Thermal Environment & Mechanical Support

Slides:



Advertisements
Similar presentations
Field measurements of QEA magnets at KEK Mika Masuzawa May 30, 2006.
Advertisements

Electron Beam Control and Alignment LCLS FEL Undulator Commissioning Workshop UCLA Jan , 2004 P. Emma, SLAC Undulator collimation and protection.
Beam-Based Alignment with New Parameters Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator.
Experience Report with the Alignment Diagnostic System Georg Gassner September 17 th 2010.
J. Welch 4/7/05 Facility Advisory Committee Meeting Physics Issues for Conventional Facilities Review and Update 4/7/05 J. Welch.
October 12, 2006 Heinz-Dieter Nuhn, SLAC / LCLS Undulator Good Field Region and Tuning Strategy 1 Undulator Good Field Region and.
Marion M. White Undulator System 07 April 2005 LCLSLCLSLCLSLCLS Undulator System Tests Marion M. White ANL-ASD-LCLS.
Undulator Alignment Strategy – April 20, 2006 Heinz-Dieter Nuhn, SLAC / LCLS FAC 1 Undulator Alignment Strategy Heinz-Dieter Nuhn,
LCLS Undulators October 14, 2004 Heinz-Dieter Nuhn, SLAC / SSRL MMF Review Introduction to the LCLS Undulators Heinz-Dieter Nuhn,
Isaac Vasserman Magnetic Measurements and Tuning 10/14/ I. Vasserman LCLS Magnetic Measurements and Tuning.
X-Ray Diagnostics for the LCLS Jan , 2004 UCLA.
Wire Position System LCLS Undulator Alignment and Motion Review, Oct. 22, Franz Peters Wire Position System The Undulator.
J. Welch 10/12/04 Facility Advisory Committee Meeting Physics Issues for Conventional Facilities Review and Update 10/12/04 J.
Pine, Bldg 48, Room 232 J. 4/29/04 Physics Requirements for Conventional Facilities Thermal, Settlement, and Vibration Issues.
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Alignment.
Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 1 Installation Alignment,
BBA Related Issues Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center Undulator.
Robert Ruland MMF Introduction, Schedule, Budget October 14, 2004 MMF Review 1 MMF Introduction, Schedule, Budget Robert Ruland.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Physics.
Robert Ruland Intra Girder Assembly and Alignment - October 20, 2005 Internal LCLS Undulator Alignment and Motion Review 1 Intra.
J. Welch Talk MMF 10/14/04 LCLS Magnetic Measurement Facility Requirements Functional Temperature Vibration Earth's.
Zachary Wolf LCLS Undulator October 30, LCLS Undulator Tuning And Fiducialization Zack Wolf, Yurii Levashov, Achim.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Zachary Wolf Undulator Oct 12, LCLS Undulator Tuning Zack Wolf, Yurii Levashov, Achim Weidemann, Seva Kaplounenko,
Alignment and Beam Stability
Franz Peters, Georg Gassner WPM/HLS Status and June 17 th, WPM & HLS Status and Schedule Franz Peters, Georg Gassner.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
Technical Challenges and Concerns S. Sharma and R. Alforque, R. Beuman, C. Foerster, E. Haas, E. Hu, P. Montanez, P. Mortazavi, S. Pjerov, J. Skaritka,
