Damage Control Plotting Drill #1

Slides:



Advertisements
Similar presentations
The Care and Feeding of Silane Art Garcia FM Global March 23, 2006.
Advertisements

Inward Opening Door. Outward Opening Door The Fatal Funnel.
INVESTIGATION LESSON TOPIC 1.9 IDENTIFY IDENTIFY the need for principle of, and equipment required to investigate for fire, flooding and structural damage.
Pre-Fire Survey NAME HERE. Amidships Crane- 01 Qtr Deck Midships Zone: 3.
14 Ventilation Skill Drills. 2 Objectives (1 of 2) Break glass with a hand tool. Break a window with a ladder. Break windows on upper floors using the.
1 Damage Control Rapid Plotting. 2 Enabling Objectives 1 Select statements which describe the purpose of DC diagrams, status boards and logs 2Record casualties.
Damage Control II Objectives DC Actions & Reports DC Actions & Reports Classes of Fires & Combating them Classes of Fires & Combating them Firefighting.
Chapter 3 Review Test Tomorrow.
KLINGE’S NMR 262 Two Independent Systems Integrated into one Unit This Requires Special Features:  Total Redundancy of Refrigeration Components  Total.
Flight Operations By LT Fullan. Objectives Winds Terms Types of launches Types of recoveries Plane guard positions Casualty procedures Personnel involved.
Impaired Stability.
A) 80 b) 53 c) 13 d) x 2 = : 10 = 3, x 3 = 309.
Industrial Skills Area: Descriptions, Calculations & Industrial Applications.
TECHNICAL ASSIGNMENT #1 – NATHAN BRASKEY SUNNYVALE PLAZA [Cooper Carry, Inc.]
Ship Design & Engineering
LESSON TOPIC 1.2 SHORING.
Word ProblemArea or Perimeter?Equation and Answer Area/Perimeter Cut and PasteName: _______________________.
Industrial Skills Area: Descriptions, Calculations & Industrial Applications.
4100 HP Maintenance Kit Enter
Dewatering Equipment.
Firemain S W O T E A M D G C N R L American LaFrance LT.311.
DROP IN ANCHOR DETAIL COMMERCIAL SERIES LIFTS INSTALLATION MANUAL Drop In Anchor/COMMERCIAL SERIES.
3 CASE STUDIES - POTENTIALLY POLLUTING WRECKS SS JACOB LUCKENBACH SS PALO ALTO F/V MWAALIL SAAT.
Damage Control Training and Testing
Investigator Casualty Guide Identifying & Assessing Damage “Looking Deeper” March 2013.
Carigara Situation Update
Gas Free Engineering. Damage ICON’s: Damage Pictures: Select ICON and PICTURE Area secured Contractors Cold work Field activity Gas Free Engineering HAZMAT.
AMERICAN EAGLE OUTFITTERS Quantum II Corporate Headquarters Michael Sandretto Spring – 2007 Structural Option.
FLOODING OVERVIEW FLOWCHART
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Boat Seamanship B asic E ngineering C asualty C ontrol E xercises.
United States Fire Administration Chief Officer Training Curriculum Operations Module 18: Penal Institution Simulation Exercise.
DCAMS Simple Casualty Knowledge Management
Next Generation 911 Update. Imagery 1 foot resolution WMS is available now To request the imagery, please click on the following link:
USS DEWERT (FFG-45) Example of Major Casualty Training Scenario for Final Evaluation.
Flag Chemical, Biological and Radiological Training Kit USERS GUIDE.
Fire Fighting Systems Fi Fi Mains ●White System: This system has a lower output as far as volume goes. This main supplies 3x Eductor/Hydrants (500 gpm).
Power Distribution System General Location. Power Distribution The Main Switchboard is the hub of the electrical distribution system. Everything ties.
Red/Green Fire Fighting Systems Fi Fi Mains ●Red System: Port Side Fire Main supplies two Monitors. M7 (6000) gpm on centerline on the fwd Wheelhouse top.
Bilge Pumping Systems General Locations.
4.7 Principles of Controlling Flooding FULL LOAD MIN OP LIGHTSHIP W J J P E F E W.
1 FB 2 STARTING PROCEDURES RADIO MASTER SWITCH UP IS “ON” Assess readiness to get underway Energize the following: 1) Radio Master Switch, Panel DC-1 NOTE.
4.7 Principles of Controlling Flooding FULL LOAD MIN OP LIGHTSHIP W J J P E F E W.
What is the most frequently used method to extinguish a fire aboard ship? NS3 Naval Skills Damage Control and Firefighting Unit 1 Chapter 2.
14.0 Math Review 14.2 Inches to Feet & Areas. Division 80 ÷ 5 = 16 Also written as:
Damage Control Systems & Equipment. Learning Objectives You, the student, will: Know the typical shipboard damage control organization and the responsibilities.
SecureConnect Remote Operator
Escalator Installation
WAKE CONTROL Umpire boat wake – a subject of increasing importance
Help / Training / POC Tip 004: DCAMS 02 Plotter Basic
BASIC OF THE COMPUTER SYSTEM. INPUT/OUTPUT INPUT DEVICES MOUSE KEYBOARD SCANNER OUTPUT DEVICES PRINTER MONITER.
Fire Fire drill.
Lesson 18 Example 1.
VISUAL MANAGEMENT TOOL
Performance Based Design of a Steel Frame Hotel
RUNWAY OBSTRUCTIONS.
DC FITTINGS LOCATION & IDENTIFICATION
Lesson 4.3 Loose Water G B M B1 G2 Z Z2 G3 Z3.
Fire Safety Month October 2018
A2/B2 CROSSCONNECT VALVE FPL (located on D1 Level)
A2/B2 CROSSCONNECT VALVE FPL (located on D1 Level)
Similar triangles.
Tankabel Mining Co., Inc. I.D. No Rochester, NY Map Legend:
Projected Development
Damage Control Rapid Plotting
THE STARK INCIDENT DIRECT DAMAGE COST CAME TO $142,000,000.
Developed by FFDSD Shipboard Committee
Computer Monitor Fire CincLantFlt Norfolk A computer monitor left on over a weekend caused this fire resulting in $100,000 damage. TURN OFF ELECTRICAL.
NAVSEA 05L4 Damage Control USS COLE DDG67.
 Axial MRI of a 46 year old man with secondary progressive MS showing a large left sided periventricular lesion which is hyperintense with (A) T2 weighted.
Presentation transcript:

