Tower A: A First Look Finding the Data: Login: THIS ONE! user: glast

Slides:



Advertisements
Similar presentations
CU Beamtest Workshop III, June 28-30, 2006 C. Cecchi – S. Germani – M. Pepe Offline Monitor for CU Beam Test Claudia Cecchi Stefano Germani Monica Pepe.
Advertisements

Bill Atwood, Dec GLAST 1 GLAST Energy or Humpty-Dumpty’s Revenge A Statement of the Problem Divide and Conquer strategy Easiest: Leakage (Depth)
GLAST LAT Project I&T Meeting – Jan 20,2004 E. do Couto e Silva 1 GLAST Large Area Telescope: EM1 Data Analysis and Calibration Summary Report Eduardo.
Bill Atwood, SCIPP/UCSC, May 8, 2006 GLAST 1 Partial validation of v9r3 - Bkg. Rej. Comparison 2000 sec. of backgrounds were run using v9r3 (heros: Tom.
Assessment and Proposal W. B. Atwood UCSC, April 6, 2005.
GLAST LAT ProjectIA Workshop 6 – Feb28,2006 Preliminary Studies on the dependence of Arrival Time distributions in the LAT using CAL Low Energy Trigger.
GLAST LAT Project Apr 1, 2005 E. do Couto e Silva 1/31 Overview of End to End Runs Eduardo do Couto e Silva April 1, 2005 ( not it is not a joke, we finally.
GLAST LAT Project Instrument Analysis Workshop 6 – 06/02/27 F. Piron & E. Nuss (LPTA) 1 Trending CAL performance and mapping crystals Gamma-ray Large Area.
GLAST LAT Project Instrument Analysis Meeting– May 27, 2005 Hiro Tajima, TKR Bad Strips 1 GLAST Large Area Telescope: TKR Bad strips analysis update Hiro.
S. Ritz1 Checking Out What is Checked In  Need to optimize balance of checking between users and developers. –infuse more of a culture of detailed checking.
Bill Atwood, SCIPP/UCSC, Oct, 2005 GLAST 1 DC2 Discussion – What Next? 1)Alternatives - Bill's IM analysis - ???? 2)Backing the IM Analysis into Gleam.
A.Chekhtman1 GLAST LAT ProjectCalibration and Analysis group meeting, April, 3, 2006 CAL on-orbit calibration with protons. Alexandre Chekhtman NRL/GMU.
GLAST LAT Project 1 Tracker “mini-tower” Full Size Calorimeter module Face to Face IDT meeting March 20, 2002 Convener: E. do Couto e Silva Engineering.
TkrRecon Status Perugia Software Workshop May, 2003.
GLAST LAT Project Instrument Analysis Workshop 5 – 05/08/29 F. Piron & E. Nuss (IN2P3/LPTA – Montpellier) 1 Comprehensive review of CAL calibrations Gamma-ray.
Bill Atwood, Core Meeting, 9-Oct GLAS T 1 Finding and Fitting A Recast of Traditional GLAST Finding: Combo A Recast of the Kalman Filter Setting.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: On-Orbit Calibration and.
Vertex 2002 Kailua-Kona The heavy ionising particles in CMS tracker Hip effect description. The PSI beam test. Measurements of hip rate and induced dead.
GLAST LAT Readout Electronics Marcus ZieglerIEEE SCIPP The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus.
GLAST LAT Project Software vrvs meeting X. Chen 1 GLAST LAT Project Software vrvs meeting X. Chen 1 Analyses of Muon Calibration Data Xin Chen.
1 The CMS Heavy Ion Program Michael Murray Kansas.
Residual Background events after Rejection Cuts M total background events (GlastReleasev3r3p7) 344 residual events after Bill's rejection cuts. 342.
1 Using Insightful Miner Trees for Glast Analysis Toby Burnett Analysis Meeting 2 June 2003.
Bill Atwood, SCIPP/UCSC, DC2 Closeout, May 31, 2006 GLAST 1 Bill Atwood & Friends.
Event Analysis for the Gamma-ray Large Area Space Telescope Robin Morris, RIACS Johann Cohen-Tanugi INFN, Pisa.
1 ACD studies: 1. Light Yield Determination for top ACD Tiles 2. Looking for holes (screws) in the ACD data Instrument Analysis Workshop VI Luis C. Reyes.
Background runs at the UW “farm” A little background: we have installed the GRID-standard condor from the other UW in Madison. –Currently 6 CPUs available,
Classification and Regression Trees for Glast Analysis: to IM or not to IM? Toby Burnett Data Challenge Meeting 15 June 2003.
New Ntuple Variable: CalEdgeEnergy Leon R. C&A Meeting 12 December 2005.
Bill Atwood, SCIPP/UCSC, Jan., 2006 GLAST 1 The 3 rd Pass Back Rejection Analysis using V7R3P4 (repo) 1)Training sample: Bkg: Runs (SLAC) v7r3p4.
Tracker Reconstruction SoftwarePerformance Review, Oct 16, 2002 Summary of Core “Performance Review” for TkrRecon How do we know the Tracking is working?
GLAST LAT ProjectIntegration and Test CDR Peer Review, March 28, 2003 Document: LAT-PR Section 8 - Page 1 GLAST Large Area Telescope: I & T Peer.
Pass 6: GR V13R9 Muons, All Gammas, & Backgrounds Muons, All Gammas, & Backgrounds Data Sets: Muons: allMuon-GR-v13r9 (14- Jan-2008) AG: allGamma-GR-v13r9.
GLAST LAT ProjectMarch 24, F Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS F: On-Orbit Calibration and.
T. Burnett1 GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 9, 2002 SAS Software: Sources Detector geometry model Simulation Event.
Bill Atwood, SCIPP/UCSC, May, 2005 GLAST 1 A Parametric Energy Recon for GLAST A 3 rd attempt at Energy Reconstruction Keep in mind: 1)The large phase-space.
Feb. 7, 2007First GLAST symposium1 Measuring the PSF and the energy resolution with the GLAST-LAT Calibration Unit Ph. Bruel on behalf of the beam test.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
Trigger Anomaly in BFEM? February 13, 2002 Tsunefumi Mizuno and Tune Kamae.
GLAST Calorimeter Crystal Position Measurement Zach Fewtrell, NRL/Praxis GLAST Integration & Test Workshop SLAC July 14, 2005.
High Redshift Gamma-Ray Bursts observed by GLAST Abstract The Gamma-ray Large Area Space Telescope (GLAST) is the next generation satellite for high energy.
GLAST LAT Project CU Beam Test Workshop 3/20/2006 C. Sgro’, L. Baldini, J. Bregeon1 Glast LAT Calibration Unit Beam Test Status Report on Online Monitor.
Bill Atwood, 6-Feb-2008 Pass 6: GR V13R9 Muons, All Gammas, & Backgrounds Muons, All Gammas, & Backgrounds Overview Overview Data Sets: Muons: allMuon-GR-v13r9.
1 Study of Data from the GLAST Balloon Prototype Based on a Geant4 Simulator Tsunefumi Mizuno February 22, Geant4 Work Shop The GLAST Satellite.
Feb. 3, 2007IFC meeting1 Beam test report Ph. Bruel on behalf of the beam test working group Gamma-ray Large Area Space Telescope.
Gamma-ray Large Area Space Telescope -France -Germany -Italy -Japan -Sweden -USA Energy Range 10 keV-300 GeV. GLAST : - An imaging gamma-ray telescope.
Background Rejection Prep Work
Gamma-ray Large Area Space Telescope ACD Final Performance
Comparison of GAMMA-400 and Fermi-LAT telescopes
GLAST LAT tracker signal simulation and trigger timing study
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Gamma-ray Large Area Space Telescope
DC1 Energy Evaluation.
Event Classification & Background Rejection
A First DC2 Analysis with New Recons
Overview Goal Study GEM variables in SVAC ntuple
TKR to CAL for 16 Towers The usual TKR extrapolation to CAL study, for the 16 tower data. Check calibrations, look for problems, etc. Today -- “work in.
Gamma-ray Large Area Space Telescope
Testing some CAL specs Level 3 CAL requirement 5.5.5:
Imaging crystals with TKR
Mini Tower Preliminary Results
Backgrounds using v7 Mask in 9 Si Layers at a Muon Higgs Factory
GAMOS tutorial Plug-in’s Exercises
Searching for photons in the LAT
CR Photon Working Group
GLAST Large Area Telescope:
Eduardo do Couto e Silva Feb 28, 2006
Studies of the Time over Threshold
Analysis of GLAST Balloon Experiment Data
Presentation transcript:

Tower A: A First Look Finding the Data: Login: THIS ONE! user: glast pw: glast THIS ONE!

Down Load this one ( ~ 68 MB) ~ a long ways down Down Load this one ( ~ 68 MB) A minor discrepancy: What arrived was 103198 events (according to Run List: 103200 events) Name of File: recon-EM2-v1r0_140001340_merit_merit.root

Found Tracks: Phase Space Events Selection: TkrNumTracks > 0 and Tkr1X0 & Y0 within Tower Limits Yield: 100K Events f cos(q) Z0

Found Tracks: Phase Space (continued)

Single Tracks: Finding the DEAD STRIPS Merit Variables: Trk1FirstGapPlane and Tkr1XGap, Tkr1YGap Single Strip Clearly Seen

Single Tracks in the Calorimeter Events Selection: CalEnergySum > 5 MeV Yield: 23.9K Events Expected MIP Events

More Calorimeter Events Selection: CalXtalsTrunc > 7 & < 11 Yield: 9400 Events MIP Signal SHOULD BE ~ 100 MeV (Oooppss!) Layer-by-Layer

Finding the Gammas Used Merit Variable Tkr1SSDVeto TKR Track Projection This variable is a count of the number of silicon planes the projected track crosses Allows using the SSDs in the tracker as an ACD Found Track CAL Require: Tkr1SSDVeto > 0 & CalEnergySum > 50 Yield: 12 K Events Vertex Events are cleaner Keep These Keep These

Are the remaining events gs? Resulting Distributions of First Layers Good g events point to Calorimeter Energy Keep These Are the remaining events gs? Resulting Distributions of First Layers 213 Events Expect step from Thin-to-Thick = 1:4.3 Estimate Background to be ~ 14%