Content. Content Performance indicators based on the 3 pillars of sustainability.

Slides:



Advertisements
Similar presentations
Strengthening innovation in chemical clusters
Advertisements

Linking IATI information to recipient budgets. Why? Alignment of donors with government activities Division of labour between all actors Evaluation and.
I MPLEMENTING ACT ON THE METHODOLOGY FOR THE COST - BENEFIT ANALYSIS OF MAJOR PROJECTS Expert Group Meeting, 26 September 2013.
LCC YUSUF OZ FATIH BOLUKBAS HUSEYIN ANIL KARABULUT.
Directorate E: Agriculture and environment statistics; statistical cooperation Unit E3: Environment statistics 1 Commission proposals for the UNCEEA research.
Texas Recycling Summit, August , Woodlands, TX Environmental Performance of Recycling based on Life Cycle Assessment approaches Joep Meijer President.
TUHSD June 14, 2011 Making Sustainability Work Jonathan Schwartz Manager, Asset Optimization Kris Waters, CMIR Investment Recovery Manager.
Financial and economic performance of domestic biogas installations Not making money, still getting rich? Compact Biogas Course PPRE February 27 04, 2011.
SUSTAINABLE PLACES 2014, October , Nice, France
1 3.1 Light bulbs As an illustration, let’s have a closer look at light bulbs. The following video will illustrate to you all the LCA steps detailed until.
DANTES Akzo Nobel examples Johan Widheden
Life Cycle Assessment Overview of LCA and Methodology October 30, 2012.
GaBi The contribution of Life Cycle Assessment to global sustainability reporting of organizations J. Pflieger, M. Fischer, T. Kupfer, P. Eyerer University.
Economics of Sustainability When money speaks, nobody cares for the grammar!
Nirmala Menikpura Institute of Global Environmental Strategies (IGES) Life cycle greenhouse gas emissions and other impacts from recycling activities:
RES/CHP Support Scheme in Slovenia Conference: Sustainable Energy Development in SE Europe Irena Praček, Director, Energy Agency of the Republic of Slovenia.
RTI,Chennai Learning Objective Given the concepts of Decision Analysis, Option Pricing and Investment Decisions, the trainee will be able to audit the.
Cost Benefit Analysis As economists, we are usually called in when the project is already designed.
COMPETITIVENESS OF THE CONSTRUCTION INDUSTRY ECN Athens, 19 and 20 June 2003 COMPETITIVENESS : THE PRESENT SITUATION ECN Athens 09 EB 03/025.
1 Joint Venture Analysis Capturing the Japanese Offshore Wind Turbines Market Miranda Ford Johnathan Gritz Jeremy Himelfarb Chris Loftus Jason Shu April.
Eco-innovation Carlos Toro Project Manager - LCA 5 September 2013.
Phoenix Convention Center Phoenix, Arizona Introduction to Life-Cycle Cost Analysis Agency Energy ManagerLife-Cycle Cost Methodology Mike Mills, CPA, BEP.
SITUATION ANALYSIS. CONTENT Why do we do a situation analysis? What needs to be achieved? Steps in development of the Situation analysis Defining provisional.
RECP AND ENTREPRENEUR DEVELOPMENT (FINANCING RECP IN EL SALVADOR) Yolanda Salazar de Tobar Executive Director NCPC EL SALVADOR.
One-Degree Imager (ODI), WIYN Observatory SolidWorks SustainabilityXpress Program Overview engineering.
NEW VISION OF ENGINEERING ECONOMY COURSE (VISION) MODULE 3 LECTURE 1-2 Cairo, 13 July 2005.
Ghent University – Department Agricultural Economics Project Management Financial and economic analysis of investment projects.
May , 2008 Bucharest 1 Regional Workshop on Uniform System of Accounts and Regulatory reporting Evgenija Kiprovska, Head of Economic department.
IZABELLA K. LENTINO JORGE MARTINS MILENA BODMER presents Joint development feasibility.
NEW VISION OF ENGINEERING ECONOMY COURSE (VISION) MODULE 3 LECTURE 3 Cairo, 14 July 2005.
