A. Bignami on behalf of LASA SRF Group

Slides:



Advertisements
Similar presentations
Status of the SPL cavities at CERN I.Aviles & N. Valverde on behalf of SPL team 1I. Aviles & N. ValverdeLund, 11 December 2013.
Advertisements

TESLA MEETING May 2003 Frascati LINAC TECHNOLOGY WORKING GROUP Working Group Linac techology introduction Cryomodule design and Assy. Tuner issue.
CERN status - Nb cavity – Manufacturing 1 15/Nevember/2010, Ofelia Capatina EN/MME 1 SPL Cavity Working Group Meeting TaskExternal Company CERN Provide.
Accelerator/WP High Beta Structures Alan Wheelhouse HIGH-BETA CAVITY DELIVERY April 21, 2015.
The ESS Linear Accelerator
Americas Cavity Specification C.M. Ginsburg (Fermilab) On behalf of the Fermilab cavity crew October 20, 2010.
LASA Medium-β Cavity Progress Update Paolo Michelato 2 nd ESS Collaboration Meeting - SRF Elliptical Cavities 15 th December 2015.
Accelerator/ Medium Beta Cavities Paolo Michelato INFN Milano - LASA April 21, 2015.
Medium Beta Cavities Paolo Michelato, Paolo Pierini, and Carlo Pagani INFN Milano - LASA.
Medium beta cavities Paolo Michelato, Paolo Pierini, Carlo Pagani INFN Milano - LASA.
HiGrade-Kickoff DESY Global Design Effort 1 ILC-HiGrade WP6 High-Gradient cavities Lutz Lilje DESY.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
Status of TTF3 Coupler Assembly Program November 26, 2007 Jeff Tice.
C.MADEC - TTC meeting E-XFEL cryomodule assembly : prototyping phase at Saclay.
W. Singer. SRF2011, July 25 ‐ 29, 2011, Chicago, Illinois, U.S.A. XFEL Cavity Recipe for Mechanical Fabrication and Treatment Waldemar Singer/DESY.
SRF COLLABORATION MEETING MAY.2016 ESS MEDIUM BETA CAVITY MANUFACTURING CEA Saclay/ESS ECCTD WU Cavités | Enrico Cenni.
LASA status for medium-beta cavity Paolo Michelato.
Shrikant_Pattalwar ICEC 26, March 7-11, 2016, Delhi 1 Horizontal Tests in a Vertical Cryostat Shrikant Pattalwar STFC Daresbury Laboratory UK.
Wish list from ESS Christine Darve H-ECCTD Kick-off meeting 16 March
S. Barbanotti - DESY Requirements Conformance for SRF Cryomodules Workshop 16/10/2014 – ESS, Lund XFEL cryostat main components: Quality Assurance and.
Accelerator/ Medium Beta Cavities Rocco Paparella on behalf of INFN Milano – LASA ESS Team April 21st, 2016.
CEA - Irfu – Mois 2011 – 1 Cavity-string alignment experience in the EXFEL prototype cryomodule assembly Michel Fontaine CEA – SACLAY DSM/IRFU/SIS TTC.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
Quality Plan Documentation Management & Non Conformities ESS PDR, INFN-LASA, 19 May 2016Laura Monaco, INFN LASA.
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
WP High Beta Cavities Delivery
Crab Cavity Technical Coordination meeting:
Vertical Electro-Polishing activities at CEA Saclay
Strategy and Status of Reference Cavities for European XFEL
Status of the M-ECCTD F. Peauger - P. Bosland
Cryomodule test stand at ESS site
Quality assurance for Manufacturing Dressed Cavities for SPS prototype cryomodule C. Parente (HL-LHC Technical Quality Officer) Date:
Status and plans for the 3.9 GHz section of XFEL
ESS cavity procurement via in-kind contributions
at STFC Daresbury laboratory
PLM, Document and Workflow Management
DESY Experiences on Use of Gas overlay during Assemblies
Status of deliverables 2008
for the FNAL/ANL, JLab, and Cornell cavity teams
Documentation (XFEL Naming convention, uploading…)
Fabrication of Nb and Cu SPL cavities and required tools CERN status
Definition of work flow for string DESY Example on critical operation
DESY experiences on education and training of cleanroom team
Test stand preparation and EMR "live" data summaries
ESS – RF checks up to cavity operation readiness in tunnel
RF-Dipole Cavity Update
Proton Source and LEBT Luigi Celona & Lorenzo Neri
XFEL cavities and cryomodules measurements at AMTF
Horizontal Tests in a Vertical Cryostat
BrightnESS – SE Hub (LASA)
Highlights from EU Global Design Effort
Retreatment of Superconducting Cavities for the European XFEL
SRF Frequency data flow (focus on elliptical)
An Optimal Procedure for RF Conditionning at the FREIA Laboratory
SPOKE Cavities frequency preparation plan and RF control procedures
Installation Binder / IRR – an example
Daresbury ESS In-Kind Contributions
Cryomodule ESS FAT & SAT SRF meetinG on 07/11/2017
Overall time schedule of SRF activities
Incoming inspection of the cavities at saclay
ESSI CHANGE AND nonconformity control SYSTEM
ESS High Beta Cavities Quality Assurance and Control - Learning and Planning Workshops, CEA Saclay, 30 June - 1 July 2016 Mark Pendleton STFC, Daresbury.
System tests at CEA O. Piquet 19/03/2019
STATUS of INFN contribution to ESS-accelerator
How Do We Define Acceptance of a Cryomodule? - A Discussion
CE compliance -LLRF- Anders Svensson, ESS
Paolo Michelato LASA - Status of cavity documentation, fabrication, inspection and NCRs Laura Monaco INFN – LASA 10° ESS SRF Collaboration Meeting, 25.
High level ESS SRF test plan
TOS Control – main idea and scheme
Presentation transcript:

A. Bignami on behalf of LASA SRF Group LASA The external QC: Status/Results on “real” cavities M001÷M002 / P05 & MBLG002 A. Bignami on behalf of LASA SRF Group 9th SRF Collaboration Meeting – ESS, November 6th-7th 2018

Main issues Status of documents flow for the series production: Subcomponents Al1÷Al3 Al4 Al5 Status of NCR flow: minor NCR major NCR The ESS_LASA_DMS for: document management data analysis

The acceptance levels: remind of main checks Cavity status Needed documents If Level reached Al1 Cavity after mechanical fabrication Mechanical, RF, vacuum, visual documents Proceed to Level Two Al2 Cavity before He-tank integration Mechanical, RF, vacuum, Treatment documents (bulk BCP, annealing) Proceed to Level Three Al3 He-tank integration, Final BCP and surface treatments, assembly of accessories for the cold RF test He-tank integration and pressure tests (mechanical, RF, vacuum, visual documents, transfer measurements), last surface treatments, final vacuum and RF checks, outgoing inspection Integrated cavity ready to be cold RF tested Al4 Cavity cold RF tested Documents of the cold RF test, incoming/outgoing checks Cavity can be sent to CEA for string assembly Al5 Cavity accepted for string assembly Documents with incoming inspection at CEA Cavity final approval

The acceptance levels: where we are... Cavity status Needed documents If Level reached Al1 READY (subcomponents + M001 + M002) Al2 UNDER WORKING (M001 + M002) Al3 STILL TO BE TESTED Al4 UNDER WORKING NOW (P05 + MBLG002) Al5

General overview: docs The external Quality Control: documents 3 acceptance levels for the production at the cavity producer (Al1-Al3): Flow of documents/data: Subcomponents for the 1st six series cavities Al1: for M001 (completed), M002 (in progress) Al2: for M001 & M002 (in progress) for each cavity: #71 docs for subcomponents (mech.+3D+RF) #7 docs for Al1 (cav comp. + mech. + RF + leak check + inner/outer visual insp. + Al1 fullfillment) #32 docs foreseen for Al2 #44 docs foreseen for Al3

General overview: docs Subcomponents INFN-EZ exchange of instruction Cavity

General overview: docs The external Quality Control: documents 1 acceptance level for the qualification (cold VT) (Al4): Definition of documents/data under finalization: Al4: P05 & MBLG002 used for test Many interaction between INFN/DESY for measurements definition and incoming/outgoing procedures Cold VT of MBLG002 (no tank) done in July Cold VT of P05 (with tank) in those days #6 docs foreseen for Al4 RF (before delivery to DESY) RF (at DESY)

General overview: docs The external Quality Control: documents 1 acceptance level for cavity handover to ESS at CEA (Al5): Definition of documents/data under finalization: Al5: documents to be provided are under test and will be debugged soon (use of P05 + MBLG002 + M001 + M002) List of possible documents (a collection from previous Als): Mechanical measurements of the dressed cavity (with Tank) Transfer measurements Pressure test + Leak Checks after He-Tank integration FF after He-tank integration Reference frequency of the cavity after Final BCP (horizontal, air, no brakets) Leak check and vacuum quality Incoming inspection at DESY/outgoing inspection at DESY VT results (cavity performance) RF spectrum (horizontal, in vacuum, before delivery to CEA) List of parts in circulation (to be sent to INFN) INFN Certificate of conformity (cavity production + cavity test) NCR relative to interfaces (if occurred)