Damage Control Plotting Drill #1

Drill # 1 Time: 0900; From OSL to Rep 3 Time: 0905; From OSL to Rep 3 smoke reported, black, compartment 2-328-2-L Time: 0905; From OSL to Rep 3 Class "A" fire, compartment 2-328-0-Q Time: 0911; From OSL to Rep 3 Request fire boundaries, Primary 328, 368 Secondary 292, 418

Drill # 1 Time: 0913; From OSL to Rep 3 Time: 0917; From OSL to Rep 3 Request magazine sprinkler system be manned, compartment 2-328-0-Q Time: 0917; From OSL to Rep 3 Electrical power engaged, compartment 2-328-0-Q Time: 0918; From Rep 3 to OSL Fire boundaries ordered, Primary 328, 368 Secondary 292, 418

Drill # 1 Time: 0920; From OSL to Rep 3 Time: 0924; From OSL to Rep 3 Shoring required at scene, compartment 2-368-01-L, frame 368, Remarks-QAWTD 2-386-2 (I type) Time: 0924; From OSL to Rep 3 Compartment Demolished, 2-368-1-A Time: 0928; From OSL to Rep 3 Fire boundaries set, compartment 2-328-0-Q Primary 328, 368 Secondary 292,418

Drill # 1 10 Time: 0931; From OSL to Rep 3 Class "A" fire engaged, compartment 2-328-0-Q 11 Time: 0940; From OSL to Rep 3 6 inch Hole reported, compartment 2-328-2-L, at frame 365, center of hole is 4 foot off the deck, port side 12 Time: 0951; From OSL to Rep 3 Class "A" fire out (No Casualty), compartment 2-328-0-Q

Drill # 1 13 Time: 0956; From OSL to Rep 3 Ruptured firemain reported, compartment 2-368-01-L, frame 388, on the centerline overhead 14 Time: 1001; From OSL to Rep 3 Shoring in progress, (Steel) compartment 2-368-01-L, Remarks: QAWTD 2-386-2

