A. Kaminskiy, CMS Tracker week , Apr 2004

Slides:



Advertisements
Similar presentations
TEC X5 Setup (1) 1 Front + 1 Back petal, fully equipped (28 modules F.P modules B.P. + AOH + DOHM) Petal assembly IPN-Lyon (F.P.), RWTH-Aachen I.
Advertisements

Status of test beam data analysis … with emphasis on resistive coating studies Progress and questions 1Meeting at CEA Saclay, 25 Jan 2010Jörg Wotschack,
Slide 1Module Testing Meeting March 7, 2003US Hybrid/Module/Rod Testing Model-Anthony Affolder US Hybrid/Module/Rod Testing Model Anthony Affolder (for.
Slide 1X-Calibration Common Testing Issues-Anthony AffolderModule Testing Meeting, June 3, 2003 X-Calibration Common Testing Issues: Grounding, Environmental.
1 CMS week 15/03/05, Module Production Meeting, Dean White - UCSB Status of Sensor Bias Connection Dean White For the US CMS Group.
Slide 1US silicon group meeting 5/6/2003 Hybrid Testing Status 10 new hybrids brought by Lenny all tested à 9 tested with no flaws à 1 had 1 chip + 1 wirebond.
1 Hybrid & Module Testing Status Week of 6/6-6/10.
CMS Tracker Week – Module Test Meeting – April 2003 – Patrick Gartung 1 Status of US long term module testing Patrick Gartung University of California,
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
CMS Tracker Week, CERN, Apr Apr 2004CMS Tracker Week - Module ProductionSalvatore Costa - Catania Module Production ___________ Report on.
DCS planning for ITS/SDD Vojtech Petracek Jiri Kral CTU Prague DCS workshop CERN.
Tracker Week, CERN, Oct Oct 2003Tracker Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting 21 Oct.
Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 1 Results from module testing E.Chabalina University of Illinois (Chicago)
Plan for 2009 CALICE beam test with ScECAL + AHCAL + TCMT Jan-28 th CALICE TB Satoru Uozumi (Kobe)
CMS Week, CERN, June June 2004CMS Week - TPOSalvatore Costa - Catania Repair Centers, from a Bonder’s point of view Reported by: Salvatore.
Idea for next data taking at FNAL Dec-14 th 2008 ScECAL S. Uozumi (Kobe)
Catania Production Center S.Albergo Universita’ & INFN Catania.
Tracker Week, CERN, Feb Feb 2004Tracker Week - Module ProductionSalvatore Costa - Catania Report on Module Bonding Salvatore Costa Università.
Assembly and Test of the Spectrometer (H.P. Apr. 16,1998) Status Module Assembly and Tests 1.) Status of completed hybrids and module 2.) Summary of the.
Tracker Week, CERN, Oct Oct 2003Tracker Week - Bonding WGSalvatore Costa - Catania Which strips should the Bonders skip because of known.
LKr status R. Fantechi.
LAV front-end and readout status
UCSB Hybrid Bonding & Testing
UCSB Testing Status Anthony Affolder
Hybrid & Module Testing Status
Hamburg Bonding Report
Results from module testing
A. Kaminskiy, CMS Tracker week , Apr 2004
Unexpected Failures of Modules on Rods
Overview Time structure of leakage currents
UCSB Testing Status Anthony Affolder
RPC HV&LV status Introduction HV power supply tender
Module Failures on RODs
FNAL Module Testing Status
Module Production Status in Florence
CMS Perugia Modules Production Review
First Assembled Rod in US
STAR TOF MRPC Mass Production & Q.C. (USTC)
Module production in Italy
Bari production centre resp. M. de Palma
Hybrid Testing Status 10 new hybrids brought by Lenny all tested
FNAL Module Testing Status
Hybrid & Module Electrical Testing
Module Production in Brussels
CMS Perugia Gantry Status Report
US Hybrid/Module/Rod Testing Model
Module Testing at UCSB: Simulated Production 11-04
Anthony Affolder UC Santa Barbara
Module Testing in Florence Carlo Civinini INFN-Florence
Module Testing Status Week of 6/14-6/20.
US Module Testing Progress Report
TOB Module Production Overview and Plan
Hybrid & Module Testing Status
Recent TOB Developments
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Recent TOB Developments
Module Testing Status Week of 3/14-3/18.
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
US Module Testing Progress Report
Operations/Failure Analysis
US Rod Burn-in Readiness DAQ Hardware/Power Supplies
Status of Bonding R1N, R1S, R3 of TEC University of Hamburg
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hardware needs (ARCS) Current ARCS capabilities at both sites should be able to keep up with production assuming software changes Automatic I-V curves,
Presentation transcript:

A. Kaminskiy, CMS Tracker week , Apr 2004 Current status 110 modules received from Gantry center (Perugia) 66 L34 and 48 L12 Phi sirad.pd.infn.it/CMS/modprod 2 ARC setups ARC+DEPP+LED for module qualification ARC+DEP for arrival test LT setup CAEN 1527crate, 12chn HV board with 2na current resolution UPS, Torino interlock board, dry air Independent HV and Temperature/Humidity monitoring, sirad.pd.infn.it/CMS/modtest/logs A. Kaminskiy, CMS Tracker week , Apr 2004

A. Kaminskiy, CMS Tracker week , Apr 2004 L34 modules (4 chips) Received 66 Bonded and ARC tested 65 64 good modules 1 module goes to breakdown (some lithographic defect which almost shorts BiasBing with GuardRing). 1 module is unbondable (PA pads are contaminated) 2 Modules draw ~2uA, but without CM noise LT tested modules: 40 All LT tests before ~1st of March are cancelled No module related “surprises” from LT test Few modules has some defects on the surface caused by the peak-up tool. A. Kaminskiy, CMS Tracker week , Apr 2004

A. Kaminskiy, CMS Tracker week , Apr 2004 Mod#33162(L34) Chan# Peak Off Peak On Dec Off Dec On 9 ???? ????2 NOIS NOIS 276 SHT+ SHT+ SHT+ SHT+ 277 SHT+ SHT+ SHT+ SHT+ 278 ???? ???? ???? PHL- 279 ???? ???? ???? ???? 280 SHT+ SHT+ SHT+ SHT+ 281 SHT+ SHT+ SHT+ SHT+ 385 NOIS NOIS A. Kaminskiy, CMS Tracker week , Apr 2004

A. Kaminskiy, CMS Tracker week , Apr 2004 L12 modules (6chips) L12Modules Received 48 Completely bonded and ARC tested 28 LT tested 6 IV problems: 2 modules 1 module have avalanche breakdown at 380V-420V 1 module drew 10uA at 30V, but it improved after conditioning, now it draws 4uA @400V Several modules with “Resistive” IV Several modules with “unexpected” pinholes Strange modules with “soft pinholes” A. Kaminskiy, CMS Tracker week , Apr 2004

A. Kaminskiy, CMS Tracker week , Apr 2004 Mod#33236 (6chips) Chan# Peak Off Peak On Dec Off Dec On 415 ???? ???? ???? ???? 416 NOIS NOIS 421 NOIS NOIS A. Kaminskiy, CMS Tracker week , Apr 2004

A. Kaminskiy, CMS Tracker week , Apr 2004 LT test : noise jumping In consecutive measurements the noise of coupled chips jumps up and down A. Kaminskiy, CMS Tracker week , Apr 2004

A. Kaminskiy, CMS Tracker week , Apr 2004 Conclusions About 100 modules are bonded/tested. Planned production rate (20 modules/week) has never been achieved. Since 15 Jan we produce 8-10 modules per week Microbonding is not very time consuming But it was at very beginning, while we did many intermediate tests 2 ARC systems are enough 1 ARC frontend board was broken. It took 3 days to substitute it, thanks to Aachen people. LT test seems to be a bottleneck, if we continue to test 72h/6modules . A. Kaminskiy, CMS Tracker week , Apr 2004

A. Kaminskiy, CMS Tracker week , Apr 2004 P.S. Online root browser Open http://sirad.pd.infn.it/CMS/modprod/cms_prod.php Click on module ID Click on button on the right of the root file Follow the links A. Kaminskiy, CMS Tracker week , Apr 2004