2. NCR document issued by EZ 3. NCR document signed by INFN General overview: NCR The external Quality Control: NCR Minor NCR (no consequences on interfaces): Minor NCR occurred in subcomponents production fastly solved (RT system, etc.) and tracked: EZ-INFN fast communication for NCR solving (ticket system) EZ NCR document issuing INFN approval Managing System Quality Control EZ ESS_LASA_DMS INFN fast response; everything is tracked NCR 2. NCR document issued by EZ 1. RT tracking system 3. NCR document signed by INFN In the DMS system

2. NCR document issued by EZ 3. NCR document signed by INFN General overview: NCR The external Quality Control: NCR Minor NCR (no consequences on interfaces): Minor NCR occurred in subcomponents production fastly solved (RT system, etc.) and tracked: EZ-INFN fast communication for NCR solving (ticket system) EZ NCR document issuing INFN approval Managing System Quality Control EZ ESS_LASA_DMS INFN fast response; everything is tracked NCR 2. NCR document issued by EZ 1. RT tracking system 3. NCR document signed by INFN In the DMS system

General overview: NCR The external Quality Control: NCR EZ INFN ESS Major NCR (relative to interfaces): Major NCR occurred on 4 semifinished End Groups (EGC & EGP): EZ-INFN fast communication for NCR solving (ticket system) EZ NCR emission issuing EZ NCR delivered by INFN to ESS for approval/rejection INFN NCR approval/rejection to EZ (NCR signed by INFN and ESS) Managing System Quality Control EZ ESS LASA DMS INFN fast response; everything is tracked NCR 2. NCR doc. issued by EZ 1. RT tracking system 4. NCR doc. signed by ESS In the DMS system ESS (CEA) 3. NCR doc. sent to ESS 5. NCR signed by INFN/ESS

General overview: NCR The external Quality Control: NCR EZ INFN ESS Major NCR (relative to interfaces): Major NCR occurred on 4 semifinished End Groups (EGC & EGP): EZ-INFN fast communication for NCR solving (ticket system) EZ NCR emission issuing EZ NCR delivered by INFN to ESS for approval/rejection INFN NCR approval/rejection to EZ (NCR signed by INFN and ESS) Managing System Quality Control EZ ESS LASA DMS INFN fast response; everything is tracked NCR 2. NCR doc. issued by EZ 1. RT tracking system 4. NCR doc. signed by ESS In the DMS system ESS (CEA) 3. NCR doc. sent to ESS 5. NCR signed by INFN/ESS

General overview: ESS_LASA_DMS & DataBase The external Quality Control: ESS-LASA-DMS Fruitfull collaboration with Brightness team (LNS) Alfresco used for managing of documents: EZ InBox -> used for document loading -> OK (subcomponents/Al1) Documents automatically sent to INFN experts for analysis and approval/rejection cycle (all Als) -> OK (subcomponents), under construction for Als EZ OutBox -> used for official communication from INFN to EZ (DumbBell composition, trimming instruction, cavity composition) -> OK NCR cycle out from Alfresco (RT system) -> only stored once solved -> under construction Ancillaries and other info -> under construction DESY OutBox/DESY InBox -> used for loading: Al3 docs (needed by DESY) & Al4 docs (DESY measurements) -> under construction ESS OutBox -> used for loading: Al5 docs -> under construction ESS InBox -> used for ESS final acceptance tests and cavity handover -> under construction

General overview: ESS_LASA_DMS & DataBase The external Quality Control: ESS-LASA-DMS The ESS-INFN (LASA) Dashboard: Simple and fast overview of documents status (loading/document status -> accepted/rejected) -> OK (subcomponents), under construction for Al1÷Al5 levels Inner Dumbbell before trimming Still to be approved by INFN Approved by INFN Rejected IC Inner Cells The ESS-INFN (LASA) Dashboard

General overview: ESS_LASA_DMS & DataBase The external Quality Control: ESS-LASA-DMS The ESS Dashboard: Data extraction for fast analysis of key parameters (plots, statistics); useful tool for prompt feedback to Industry -> OK (subcomponents), under construction for Al1÷Al5 levels More implementation will come with the running production Iris diameters is increasing -> prompt feedback to EZ for recovery action!