Drill # 1 15 Time: 1012; From OSL to Rep 3 Ruptured firemain isolated, COV 2-366-2, compartment 2-328-2-L, at frame 388 16 Time: 1018; From OSL to Rep 3 Compartment cleared, 2-368-1-A. 17 Time: 1023; From OSL to Rep 3 Shoring complete, (I Type)No structure damage Remarks: QAWTD 2-386-2

Drill #1 18 Time: 1033; From OSL to Rep 3 6 inch hole, plugging in progress, compartment 2-328-2-L

Drill # 1 19 Time: 1040; From OSL to Rep 3 Smoke cleared, black, compartment 2-328-2-L, Ram Fan (2000 CFM, 125 PSI).

Drill # 1 20 Time: 1110; From OSL to Rep 3 No apparent electrical damage, compartment 2-328-0-Q

Drill # 1 LAST MESSAGE!! 21 Time: 1123; From OSL to Rep 3 No apparent damage surrounding areas, compartment 2-328-0-Q LAST MESSAGE!!

S Time: 0900 # 1 From To Black 2-328-2-L Message # 1 F/M-INV-SL DCRS-2 X DCRS-5 X DCC 2-328-2-L COMP.# NAME Message # 1 Frame Remarks: OVHD/FWD PORT STBD DECK/AFT BOUNDARIES S P P S FB- SB- FLB- CB

A Time: 0905 # 2 From To X 2-328-0-Q Message # 2 F/M-INV-SL DCRS-2 DCC 2-328-0-Q COMP.# NAME Message # 2 Frame Remarks: OVHD/FWD PORT STBD DECK/AFT BOUNDARIES S P P S FB- SB- FLB- CB

Time: 0911 #3 FB From To X X Message #3 F/M-INV-SL DCRS-2 DCRS-3 DCC COMP.# NAME Message #3 Request fire boundaries Pri 328, 368 sec 292, 418 Frame Remarks: OVHD/FWD PORT STBD DECK/AFT BOUNDARIES S P P S FB- SB- FLB- CB

Time: 0913 #4 From To X X Message #4 F/M-INV-SL DCRS-2 DCRS-3 DCRS-5 DCC COMP.# NAME Message #4 Frame Request Mag Sprinkler sys manned 2-328-0-Q. Remarks: OVHD/FWD PORT STBD DECK/AFT BOUNDARIES S P P S FB- SB- FLB- CB

Time: 0917 #5 From To x x 2-328-0-Q E Message #5 F/M-INV-SL DCRS-2 DCC COMP.# NAME 2-328-0-Q E Message #5 Frame Remarks: OVHD/FWD PORT STBD DECK/AFT BOUNDARIES S P P S FB- SB- FLB- CB

Time:0918 #6 FB From To x x Message #6 F/M-INV-SL DCRS-2 DCRS-3 DCRS-5 DCC COMP.# NAME Message #6 Frame Remarks: OVHD/FWD PORT STBD DECK/AFT BOUNDARIES S P P S FB- SB- FLB- CB 292 328 368 418

Time:0920 #7 From To x x Message #7 QAWTD 2-386-2 I-TYPE F/M-INV-SL STR I-TYPE x F/M-INV-SL DCRS-2 x DCRS-3 DCRS-5 DCC COMP.# NAME Message #7 Frame Remarks: QAWTD 2-386-2 OVHD/FWD PORT STBD DECK/AFT BOUNDARIES S P P S FB- SB- FLB- CB

Time:0924 #8 C/D From To x x 2-368-1-A Message #8 F/M-INV-SL DCRS-2 DCC 2-368-1-A COMP.# NAME Message #8 Frame Remarks: OVHD/FWD PORT STBD DECK/AFT BOUNDARIES S P P S FB- SB- FLB- CB

Time: 0928 #9 From To x x 2-328-0-Q FB Message #9 F/M-INV-SL DCRS-2 DCC 2-328-0-Q COMP.# NAME FB Message #9 Frame Remarks: OVHD/FWD PORT STBD DECK/AFT BOUNDARIES S P P S FB- SB- FLB- CB 292 328 368 418

