XRN4790 – Introduction of winter read/consumption reports

Slides:



Advertisements
Similar presentations
1 Project Smart Metering Portfolio Foundation Updates June 2013.
Advertisements

Project Nexus Workgroup 9 th September Background During detailed design a number of areas have been identified that require clarification with.
AQ Overview.  Annual Quantity (AQ) is a value held for each meter point that reflects the expectation as to the volume of gas that a meter point will.
Project Nexus Workgroup AQ Backstop Date Options 7 th October 2014.
UNC G7.3.7 Invoicing Read Estimation Proposal Requirement for Read Estimation & Proposed Methodology Dean Johnson Distribution Workstream – 25 th August.
Meter Read Validation 11 th August Background The meter read validation principles were developed under ‘The Settlement’ BRD and formed part of.
1 Mod Review Group 126 Mar 2007 slides 126 Review Group – Restriction of Invoice Billing Period  The review proposal is primarily concerned with restricting.
1 Review Group 264 Rules & Options Analysis for BSSOQ Methodology Changes Post MOD th September 2009.
UNC Modification Proposal 0380 Periodic Annual Quantity Calculation Calculation of Daily Supply Point Capacity Alan Raper – DNCMF 26 th September 2011.
1 Modification 0152V Implementation Matters 25 October 2007.
Rolling AQ – Initial Calculation
UNC Modification Proposal 0202 National Grid Distribution
Capacity Conversion – 616s
Project Nexus Workgroup (Settlement)
UKL Future Release 2 Cutover/Implementation
Background - Tolerance Rules
Amendment Invoice Task Force Progress Report
Overall Project RAG Status:
PAF Risk Register and PARR mapping
DSC Change Committee Summary – 13th June
Change Management Committee – June 2019 Update
DSC Change Committee Summary – 7th November
R&N Timeline Release 2 Release 3 Feb-19 June-19
Change Management Committee – June 2019 Update
DSC Change Budget 17th October 2018
CSEPs Reconciliation Proposals
UNC Mod Retrospective Invoice Limitation © 24 November 2009 EDF Energy plc. All rights Reserved.
DSC Change Committee Summary – 11th July
Impacts of Project Nexus Implementation Date to AQ17
UNC Mod 392/ IGT Mod 040 Proposal to amend Annex A of the CSEP NExA table, by replacing the current version of the AQ table August 2011.
DSC Change Committee Summary – 10th October
DSC Change Committee Summary – 9th May
R&N Timeline June-19 Sept-19 (EUC) Nov-19 Minor Release D4
UIG Task Force Progress Report
June 2019 Release Scope DSC Change Management Committee
Mod Proposal 0268 : AQ Backstop Date
Release 3 Scope Selection and Plans
Amendment Invoice Task Force Progress Report
UIG Task Force Progress Report
PLANNING LOOKING AHEAD…. Long Term Goals (Assigned to…)
Deferral of Retrospective Updates Functionality
UIG Task Force Progress Report
Nexus Workgroup Winter Consumption and the influence on Winter Annual Ratio (WAR) Bands 8th January 2014.
Joint Theft Reporting Review (from meeting 1st March 2019)
Modification 421 – Updates and Benefits Case
Overview of RbD Risk Modelling 31 March 2008
DN Interruption Phase II
AQ Threshold Analysis Steve Taylor Centrica plc.
XRN Nov 19 Release - Status Update
Development Work Group 0209 Straw Man Update
Implementation Approach Distribution Workgroup – June 2014
UIG Task Force Progress Report
Meter Read Rejections ..
Meter Reads.
UIG Task Force Progress Report
Customer Issue Management CoMC Update
UIG Task Force Progress Report
Proposal to issue first report in December 2018
Annual Quantity (AQ) 45.
Change Proposals – PARR report changes
High Level System Solution Impact Assessment
Customer Issue Management CoMC Update for April & May 2019
CSEPs SPA Rejections January – August 2007
XRN Nov 19 Release - Status Update
UIG Task Force Progress Report
Further Considerations
Enabling Large Scale Utilisation of Class 3
DSC Change Committee Update
XRN Nov 19 Release - Status Update
XRN Enabling large scale utilisation of Class 3 – MOD0700
Presentation transcript:

XRN4790 – Introduction of winter read/consumption reports Winter consumption Calculation

Winter Consumption Calculation Annual process for Meter Points in EUC03-08 Requires Actual read between 1st Nov – 31st Dec and 1st March – 30th April each year Based on A reads in the period above a winter consumption is calculated The calculated volume is used to apply a WAR Band to the Meter Point Without a default WAR band is assigned

Winter Consumption calculation The job is scheduled to run in mid May each year A User has up to 25 Supply Point Business Days to submit a class 4 read (UNC M5.9.4 – in the context of 50% of reads due by 10th Supply Point Business days and 100% of reads due to be submitted by 25th Supply Business Day) 25th Supply Point Business day is early June each year.

So…….. Valid UNC Actual Reads submitted with a read date on/before 30th April submitted after the Winter Consumption Job has commenced will not be considered Will be notified to user that a new value has not calculated (T50/T51 files) This was discovered as part of the analysis work for XRN4790

Considerations These are mandated to be monthly read sites therefore should be a read in March (excepting some have annually read Meter Read Frequency) Only impacts those meter points in EUC03-08) Will be notified the meter points do not have a successful Winter Consumption Calculation (T50/T51) Can submit a Winter Consumption Calculation correction (so not in the bucket WAR band)

Next Steps/Recommendations Insufficient time to fully assess impacts of moving the Job to Mid June each year (Xoserve or its customers) Xoserve could produce reporting for those reads submitted with read date in April 2019 (that are in EUC03-08) but submitted after Winter Consumption Calculation job has commenced. Raise CP if wished to be assessed and possibly changed for 2020.