Mod_03_18 Autoproducer Credit Cover

Slides:



Advertisements
Similar presentations
Background T&SC V9.0: The Market Operator shall not grant the status of Under Test for the purposes of this Code to Autonomous Generator Units, Pumped.
Advertisements

The information in this presentation has been collated by ELEXON and while all due care has been taken to ensure the accuracy of this information, ELEXON.
Overview of Make Whole Payments Modifications Committee Meeting February 2015.
1 Wal-Mart’s View on Demand Response Program Design Anoush Farhangi Angela Beehler.
Mod_03_12 Alignment of TSC with Revised VAT Arrangements 29 th May 2012.
TPTF Presentation Registration of PUN Facilities December 19, 2007.
Power Exchanges in the extended EU The experience in Czech Republic APEx Conference 2004 October 11 th, Leipzig Miroslav Marvan Operator trhu s.
Metering Modification to T&S code Cathal Kearney Protection & Metering 15/04/2015.
Modification Proposal Mod_11_12 Gaelectric Energy Storage Presentation to Modifications Committee 29/05/2012.
Mod 10_11 Interconnector Under Test Mod 14_11 Pumped Storage Under Test Tuesday, 5 th April 2011.
SEM – One Year On Liam Ryan, Market Operations Manager.
Market Participant Experiences with Demand Side Bidding and Future Direction Linda Roberts, EA Technology Richard Formby, EA Technology.
Impact of Increasing Meter Errors on the SEM Modifications Committee Meeting 65 3 rd December 2015.
Metering Modification to T&S code Cathal Kearney Protection & Metering 03/12/2015.
Linnfall Consulting Market design: the energy-only market model Linnfall Consulting September 2015.
Juliet Corbett, NIAUR. Regulatory Structure  Ireland  CER  Licenses Generators Suppliers ESBCS ESBPG ESB Networks Eirgrid Transmission License Eirgrid.
Metering Identifiers and Aggregation Rules 30 March 2016 EMR Settlement Limited EMR Metering in the Capacity Market Public.
Day Ahead Market QSE’s Credit Requirements Concerns and Solutions August 14, 2008.
Fuel Cost Components in the Fuel Adder
Causer Pays Workshop 20 March 2017.
Fuel Cost Components in the Fuel Adder
Retail Market Assurance Services for the Irish Electricity Market
Fuel Cost Components in the Fuel Adder
France, UK, Ireland Regional Initiative SONI Commercial Manager
Demand forecast and network balancing
NPRR829 Incorporate Real-Time Telemetered Net Generation for Non-Modeled Generation into the Real-Time Liability Estimate ERCOT PRS Meeting May 11, 2017.
Chapter 2 Mechanics of Futures Markets
Development of an Integrated Energy Market in Saudi Arabia
Energy Storage Settlements Consistent with PUCT Project & NPRR461
Electricity Wholesale Markets: Designs for a low-carbon future
MOD_04_17 Solar in the SEM 9th June 2017.
ESB Networks AIP Programme
Outline Energy demand and prices Reserves and new sources of energy supply.
CPDe Event The Changing Value in Flexibility 19th April 2018.
Recovery of Costs due to Invalid Ex-Ante Contracted Quantities in Imbalance Settlement 12th December 2017.
City Council April 30, 2018 Item 13
Unsecured Bad Energy Debt and Unsecured Bad Capacity Debt Version 2
Agreed Procedure Updates
Correction of Minor Material Drafting Errors
Contract Refusal Contract Refusal is a process associated with participant’s ex-ante trading behaviour; It relates to how the Traded Not Delivered element.
Part B Unsecured Bad Energy Debt and Unsecured Bad Capacity Debt
MOD_19_18 Part B Housekeeping 1 21st June 2018.
Review of the requirements regarding Unsecured Bad Debt within I-SEM
Update to Unit Under Test Process
MOD_09_18 Interim Credit Treatment for Participants with Trading Site Supplier Units 13th March 2018.
MOD_21_18 Application of Settlement Reallocation Agreements to Market Operator Charges and Settlement Document Definition and Usage 21st June 2018.
Chapter 18: Non-Firm Quantities
Demand Side Units in the SEM
Mod_25_18 Unsecured Bad Energy Debt and Unsecured Bad Capacity Debt
Paragraph 14 Table 2: Mod_15_18 – IP/QBOA
Interim Suspension Delay Periods
Mod_34_18 Removal of Make-Whole Payments for biased quantities and negative imbalance revenue, and small clarifications to determination of Start Up Costs.
Imbalance Price Modifications
Mod_38_18 Limitation of Capacity Market Difference Payments to Loss Adjusted Metered Quantity. 12th December 2018.
CMC_04_19 Finalisation of Exchange Rate in Auction Information Pack
Credit Cover Signage and Subscript Correction
Mod_37_18 Housekeeping 12th December 2018.
Determining Marginal Energy Action Prices Modification Proposal
Summary Issue Modification Aim Effect of the mod Impacts
Use of Technical Offer Data in Instruction Profiling / QBOA Version 2
Mod_21_18v2 Application of Settlement Reallocation Agreements to Market Operator Charges 16th August 2018.
MOD_03_19 Amended application of the Market Back Up Price if an Imbalance Price(s) fail to calculate Energia.
Imbalance Price Modifications
Determining Marginal Energy Action Prices Modification Proposal
Recovery of Costs due to Invalid Ex-Ante Contracted Quantities in Imbalance Settlement 25th January 2018.
Mod 09_19 - Removal of locational constraints from Imbalance Pricing
Long Term Consumption Adjustments
Energy Supply Business Model enabled by the Clean Energy Package
Mod_10_19 Removal of Negative QBOAs Related to Dispatchable Priority Dispatch Units from the Imbalance Price 27th June 2019.
Captured Carbon Renewable Energy Route to Market Consultancy Trading.
Presentation transcript:

Mod_03_18 Autoproducer Credit Cover New section G.14.17.1 To calculate the Billing Period Cashflow for an Autoproducer as follows 𝐶𝑈𝐵 𝑝𝑔𝜔 = 𝑑 𝑖𝑛 𝜔 𝑢 𝑖𝑛 𝑝 𝐶𝐷𝐴𝑌 𝑢𝑑 + 𝛺 𝑖𝑛 𝑝 𝐶𝐷𝐴𝑌 𝛺𝑑 + v 𝑖𝑛 𝑝 𝐶𝐷𝐴𝑌 v𝑑  

Autoproducers Credit Calculation AUGHINISH Alumina Ltd Jan 2018

Aughinish historic delivery

Aughinish historic delivery Freq Distribution over 10 years 99.6% availability in 2017 Consumption <10MW 2nd Tuesday in May Delivery at 110MW Or Delivery at 35MW

Aughinish historic delivery Physical units SK3 80MW SK4 80MW In-house 45MW MEC 130MW & MIC 45MW Station gate Delivery 115MW This is what we do This is what an Autoproducer is intended to represent in the TSC Part A, B & C

ISEM Strategy

ISEM Strategy Steam needed for Alumina plant Trading strategy 100% DAM 100% Balance Responsible Minimal constraints Priority dispatch I-SEM Allows volume to follow market signals

Autoproducer Problem

Autoproducer Problem Structure in the I-SEM TSC Part B Party PY_000024 Aughinish Alumina ltd Participant PT_400024 TS_400031 (Trading Site Account) TU_400001 Trading Unit SK3 GU_400120 PPTG SK4 GU_400121 TSSU SU_400030 Netting Generator Unit Removed Q imb -115MW +80MW +80MW -45MW

Autoproducer Problem Physical units SK3 80MW SK4 80MW In-house 45MW Station gate Delivery 115MW and QExAnte = 115MW Balancing Market Units In-house 45MW SK4 80MW SK3 80MW QM NGU TSSU - 45MW This is what we do This is what an Autoproducer is intended to represent in the TSC Part A, B & C TU Virtual QM SK4 80MW QM SK3 80MW QM TU =0 MW but QExAnte = 115MW