Time: 0931 #10 From To x x 2-328-0-Q A Message #10 F/M-INV-SL DCRS-2 DCC 2-328-0-Q COMP.# NAME A Message #10 Frame Remarks: OVHD/FWD PORT STBD DECK/AFT BOUNDARIES S P P S FB- SB- FLB- CB

Time: 0940 #11 H From To x x 2-328-2-L Message #11 6 in 4FT F/M-INV-SL 4’ off deck From To x F/M-INV-SL DCRS-2 x DCRS-3 DCRS-5 DCC 2-328-2-L COMP.# NAME Message #11 Frame Remarks: OVHD/FWD 6 in PORT STBD 4FT DECK/AFT BOUNDARIES S P P S FB- SB- FLB- CB

Time:0951 #12 From To x x 2-328-0-Q Message #12 A F/M-INV-SL DCRS-2 DCC 2-328-0-Q COMP.# NAME Message #12 Frame Remarks: OVHD/FWD A PORT STBD DECK/AFT BOUNDARIES S P P S FB- SB- FLB- CB

Time: 0956 #13 From To x x 2-368-01-L Message #13 F/M-INV-SL DCRS-2 DCC 2-368-01-L COMP.# NAME Message #13 Frame Remarks: OVHD/FWD PORT STBD DECK/AFT BOUNDARIES S P P S FB- SB- FLB- CB

Time:1001 #14 From To x x 2-368-01-L Message #14 QAWTD 2-386-2 F/M-INV-SL DCRS-2 x DCRS-3 DCRS-5 DCC 2-368-01-L COMP.# NAME STR I-TYPE Message #14 Frame QAWTD 2-386-2 Remarks: OVHD/FWD PORT STBD DECK/AFT BOUNDARIES S P P S FB- SB- FLB- CB

Time:1012 #15 From To x x 2-366-2-L Message #15 R FM FR 388 F/M-INV-SL DCRS-2 x DCRS-3 DCRS-5 DCC 2-366-2-L COMP.# NAME Message #15 R FM FR 388 Frame Remarks: COV 2-366-2 OVHD/FWD PORT STBD DECK/AFT BOUNDARIES S P P S FB- SB- FLB- CB

Time:1018 #16 From To x x 2-368-1-A C/D Message #16 F/M-INV-SL DCRS-2 DCC 2-368-1-A COMP.# NAME C/D Message #16 Frame Remarks: OVHD/FWD PORT STBD DECK/AFT BOUNDARIES S P P S FB- SB- FLB- CB

Time:1023 #17 From To x x Message #17 QAWTD 2-386-2 F/M-INV-SL DCRS-2 DCC COMP.# NAME Message #17 Frame Remarks: QAWTD 2-386-2 OVHD/FWD STR I-TYPE PORT STBD DECK/AFT BOUNDARIES S P P S FB- SB- FLB- CB

Time:1033 #18 From To x x H 6” fr 365 4’ off deck Message #18 6IN 4FT F/M-INV-SL DCRS-2 x DCRS-3 DCRS-5 DCC COMP.# NAME H 6” fr 365 4’ off deck Message #18 Frame Remarks: OVHD/FWD 6IN PORT STBD 4FT DECK/AFT BOUNDARIES S P P S FB- SB- FLB- CB

Time:1040 #19 From To x x 2-368-01-L Message #19 S F/M-INV-SL DCRS-2 DCC 2-368-01-L COMP.# NAME Message #19 Frame Remarks: Ram Fan (2000 CFM, 125 PSI) OVHD/FWD S PORT STBD DECK/AFT BOUNDARIES S P P S FB- SB- FLB- CB

Time: 1110 #20 NAED From To x x 2-328-2-L Message #20 F/M-INV-SL DCRS-2 x DCRS-3 DCRS-5 DCC 2-328-2-L COMP.# NAME Message #20 Frame Remarks: OVHD/FWD PORT STBD DECK/AFT BOUNDARIES S P P S FB- SB- FLB- CB

Time:1123 #21 NADS From To x x Message #21 F/M-INV-SL DCRS-2 DCRS-3 DCC COMP.# NAME Message #21 Frame Remarks: OVHD/FWD PORT STBD DECK/AFT BOUNDARIES S P P S FB- SB- FLB- CB