Emittance Diagnostics

Slides:



Advertisements
Similar presentations
Summary of the discussion for the commissioning session 2 nd ATF2 Project Meeting KEK, Tsukuba, Japan 6/ 1/ 2006 T.Okugi (KEK)
Advertisements

Coupling Correction in ATF2 EXT 7 th ATF2 Project Meeting, december 2008 C.Rimbault, LAL Orsay.
Emittance Measurement Simulations in the ATF Extraction Line Anthony Scarfe The Cockcroft Institute.
P. Emma, SLACLCLS Commissioning – Sep. 22, 2004 Linac Commissioning P. Emma LCLS Commissioning Workshop, SLAC Sep , 2004 LCLS.
12th January 2006Cockcroft, Liverpool/Daresbury1 ATF, ATF2 and a Beam Diagnostics Section for the ILC ATF, ATF2 and a Beam Diagnostics Section for the.
ATF2 FB/FF layout Javier Resta Lopez (JAI, Oxford University) for the FONT project group FONT meeting January 11, 2007.
P. Emma, SLACLCLS FAC Meeting - April 29, 2004 Linac Physics, Diagnostics, and Commissioning Strategy P. Emma LCLS FAC Meeting April 29, 2004 LCLS.
Mon 03 July 06Laserwire Mini-Workshop1 Using Laserwires to Measure Emittance at the ILC Leo Jenner, Daresbury Labs.
Optics for Skew Correction and Emittance Measurement Leo Jenner This talk is going to look familiar if you were at the recent LC-ABD meeting in Manchester…
Beam Delivery System Review of RDR(draft) 1.Overview 2.Beam parameters 3.System description 3.1 diagnostic, tune-up dump, machine protection MPS.
Status of very high priority beam tuning software Special ATF2 project meeting, Korea, 1 st October 2008 Cécile Rimbault, on behalf of High Priority task.
Alignment and Beam Stability
ATF2 Javier Resta Lopez (JAI, Oxford University) for the FONT project group 5th ATF2 project meeting, KEK December 19-21, 2007.
Kicker Optics – or – Selected ATF-II EXT Line Performance Issues ATF-II Technical Review, April M. Woodley1/40.
Relative Error on Parameter Pessimistic Estimate Optimistic Estimate β function at the LW 3% 1% LW readout error 2% 1% Laser spot waist 10% Laser Pointing.
ATF2 optics … 1 3 rd Mini-Workshop on Nano Project at ATF ATF2 optics, tuning method and tolerances of initial alignment, magnets, power supplies etc.
March 7, 2007 LET Issues (Cai/Kubo/Zisman) Global Design Effort 1 Low-Emittance Tuning Issues and Plans Yunhai Cai, Kiyoshi Kubo and Michael S. Zisman.
October 31, BDS Group1 ILC Beam Delivery System “Hybrid” Layout 2006e Release Preliminary M. Woodley.
January 10, 2007M. Woodley (SLAC)1 ILC Beam Delivery System “Interim Working Assumption” 2006e Release European LC Workshop, January , Daresbury.
Y. Ohnishi / KEK KEKB LER for ILC Damping Ring Study Lattice simulation of lattice errors and optics corrections. November 1, 2007 Y. Ohnishi / KEK.
Matching recipe and tracking for the final focus T. Asaka †, J. Resta López ‡ and F. Zimmermann † CERN, Geneve / SPring-8, Japan ‡ CERN, Geneve / University.
Fifth ATF2 Project Meeting, dec. 2007, KEK, Japan Emittance measurements with multiple wire-scanners and quadrupole scans in ATF EXT C. Rimbault,
Mark Woodley, SLACATF2 Software Review (June 18, 2008)1 ATF2 Layout/Optics (v4.0) nBPM (SLAC) nBPM (KEK) FONT Compton / laserwire ODR Existing ATF Extraction.
Mark Woodley, SLACATF2 Project March 20-21, Summary of Tuning, Corrections, and Commissioning.
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
July 19-22, 2006, Vancouver KIRTI RANJAN1 ILC Curved Linac Simulation Kirti Ranjan, Francois Ostiguy, Nikolay Solyak Fermilab + Peter Tenenbaum (PT) SLAC.
Low emittance tuning in ATF Damping Ring - Experience and plan Sendai GDE Meeting Kiyoshi Kubo.