Financial evaluation 9 March Financial Feasibility Assess the ability of the utility or developer to meet the financial obligations associated with.
+ Parkview Personal Care Home Micheline Gaudet. + Welcome Home.
Demonstrate and Assess New Tools for Environmental Sustainability DANTES LCA of Industrial Packaging for Chemicals Aim of the study –to evaluate the potential.
AGEC 407 Investment Analysis Time value of money –$1 received today is worth more than $1 received in the future Why? –Earning potential –Risk –Inflation.
1C1 Design of sustainable construction Petr Hájek.
Life-cycle cost analysis (LCCA)
CENTURY 21 ACCOUNTING © 2009 South-Western, Cengage Learning LESSON 16-1 Business Decisions Using Present Values.
Universität Stuttgart | Institut für Bauökonomie | Dipl.-Ing. Maike Buttler Doctoral Session - ERES Conference - June 2009 CASBEE since 2001 DGNB since.
Company Cashflow Environment Community Project Assessment Tools Project Raw materials and Energy Waste Capital Labor and Equipment.
Equipment Rating & Economic Evaluation. Course outline  Equipment rating  Economic evaluation of a flowsheet Engineering economic review Cost factors.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Engineering Economic Decisions Lecture.
FIN 614: Financial Management Larry Schrenk, Instructor.
EGR Break-Even Analysis Break-even Analysis – performed to determine the value of a variable that makes two elements equal. In economic terms:
Energy Analysis The energy model was defined as: EMBODIED ENERGY + OPERATIONAL ENERGY.
A3: Microeconomic sustainability assessment – Challenge Page 1  Life Cycle Sustainability Assessment (LCSA)  Data collection  Different maturity of.
EFORWOOD Tools for Sustainability Impact Assessment of the Forestry-Wood Chain.
WP 7 – Integrated Sustainability and Business Viability Assessment
Basics of financial management Chapter 5
Other Financial Methodologies Pertemuan 9-12
Renewable energy supply chains
A screening life cycle analysis of a hospital building in Flanders
Stanislav Vitásek, Sonia Ahmed
Characterisation framework for energy-saving hotels in South Africa
بسم الله الرحمن الرحيم قَالُوا سُبْحَانَكَ لا عِلْمَ لَنَا إلاَّ مَا عَلَّمْتَنَا إنَّكَ أَنتَ العَلِيمُ الحَكِيمُ صدق الله العظيم ( البقرة 32 )
دراسة جدوى مشروعات تفريخ الأسماك (دورة تدريبيـــــــــــــــة)
التقييم المالي للمشروع
نام: عنوان طرح / شرکت.
Multi-Criteria Assessment Tool for Floating Offshore Wind Power Plants
By Muhammad Shahid Iqbal
دانشگاه شهیدرجایی تهران
Fundamentals: Comparing different options
تعهدات مشتری در کنوانسیون بیع بین المللی
TRACECA PROJECT EVALUATION
C3 Design of sustainable construction
Research on key technologies and applications of alternative habitats protection in tributary WU Sainan, LIU Chunna National Research Center for Sustainable.
Goal and Scope Rubric, 0.5 points
EeEmbedded partners. eeEmbedded partners Content.
Chapter 7.
Predictive Analytics Can Boost the Bottom Line
Energy Investments for Future Returns Jeremy Faust, Environmental Sustainability Leader April 25, 2019.
Presentation transcript:

Content

Performance indicators based on the 3 pillars of sustainability

Level Of development

Life Cycle Energy consumption

Selection Criteria

Results of the impact assessment in iTWO

Environmental Indicators and ecological currencies (LCA KPIs)

Sustainability Model

Economical Assessment

Life cycle costing

Methodology: Parameter and study period

Investment and Replacement Cost

Energy Cost

Maintenance and Operational cost

Residual Cost

Cash Flow

Scheduling

Net Present Value

KPI and Controlling

Internal Rate of Return (IRR)

Impact of CASBEE indicators on revenue, costs, risks and image

Analysis approaches within the design phases

LCA: KPI View

LCC: KPI view

Thank you for your attention