Minuteman Vocational Technical Regional High School Progress

Slides:



Advertisements
Similar presentations
WEEKLY PHOTO REPORT WEEKLY PHOTO REPORT September 16 th, 2013 – October 25 th, 2013.
Advertisements

Update on FCPS Construction/Renovation Projects September 2009.
CURRENT WORK West Wing - Exterior: Masonry and shingles finished, fascia and soffit work ongoing - 1 st Floor: Final coat of paint, casework installed,
CUNY/CUCF NYCCT New Academic Building F.J. Sciame Construction Presentation August 12, 2013.
Progress and Status COMPANY SWITCHES INSTALLED A/V CABLE INSTALLED THEATRICAL CABLE INSTALLED ORCHESTRA LIFT IS OPERATIONAL STAGE.
Update on FCPS Construction/Renovation Projects August 2009.
April 21, 2010 Barbara C. Jordan Elementary School Update Presented by.
Progress Report 12/13/11. Progress Schedule December 2011 Work Completed December: Installed Concrete topping on roof Rough In M&E East side screen wall.
DG Inyorkern Weekly Project Summary 1/17/14. DG Inyokern 1/17/14: Percentage Overview Demolition: Pad Prep: 100% Finished and ceriified Footing & Foundation:
IWTP Facility. Holes Drilled for Detailed Blast Drilling and Blasting for final grade prior to construction in 2011.
Division 08-Openings ARCH 330 Fall Master Format OPENINGS Operation and Maintenance of Openings Schedules for Openings
Interior and Exterior Demo Continue Dust Control Measures for Air Quality Management Per LEED Construction Plan 4/16/12 – 4/20/12 Iconic Birdcage Removed.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
Facilities Modernization Program Funded by Measure B Project Report April 16, 2012.
TECHNICAL ASSIGNMENT #1 – NATHAN BRASKEY SUNNYVALE PLAZA [Cooper Carry, Inc.]
7 Set of Floor Plans Primary Considerations
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
MAIN ENTRANCE SOUTH EAST VIEW NORTH EAST VIEW.
Transportation Center Rolling Forward Into Phase 2 October, 2008.
Construction Update August 18, 2010 Rob Gaertner, P.E. Director of Facilities.
MSU/MCTC Law Enforcement and Criminal Justice Center March 10, 2010.
1 HVACR116 – Trade Skills Plan Views Elevations Plan Views Elevations.
Foundation Plan Layout
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
Progress Photos Goodnoe Elementary School Additions and Renovations Project November 2013 Goodnoe Elementary School.
Facilities Modernization Program Funded by Measure B Project Report March 19, 2012.
Building Plans.
Facilities Modernization Program Funded by Measure B Project Report November 21, 2011.
Room Design Georgia Donaldson, Adrien Leroux, Arsenije Gavric.
Lancaster, PA Courtyard by Marriott Danielle Shetler - Structural Option Senior Thesis - Spring 2005.
Winchester Medical Center Campus Expansion June 21, 2011.
HVACR116 – Trade Skills Plan Views Elevations. Plan Views.
Wall and Ceiling Construction
Exercise 9 Attributes and Attribute Reporting. Exercise: Attributing and Reporting the Citron House.
TCUSD New K-5 Construction PROJECT UPDATE NOVEMBER 4,
ASSIGNMENT. Luanda, Angola Latitude: 8° 50' 18 S Longitude: 13° 14' 4 E.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
Brandon mckee ae senior thesis 2007 construction management penn state university ambridge area high school Ambridge Area High School ambridge, pennsylvania.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
Floor-Plan Dimensions and Notes
Elevating the Quality of Life in the District. AFTER RENOVATION BEFORE RENOVATION.
FORSYTH COUNTY SCHOOLS 2014 CAPITAL PROGRAM TIMELINE LOCATIONCONSTRUCTION PROJECTARCHITECTA/E STARTGC/CMOPENSUMMARY STATUS HIGH SCHOOL ADDITIONS AND MODIFICATIONS.
Elevating the Quality of Life in the District. Agenda  SITE VIEW  SECTIONS  CONSTRUCTION STRATEGY  TIMELINE – JUNE 2013 TO JULY 2015  TIMELINE –
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Organize Project Team 1 Project is to build Crew Boat facility on Lake Washington Construction Management involves working in teams to meet owner requirements.
OTE Building PMG Report October 25, 2012 Rhonda Merchut 1.
OTE Building PMG Report April 29, Agenda CDF D&D: J. Lewis OTE Building Project: R. Merchut Coordination State Activities Schedule Fiscal Summary.
Chicago Public Library Board of Directors Meeting January 13, 2015 Projects in Planning Schedule/Activity Phase 1 – Under construction. Refer to YOUmedia.
Upon completion of this module, you will be able to:
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Upcoming Activities Fun Fact Click here to view the live WEBCAM
Multistory Office Building
Minuteman Vocational Technical Regional High School Progress
Carleton College Summer 2018 Science and Campus Construction Plan
Progress Report 11/10/11.
Permanent window shutter details
1 Semester Project Design A Multi Story Office Building
Curtain walls Lightweight wall system installed in the exterior of building structures The name “curtain wall” derives from the idea that the wall is thin.
Minuteman Vocational Technical Regional High School Progress
Lecture 4 Building Construction 2 Week 5
New White Lake Township Library
Wall and Ceiling Construction
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
EAST PENNSBORO AREA SCHOOL DISTRICT
Minuteman Vocational Technical Regional High School Progress
Presentation transcript:

Minuteman Vocational Technical Regional High School Progress November 19th 2018 – December 17th 2018

December 17th View of Area A & B – Upper Level Taping/Sanding activities in progress.

December 17th View of Area G – Low Roof Level Green roof membrane substantially complete. Lower level window installation in progress. Out building foundation complete. December 17th View of Area G – Upper Level Sheetrocking & Taping activities in progress

December 17th View of Area E – East Elevation Media Center Curtain Wall Glazed. Metal Panel Installation in Progress.

December 17th View of Area E – East Elevation Rigging and setting of equipment curbs on E Roof.

December 17th View of Area D – Upper Level Sheetrocking activities have commenced and are in progress.

December 17th View of Area D – Gymnasium Slab on Grade was placed 12/10. Rough-in of overhead MEP’s in progress.

December 17th View of Area E+F – Lower Level Final placement of monumental stairs occurred week of 12/10. December 17th View of Area E+F – Lower Level Interior CMU construction nearing completion. Rough-in of overhead MEP’s in progress.

December 17th View of Area F – East Elevation Storefront installation complete. Architectural stone veneer complete. Metal panel installation in progress. December 17th View of Area F – Lower Level Interior CMU wall construction in progress.

December 17th View of Area C – West Elevation Masonry Veneer complete on West elevation. Remaining elevations concurrently in progress. December 17th View of Area C – Mezzanine Level Misc Metal stairs and railings in progress. Temp staging to support overhead rough-in being constructed.

December Construction Schedule Look Ahead: Area A+B Complete Metal Panel Installation Activities Complete Taping on Upper Level B Continue Prime Painting CMU Walls on Lower Level Commence Prime Painting on Upper Level B Area G Complete Window system installation on Lower Level Continue Sheetrocking activities on Upper Level Commence Taping on Upper Level Commence Sheetrocking activities on Lower Level Area E Continue Curtain Wall & Window System installation Continue Rough-In of OH MEP’s on all levels Continue Wall Framing activities on lower level Area D Complete Masonry Veneer activities. Continue Rough-In of OH MEP’s in Mechanical Room & Gymnasium. Continue Window system installation. Area F Complete Window installation. Complete Interior CMU wall construction. Commence Rough-In of OH Duct work. Area C Complete exterior masonry veneer on remaining elevations. Commence Rough-In of OH MEP’s over the theater space. Exterior/Sitework Complete Foundations for exterior out buildings. Continue setting equipment curbs and equipment on all roof levels.