Vertical Emittance Tuning at the Australian Synchrotron Light Source Rohan Dowd Presented by Eugene Tan.
Mark Woodley, SLAC5th ATF2 Project Meeting (December 19, 2007)1 ATF2 Layout/Optics (v3.8) nBPM (SLAC) nBPM (KEK) FONT Compton / laserwire ODR Existing.
Mark Woodley, SLAC6th ATF2 Project Meeting (May 27, 2008)1 ATF2 Layout/Optics (v4.0) nBPM (SLAC) nBPM (KEK) FONT Compton / laserwire ODR Existing ATF Extraction.
J. Brossard, C. Rimbault a P. Bambade LAL / / 8-9 nov LAL 1 Exercising emittance measurements in the ATF EXT line Upgrade.
Design options for emittance measurement systems for the CLIC RTML R Apsimon.
Mark Woodley, SLACATF2 Project March 20-21, Next version of MAD decks (v3.7): what needs to be added/deleted?
Kiyoshi Kubo Electron beam in undulators of e+ source - Emittance and orbit angle with quad misalignment and corrections - Effect of beam pipe.
Task Lists of ATF2 commissioning Toshiyuki Okugi ATF2 Project Meeting 12 / 17 / 2008.
Emittance measurements with multiple wire-scanners and quadrupole scans in ATF EXT C. Rimbault, Brossard, P. Bambade (LAL) Main goal : - Try to improve.
Summary of Tuning, Corrections, and Commissioning ( Short summary of ATF2 meeting at SLAC in March 2007 ) and Hardware Issues for beam Tuning Toshiyuki.
May 31, 2005Mike Hildreth – ATF 2005 Energy Spectrometry and ATF Components of the nano-BPM Test Program and Plans for Future Tests Mike Hildreth University.
ATF2 Software Review LAL June 2008 Philip Bambade & Glen White ATF2 weekly meeting June
DRAFT: What have been done and what to do in ILC-LET beam dynamics Beam dynamics/Simulations Group Beijing.
Simulation of the α, dispersion, coupling and β multiknobs in large β optics Sha Bai, Philip Bambade, Benoit Bolzon, Javier Resta Lopez
Status of EXT coupling measurement analysis 9 th ATF2 project meeting C.Rimbault (LAL) S. Kuroda, T. Tauchi, N. Terunuma (KEK), G. White, M. Woodley (SLAC)
2nd ATF2 Project Meeting (May 30, 2006)M. Woodley [SLAC]1 ATF2 Layout/Optics (v3.3) nBPM (SLAC) nBPM (KEK) FONT Compton / laserwire ODR Existing ATF Extraction.
4 th ATF2 Project Meeting, 31 May 2007 A. Seryi 1 Summary of SLAC simulation study of emittance growth in the ATF extraction line SLAC team: J. Amann,
Hardwares for commissioning 2 nd ATF2 Project Meeting KEK, Tsukuba, Japan 5/ 31/ 2006 T.Okugi (KEK)
Simulation for Lower emittance in ATF Damping Ring Kiyoshi Kubo Similar talk in DR WS in Frascati, May 2007 Most simulations were done several.
First evaluation of Dynamic Aperture at injection for FCC-hh
ILC BDS Alignment, Tuning and Feedback Studies
Emittance Diagnostics
Orthogonal Correctors in ILC Main Linac
LCLS2sc MAD files: Injector to Bypass Line
EXT Tuning 13th ATF2 Project Meeting, January M. Woodley.
RTML and Main Linac Design (2.6.1 and 2.7.1)
ILC BDS Emittance Diagnostics: Design and Requirements
Beam Optics Set-Up at SLAC End Station A
3rd ATF2 Project Meeting, December 18-20, 2006
Emittance Diagnostics
CNGS Proton beam line: news since NBI2002 OUTLINE 1. Overview
Linac/BC1 Commissioning P
ATF2 Layout/Optics (v3.6) Existing ATF Extraction Line
Simulation of the FCC-ee lattice with quadrupole and sextupole misalignments Sergey Sinyatkin.
High Level Physics Applications for LCLS Commissioning
IR Lattice with Detector Solenoid
Linac Physics, Diagnostics, and Commissioning Strategy P
Y. Nosochkov and M. Woodley (SLAC)
Progress on Non-linear Beam Dynamic Study
Fanglei Lin MEIC R&D Meeting, JLab, July 16, 2015
JLEIC Electron Ring Nonlinear Dynamics Work Plan
ILC Beam Switchyard: Issues and Plans
Fanglei Lin JLEIC R&D Meeting, August 4, 2016
Presentation transcript:

Emittance Diagnostics Extended Coupling Correction and Emittance Diagnostic Section for “optimal” ATF2 Coupling Correction / Emittance Diagnostics FONT nBPM (KEK) nBPM (SLAC) Compton / laserwire Existing ATF Extraction Line ODR June 7, 2005 ILC BDS Meeting

June 7, 2005 ILC BDS Meeting

FF Optics Modifications From Tauchi-san’s email ([bds 117] June 2, 2005): 5. Optics modifications: (1) concentrate on "optimal" design (straight) … done (2) change bends from sector bends to rectangular … done (3) use 0.8 m bends (as used in ATF) instead of 1 m for better field stability and more space … done (4) remove octupoles (do not use them, and they are tight) … done (OC0 removed; OC1 moved away from SF1) (5) extend diagnostics section (use up to ~10 m additional space) … done (6) QM14 is the strongest quad, and is close to max field of BT quads, need to check if its strength can be reduced by reoptimizing the matching section … done (QM14[K1L] = -1.1 m-1) June 7, 2005 ILC BDS Meeting

β*x,y = 4,0.1 mm ΔL = 7.1 m (w.r.t. baseline) 30 cm offset June 7, 2005 ILC BDS Meeting

Assembly Hall optimal baseline June 7, 2005 ILC BDS Meeting

-1% +1% June 7, 2005 ILC BDS Meeting

Coupling Correction ideally correction section with 4 independent skew quadrupoles, followed by 2D (4 wire scanner) emittance measurement section optics for orthogonal control of the 4 coupling phases minimize εy once with each skew quadrupole in present ATF extraction line non-optimal optics in EXT straight section wire scanners and skew quads interspersed each wire scanner has x, y, and “u/v” (small angle, ~10°) wires one attempt at full 4D beam matrix measurement and correction was inconclusive1 1 See http://atfweb.kek.jp/atf/Reports/ATF-99-01.pdf June 7, 2005 ILC BDS Meeting

“Ideal” skew correction / ε diagnostic section SQ SQ SQ SQ WS WS WS WS – x – y 90° 180° 90° 90° 45° 45° 45° See http://www.slac.stanford.edu/cgi-wrap/getdoc/slac-pub-8581.pdf June 7, 2005 ILC BDS Meeting

SQ SQ SQ SQ 2.0 2.0 2.0 2.0 2.0 2.0 2.0 1.3 1.3 1.3 1.3 2.0 2.0 WS WS WS WS WS – x – y 90° 180° 90° 90° 33° 57° 57° 33° 33° 57° 57° 33° σ (μm) 59.2 10.8 108.0 5.9 59.2 10.8 108.0 5.9 59.2 10.8 For MAD files see http://www.slac.stanford.edu/~mdw/ATF2/optimal June 7, 2005 ILC BDS Meeting

new quadrupole (between QF3X and BH1X.3) June 7, 2005 ILC BDS Meeting

A ‘Drift’ e-Diagnostic Section from Paul Emma … b s L w1 w2 w3 3 wire scanners (or profile monitors) June 7, 2005 ILC BDS Meeting

– x – y σmin = 3 μm June 7, 2005 ILC BDS Meeting

Continuing Work optimize system bandwidth and performance add BPMs and dipole correctors simulate steering and dispersion/coupling correction with machine/diagnostic errors verify what space is needed for diagnostic equipment in chicane investigate drift ε–diagnostic section writeup for ATF2 proposal document June 7, 2005 ILC BDS Meeting