Orbit Control For Diamond Light Source Ian Martin Joint Accelerator Workshop Rutherford Appleton Laboratory28 th -29 th April 2004.
Permanent Magnet Quadrupoles for the CLIC Drive Beam Jim Clarke, Norbert Collomb, Neil Marks, James Richmond, and Ben Shepherd STFC Daresbury Laboratory,
ASTeC Report for CLIC-UK Jim Clarke on behalf of all ASTeC & Technology Department staff contributing to CLIC-UK STFC Daresbury Laboratory, UK CERN-UK.
ERHIC: an Efficient Multi-Pass ERL based on FFAG Return Arcs June 9, 2015Stephen Brooks, ERL On behalf of the eRHIC design team.
1/13 Tatsuya KUME Mechanical Engineering Center, High Energy Accelerator Research Organization (KEK) ATF2-IN2P3-KEK kick-off meeting (Oct. 9, 2006) Mount.
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
Magnetic Field Stability Measurements Joe DiMarco 23Oct07.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
ENGINEERING MATERIALS Haseeb Ullah Khan Jatoi Department of Chemical Engineering UET Lahore.
Catherine LeCocq, SLAC Alignment Plan for the LCLS Undulator IWAA 2006,1 Alignment Plan for the LCLS Undulator Catherine.
1 BROOKHAVEN SCIENCE ASSOCIATES Beam Stability Overview NSLS-II CFAC Meeting May 8, 2007 S. Krinsky.
BRAINSTORMING ON LASER BASED SOLUTIONS FOR CLIC PRE-ALIGNMENT INTRODUCTION Hélène MAINAUD DURAND, BE/ABP/SU, 09/02/2010 Status of the study CLIC pre-alignment.
Summary of Presentation 1. Tolerances i. Vertical tolerances on BPMs (rf-BPM: ± 0.2μm, user BPMs: ±0.1μm, and X-BPMs: ± 0.1μm) ii. Tolerances on magnets’
Two-beam module layout
Magnetic Measurements At SLAC
Tutorial On Fiducialization Of Accelerator Magnets And Undulators
Orbit Control For Diamond Light Source
For Discussion Possible Beam Dynamics Issues in ILC downstream of Damping Ring LCWS2015 K. Kubo.
Magnetic Measurements For The LCLS Undulator System
Undulator Tolerances for LCLS-II using SCUs
SCU Next Phase Meeting July 8, 2014.
Phase Adjustments: K vs
Beam-Based Alignment Results
Undulator Line Design Liz Moog, Advanced Photon Source April 24, 2002
Undulator Cost & Schedule Patric Den Hartog, ANL April 24, 2002
Undulator Tuning Status Heinz-Dieter Nuhn, SLAC / LCLS for Zack Wolf, Yurii Levashov, Achim Weidemann, Seva Kaplounenko, Scott Jansson, Ralph Colon, Dave.
Physics Requirements for Conventional Facilities
LCLS Undulator System Status and Schedule
Motivation Technique Simulations LCLS LCLS DOE Review, April 24, 2002
Heinz-Dieter Nuhn – LCLS Undulator Group Leader May 14, 2009
LCLS Undulator System Status and Schedule
LCLS Undulator Tuning And Fiducialization
Undulator Integration Test Status
Fixed Support Design & Testing
Final Break Length Choice AC Conductivity Wakefields
Physics Requirements for Conventional Facilities
Undulator Alignment Plan
Alignment Diagnostic System Status
Breakout Session SC3 – Undulator
Physics Update P. Emma FAC Meeting October 27, 2005 LCLS.
Physics Requirements for Conventional Facilities
Presentation transcript:

Thermal Environment & Mechanical Support Phase and Trajectory Tolerances Foundation Considerations Thermal Distortions Support Design Undulator System Review March 3-4, 2004 J. Welch, SLAC

Phase error tolerance implications 2 micron rms trajectory tolerance (perfect undulator) Segment to segment strength variation of 1.5 x 10-4 Temperature coefficient of NdFeB is 0.1%/C Undulator compensation via Ti/Al assembly) magnet temperature tolerance ~ +-0.2 C Vertical undulator alignment 50 mm causes 10 degrees of additional slippage 2 mm deviation from straight over 10 m is about the average curvature of the Earth’s surface Undulator System Review March 3-4, 2004 J. Welch, SLAC

Path Length Increases due to Bumps LCLS: A < 3.2 mm LEUTL: A < 100 mm VISA: A < 50 mm from H-D Nuhn Undulator System Review March 3-4, 2004 J. Welch, SLAC

Alignment and Stability Strategy Three layers of defense against trajectory errors Beam based fast orbit feedback for launch errors full BBA with multiple beam energies to measure BPM and Quad offsets. Wire Positioning System and Hydrostatic Leveling System HLS systems have shown good long term stability WPS system have shown good short term stability Make foundation and supports as stable as possible thermal stability, geotechnical, and support mechanical design Undulator System Review March 3-4, 2004 J. Welch, SLAC

Beam Based Alignment If errors are too big they must be fixed rather than “corrected for” BBA is the fundamental LCLS tool to obtain and maintain ultra-straight trajectories over long term. Corrects for BPM mechanical and electrical offsets Field errors, (built-in) and stray fields Field errors due to alignment error Input trajectory error Does not correct undulator alignment errors Establishes a best fit straight line electron trajectory Procedure Take orbits with three or more very different beam energies, calculate corrections Move quadrupoles and/or adjust steering coils to correct orbit Disruptive to operation offsets don’t depend on energy 1/month is ignorable, 1/day is intolerable Undulator System Review March 3-4, 2004 J. Welch, SLAC

BPM and Quad Stability Requirements After BBA, changes of BPM offsets will be seen erroneously as orbit errors Stability of BPM mechanical and electrical offsets determine trajectory stability need BPM stability of ~ 2 mm rms BPM’s have to be mechanically more stable than all other components Known BPM motions are taken out in software Quad stability requirements are more like 5 microns Undulator System Review March 3-4, 2004 J. Welch, SLAC

Support and Monitoring Schematic Undulator System Review March 3-4, 2004 J. Welch, SLAC

Foundation Instability Undulator System Review March 3-4, 2004 J. Welch, SLAC

Settlement Implications for LCLS Expect settlement of order ~ 300 - 1000 mm / year = 1 - 3 mm / day, not well correlated with location Good alignment lasts only a day or so Mover range cannot accommodate much of the drift; need another mechanism with plenty of range and periodic realignment Undulator System Review March 3-4, 2004 J. Welch, SLAC

Foundation Design Guidance Uniformity of construction along length avoid fill areas which settle much faster try to avoid kinks, gentle bends are more tolerable Strong thick floor ~ 3 ft, essentially monolithic Buried/tunneled research yard has poor stability good thermal insulation Water table considerations desire either wet or dry all year keep sandstone wet between exposure and concrete Undulator System Review March 3-4, 2004 J. Welch, SLAC

Vibration Normally vibration amplitudes are much less than 1 micron, typically 10 - 100 nm. ~10 nm measured on top of berm. Possible areas of concern air handling units passage of vehicles over undulator hall tunnel. Pointing sensitivity ~ 10-7 radians (1/10 angular divergence) e.g. 10 Hz -> yrms ~ 1 micron Q factors for equipment can be 100’s, supports need to be checked Undulator System Review March 3-4, 2004 J. Welch, SLAC

Thermo-Mechanical Instabilities Dilatation (ordinary thermal expansion) Warp caused by thermal gradients (heat flux) Undulator System Review March 3-4, 2004 J. Welch, SLAC

Dilatation Support column height from (fixed?) bedrock 3+ meters. Temperature coefficient for Anocast 12 ppm/C Temperature change for 1 micron vertical motion is 0.03 C --> BBA re-measure at 0.06 C change -->stability during BBA procedure 0.03 C/ 8 hr, (~1 degree/week) Undulator System Review March 3-4, 2004 J. Welch, SLAC

Warping from Heat Flux T1 T2 Long beams bend easily if there is a heat flux across them. Heat fluxes can arise from Temperature differences between walls and radiant heat transfer Air temperature differences Contact with supports or other materials It is easy to show the bar goes to “average” temperature T1 T2 Undulator System Review March 3-4, 2004 J. Welch, SLAC

Heat Flux Example Heat flow a the bar for 1 degree temperature difference Undulator System Review March 3-4, 2004 J. Welch, SLAC

