possible?
Advertisements

Review of industry code governance 26 March 2010.
Student Administration Improvement Programme. What do we mean by SAIP? A review of the processes we undertake to support the University in delivering.
Objectives By the end of this class you should be able to… Explain the importance of involving users in requirements gathering Describe various types of.
Problem Statement Give a formal Problem statement showing the input / output; objective (e.g. minimizing computational cost or other relevant metrics)
Figure 1.1 The observer in the truck sees the ball move in a vertical path when thrown upward. (b) The Earth observer views the path of the ball as a parabola.
Unit 2 Present Progressive and Simple Present. Unit 2 Present Progressive and Simple Present 2 Present Progressive.
New Assessment and tracking of Pupil Progress at West Byfleet Junior School Parents Information Evening March 2015.
JOB DESIGN. JOB DESIGN IS THE PROCESS OF DESIGNING THE CONTENT OF A JOB AND HOW IT WILL INTERACT WITH OTHER JOBS AND EMPLOYEES, TO MOTIVATE AND RETAIN.
Development and application of guidance documents – industry view Dr Martin Schaefer ECCA-ECPA Conference March 2014.
Spatial issues in WCPO stock assessments (bigeye and yellowfin tuna) Simon Hoyle SPC.
Trying Out The Scientific Method SNC2D. Trying out the Scientific Method ●Some of you will be studying paper airplanes. ●What question do we want to answer.
WP220 – Marine ecosystems and fisheries Tony Beeching Cefas.
Fisheries 101: Modeling and assessments to achieve sustainability Training Module July 2013.
NHMRC Development Grants Overall Objectives The aim of a Development Grant is to progress research to a stage where it can attract investment from.
Management Procedures (Prof Ray Hilborn). Current Management Cycle Fishery: Actual Catches Data Collection Assessment Management Decision.
AutoDESA Presentation Project Documentation October 2005.
Code Governance Review UNC Modification Proposals Beverley Viney - National Grid NTS.
PQRI Project Update Title of Work Project Date of Submission.
Project number Research Title Your name Your supervisor(s) Industry Champion (if appropriate) University Start enrolment:month/year Expected completion:month/year.
An Illustrative Example of a Management Procedure for Eastern North Atlantic Bluefin Tuna. Rebecca Rademeyer and Doug Butterworth NB: This is intended.
Day 4, Session 1 Abundance indices, CPUE, and CPUE standardisation
Training Learning to Work Efficiently and Accurately.
Generic Management Plans Use of the EFIMAS toolbox in their evaluation John Casey, Chair STECF.
A Brief intro to Project Management What can it do for you
Assessing Long Run Structural Change in Multi-Sector General Equilibrium Models Roberto Roson Dept. Economics, Ca’Foscari University, Venice and IEFE Bocconi.
LAA Judging Criteria & Process
Business Restructuring Panel
Mechanical Engineering Haldia Institute of Technology
APEC Collaborative IV Adoption of RE Standards in APEC Economies
Pics from trips Alan Pears AM
Consultation Practices within the Process of Public Policies -- Challenges and Opportunities Ministry of Interior and Administrative Reform 1A Revolution.
Training Presentation
Slides to illustrate relative value of various criteria in DSF
Exam Preparation Preparation for lessons should be done as homework and independent study tasks. Exam question set each wk as apart of homework and/or.
Policy Evaluation II (Feedback strategies)
Science Fair Project Title of Project Student Name(s) Teacher
BSHS 405 Competitive Success-- snaptutorial.com
BSHS 405 Education for Service-- snaptutorial.com
BSHS 405 Teaching Effectively-- snaptutorial.com
Presentation Training
Standards Based Grading
5 Diagnosing.
EEL 3705 / 3705L Digital Logic Design
A “Best Practices” Approach to Improved Operations & Maintenance of Water & Sewer Systems in Alaska Villages February 5, 2013 Bill Griffith Facility.
SUPREME COURT CASE PROJECT
Rectangle Ratios What does the word “similar” mean to most people?
General: Training - On-screen presentation
Ace it! Summer Conference 2011 Assessment
Organization Development and Change
Test procedure development
Extract from the REPORT OF THE 6th MEETING OF THE CCSBT STOCK ASSESSMENT GROUP AND THE 10th MEETING OF THE SCIENTIFIC COMMITTEE Taipei, 28 Aug – 9 Sep.
Code Governance Review UNC Modification Proposals
Item 6: Improving assessment of GES Draft conclusions and Way forward
Welcome to LAW112 Residential School Laura Longmore
LAA Judging Criteria & Process
Unit 5 – eProject – Starting to look at projects Unit 5
Unit 4 Fisheries Planning
Controlling BOH4M.
Training Presentation
CUSC “Alternate” Proposal process
The Scientific Method Question Hypothesis Procedure Results Conclusion
CUSC Amendment Panel Recommendation
WG GES: Decision review progress
YIELD CURVES.
Training Presentation
Warm-Up During our last class session, we completed a 10-minute paper in class. What were the three main parts of that paragraph? Which sentence frames.
DCUSA PARTY PANEL SECRETARIAT OFGEM CHANGE PROPOSAL SUBMITTED
For More Details:
Outline Context for database development Goals of database development
Presentation transcript:

Overview of Progress with Management Procedures By the Panel For the Industry Consultations

Industry Briefing To Explain Progress with Management Procedures. To Receive Industry Feedback about Practical Constraints. To Discuss Objectives and Weightings.

Operating Models Used So Far

Simple Rule Based MPs Simple Rules are Constant Catch or declining or increasing catch. Examples can be seen in A1-A3 of paper MP 6. These are not practical proposals! But, they help us to understand the nature of the Operating Models

Data (cpue) Based Man. Procs.

Details of Japan’s CPUE MPs

Details of Australia’s CPUE MPs

Assessment Based Man. Procs.

Details of Assessment Based MPs

Results from J1 and J2 for Unproductive Scenario (OM) MP 12 Fig 2.1

Results from J1 and J2 for Productive Scenario (OM) MP 12 Fig 2.1

Weighty Issues We need to find ways to Weight the various Operating Models (Scenarios). Chiefly in terms of how well they fit past data. (Mostly a scientific problem) We need to weight the various objectives. {e.g. Catch, Catch Variation, Biomass, etc} What these are and what weights they get are issues for Administrators and Industry input.