Autoproducer Problem Physical units 115MW Generator Qimb = +0MW Balancing Market Units This is what we do This is what an Autoproducer is intended to represent in the TSC Part A, B & C 115MW Autoproducer Qimb = +160MW and -160MW

Implication

One Interpretation of Credit Requirement Implication One Interpretation of Credit Requirement 100% DAM 100% Balance Responsible

Implication Autoproducer Excess Collateral (100% balance responsible) €800,000

The I-SEM Solution

The I-SEM Solution GU Cashflow CMU Cashflow SU Cashflow For all Units Registered to an Autoproducer Site In Settlement Day, d For all d in Sample Undefined Exposure Period, ω The I-SEM Solution New section G.14.17.1 To calculate the Billing Period Cashflow for an Autoproducer as follows 𝐶𝑈𝐵 𝑝𝑔𝜔 = 𝑑 𝑖𝑛 𝜔 𝑢 𝑖𝑛 𝑝 𝐶𝐷𝐴𝑌 𝑢𝑑 + 𝛺 𝑖𝑛 𝑝 𝐶𝐷𝐴𝑌 𝛺𝑑 + v 𝑖𝑛 𝑝 𝐶𝐷𝐴𝑌 v𝑑   New section G.14.17.4 can be positive or negative If CUBMpg => 0 then: 𝐸𝑈𝑃𝐸𝐴𝑆 𝑝𝑔 = 𝐶𝑈𝐵𝑀 𝑝𝑔 +𝐴𝑛𝑃𝑃 𝐶𝑈𝐵𝑆𝐷 𝑝𝑔 If CUBMpg < 0 then: 𝐸𝑈𝑃𝐸𝐴𝑆 𝑝𝑔 = 𝐶𝑈𝐵𝑀 𝑝𝑔 −𝐴𝑛𝑃𝑃 𝐶𝑈𝐵𝑆𝐷 𝑝𝑔

Justification

Justification Changes only affect Trading Site with a contiguous Autoproducer Provides for equal treatment for all participants Over collateralisation (by one participant) Bar DAM trading Spill into BM Counter intuitive trading Reduce liquidity in DAM Would jeopardies the 700 jobs on site in West Limerick. The alternative price of steam would be uncompetitive in a global alumina market. Increased carbon emissions Discourages further investment in High Efficiency CHP

Conclusion

Conclusion This is a correction of the code it aligns credit Calc with settlement of an Autoproducer Autoproducers ExAnte trades (Trading Unit) are matched from their physical units. Qimb = +160MW and -160MW Any participant should only be exposed to their imbalance position Must be implemented for go-live

Questions New section G.14.17.1 To calculate the Billing Period Cashflow for an Autoproducer as follows 𝐶𝑈𝐵 𝑝𝑔𝜔 = 𝑑 𝑖𝑛 𝜔 𝑢 𝑖𝑛 𝑝 𝐶𝐷𝐴𝑌 𝑢𝑑 + 𝛺 𝑖𝑛 𝑝 𝐶𝐷𝐴𝑌 𝛺𝑑 + v 𝑖𝑛 𝑝 𝐶𝐷𝐴𝑌 v𝑑  

End

∑ of the Red line = maybe € 800,000 𝑡𝑜 𝑎 𝑚𝑢𝑙𝑡𝑖𝑝𝑙𝑒 Implication D+7 Today D=0 Today D+17 ∑ of the Red line = maybe € 800,000 𝑡𝑜 𝑎 𝑚𝑢𝑙𝑡𝑖𝑝𝑙𝑒

Definitions Trading Site Supplier Unit means a Supplier Unit that contains only the Demand within a Trading Site, and is settled on a net basis against the Generator Units on that Trading Site under the rules specified in the Code. Trading Site means one or more Generator Units and at most one Trading Site Supplier Unit of which, …… all Generator Units are covered by a single Connection Agreement, or ………all such Units are located on a Contiguous Site….. Autoproducer Site Unless not dispatchable…..must have separate metering for its import energy and export energy… A party must register Generation Units and Supplier Units separately for the purpose of a Trading Site

Aughinish historic delivery

Aughinish historic delivery 99.6% Reliability