Heat Flux Distortions Bar Warp d L = 3 m, titanium 3 W/m2 -> 2 micron warp for an undulator segment 2 microns is the walk-off tolerance, -> Max wall temperature difference is ~1 degree C Undulator System Review March 3-4, 2004 J. Welch, SLAC

Thermal Environment Air temperature in both time and space Surface temperatures Heat sources and sinks Undulator System Review March 3-4, 2004 J. Welch, SLAC

Air Temperature Illustration Match MMF temperature Undulator System Review March 3-4, 2004 J. Welch, SLAC

more temp specs Undulator System Review March 3-4, 2004 J. Welch, SLAC

Girder Concept Stability of bedrock is not good (1-3 mm/day) If the girder is truly stable, linearly correlated motion along the girder can be identified and corrector for. The longer the girder the better Stability of bedrock is not good (1-3 mm/day) Long girder to provide good relative alignment stability Length > gain length ( ~ 5 m) Reduce the number of supports req’d Undulator System Review March 3-4, 2004 J. Welch, SLAC

Girder Concept Undulator System Review March 3-4, 2004 J. Welch, SLAC

Why Granite? PRO CON Good overall long term stability common choice for metrology and magnet measurement benches Large thermal mass averages temperature fluctuations, good passive stability Low thermal expansion coefficient ~ 1/2 cte of steel, similar to ceramics Reasonable cost in large sizes ~ $40,000 for 12 x 0.8 x 0.8 m, finished and delivered (enough for 3 undulator segments) Low thermal conductivity sensitive to heat fluxes Variable mechanical properties Doesn’t take a tap hard to add features Not ductile handle with care Heavy Undulator System Review March 3-4, 2004 J. Welch, SLAC

Other Girder Options Aluminum tubes with temperature stabilization Steel or cast iron girders Engineered stone (Anocast) Carbon reinforced plastic tube trusses Specialized concrete NLC technology SiC girders! Undulator System Review March 3-4, 2004 J. Welch, SLAC

Support Assembly Concept Undulator System Review March 3-4, 2004 J. Welch, SLAC

Earthquake bracing J. Welch, SLAC Undulator System Review March 3-4, 2004 J. Welch, SLAC

Support in Tunnel J. Welch, SLAC Undulator System Review March 3-4, 2004 J. Welch, SLAC

Adjustable support platform Undulator System Review March 3-4, 2004 J. Welch, SLAC

Support R&D Testing a 6 m piece from Barre Vt for long term stability - start this summer does it slowly sag? how much does it warp with temperature and humidity changes in the surrounding tunnel? What does sealing do? does insulation help? how much? thermal stabilization time? Prototype mounting schemes for adjustable support platform and kinematic supports Undulator System Review March 3-4, 2004 J. Welch, SLAC

Schedule & Cost Granite manufacture and shipping time 10 weeks for first item don’t know at what rate they can be produced, need at least 11. Quarry closed Jan - Mar Stabilization time ~ 2 months, before ready to measure Integration into installation schedule under development Granite beams ~ $500,000 Other support costs ~ $500,000 Thermometry, kinematic supports, insulation, tubes, plates, eq bracing, etc Undulator System Review March 3-4, 2004 J. Welch, SLAC

Extra Slides Undulator System Review March 3-4, 2004 J. Welch, SLAC

Temperature specs J. Welch, SLAC Undulator System Review March 3-4, 2004 J. Welch, SLAC

Basic Tolerance Requirements from Simulations Saturation length (86 m) increases by one gain length (4.7 m), for the 1.5 Angstrom case if there is: 18 degree rms beam/radiation phase error 1 rms beam size ( ~ 30 mm) beam/radiation overlap error. Undulator System Review March 3-4, 2004 J. Welch, SLAC

Assembly Concept exploded Undulator System Review March 3-4, 2004 J. Welch, SLAC