Plan for controls with the digital platform

Slides:



Advertisements
Similar presentations
Experience with an IT Asset Management System
Advertisements

ESS Timing System Plans and Requirements Timo Korhonen Chief Engineer, Integrated Control System Division May 19, 2014.
Status of the European Spallation Source Timo Korhonen Chief Engineer, Integrated Control System Division October 21, 2014.
ESS Test and Prototyping Activities Daniel Piso Ferńandez December 4, 2014.
Agenda Adaptation of existing open-source control systems from compact accelerators to large scale facilities.
Wir schaffen Wissen – heute für morgen 24 August 2015PSI,24 August 2015PSI, Paul Scherrer Institut Status WP 8.2 RF Low Level Electronic Manuel Brönnimann.
Standard WBS Version 1.0 WBS2-3.pptPage 1 Standard Work Breakdown Structure Legend = Decomposes to lower level WBS elements 4.0 Implementation 4.0 Implementation.
Multimedia & Communications ATMEL Bluetooth Background information on Bluetooth technology ATMEL implementation of Bluetooth spec.
From Research Prototype to Production
ESS Controls Infrastructure Timo Korhonen ICS Feb.. 4, 2015.
NCSX NCSX Preliminary Design Review ‒ October 7-9, 2003 G. Oliaro 1 G. Oliaro - WBS 5 Central Instrumentation/Data Acquisition and Controls Princeton Plasma.
ATCA based LLRF system design review DESY Control servers for ATCA based LLRF system Piotr Pucyk - DESY, Warsaw University of Technology Jaroslaw.
Zheqiao Geng 6/5/2012 Plan for Evaluating LLRF Deployment Solution at LCLS-II.
Eugenia Hatziangeli Beams Department Controls Group CERN, Accelerators and Technology Sector E.Hatziangeli - CERN-Greece Industry day, Athens 31st March.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Preliminary Functional Analysis of ESS Superconducting Radio-Frequency Linac C. Darve, N. Elias, J. Fydrych, D. Piso European Spallation Source ESS AB,
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
1 The ILC Control Work Packages. ILC Control System Work Packages GDE Oct Who We Are Collaboration loosely formed at Snowmass which included SLAC,
ICS re-planning, outsourcing/inhouse development strategy and staffing TAC 12 presentation Henrik Carling ESS/ICS Date:
11 th February 2008Brian Martlew EPICS for MICE Status of the MICE slow control system Brian Martlew STFC, Daresbury Laboratory.
Project X RD&D Plan Controls Jim Patrick AAC Meeting February 3, 2009.
Responses to recommendations of TAC 11 Integrated Control Systems Henrik Carling ESS/ICS Date:
ESS Machine protection review Welcome Henrik Carling ESS/ICS Date:
Software tools for digital LLRF system integration at CERN 04/11/2015 LLRF15, Software tools2 Andy Butterworth Tom Levens, Andrey Pashnin, Anthony Rey.
Conventional Facilities integration: Approach and Issues Daniel Piso Fernández WP Leader (WP13 Conventional Facilities Integration Support) November 5,
ESS (vacuum) control system Daniel Piso Controls Division February 20, 2013.
Daniel Piso Fernández Some Ideas about Integration Support Cases and PLC Activities at Controls Division.
In-Kind Strategy Integrated Control Systems Garry Trahern Head of ICS Division TAC 9, 3 rd April, 2014, ESS, Lund.
Controls standards and support Daniel Piso Fernández Hardware and Integration Group Leader 10 February 2016.
ICS interfaces Timo Korhonen ICS Apr 22, 2015.
Operations WBS Dictionary Integrated Control Systems Henrik Carling ESS/ICS Date:
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
Integrated Control Systems Status and Plans Garry Trahern Head of ICS Division TAC 9, 3 rd April, 2014, ESS, Lund.
ESS Timing System Plans Timo Korhonen Chief Engineer, Integrated Control System Division Nov.27, 2014.
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
CONFIGURATION MANAGEMENT AND CONTROL PLAN ESS Quality Assurance and Control workshop (30June) V. HENNION.
Status of Integrated Control Systems
Cryomodule test stand at ESS site
Software Overview Sonja Vrcic
Uppsala Commitment to ESS and FREIA Planning
PLC-based control systems at SOLEIL - ICALEPCS 2017
The ILC Control Work Packages
THE PROCESS OF EMBEDDED SYSTEM DEVELOPMENT
Edgecore ASFvOLT16 VOLTHA Adapter and Driver Kim Kempf, Sr
Proton Source and LEBT Luigi Celona & Lorenzo Neri
swingo XP Firmware, Service Tool & Error Codes
Experience with an IT Asset Management System
Chapter 2: Operating-System Structures
Design Principles of the CMS Level-1 Trigger Control and Hardware Monitoring System Ildefons Magrans de Abril Institute for High Energy Physics, Vienna.
RF Local Protection System
Way of working with ICS HWI Hardware and Integration
Status of Control Services ICS WP10 (accelerator integration work package) Tuesday 20th November
nBLM Back End Electronics and Control System
ICS update 7th Experiment Control Workshop
PLCs integration into the ICS
Krzysztof Czuba ESS LLRF Quarterly Meeting
Chapter 3 – Operating Systems
ESS Main Control Room & ICS Infrastructure
Data-on-demand use-cases
Control Systems for the APTM and GRID
Chapter 2: Operating-System Structures
NSS integrated installation plan workshop Introduction
Commissioning the European XFEL cryogenic system and best practice
Status of the ESS High Power RF Systems
Atefeh Sadeghzadeh Control engineer – Target safety and control
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
CE compliance -LLRF- Anders Svensson, ESS
Target Safety System Interfaces
Rack installation and local tests for the MEBT Chopper Rack
Introduction to the ESS Integrated Control Systems
Presentation transcript:

Plan for controls with the digital platform Henrik Carling Head of ICS division www.europeanspallationsource.se 2017-12-04

The ESS integrated control system The ESS facility is a large and complex machine with very much and diverse equipment that needs to work in synchronization and with well-known configurations For this purpose almost all equipment at the ESS facility is connected to the Integrated Control System Examples: Voltage supplies for magnets Vacuum systems Cryogenic equipment RF equipment Air conditioning in the tunnel The control system is the ”central nervous system of ESS” An estimated 1.6 million control points will be needed

nBLM plan/collaboration with CEA and Technical university of Lodz nBLM CS Design Document (including the FPGA simulation) nBLM FPGA firmware Validation of FPGA nBLM prototype detector control and acquisition Acceptance Test Report of nBLM prototype control Support 2017-12 2018-01 2018-02 2018-03 2018-04 2018-05 2018-06 2018-07 2018-08 2018-09 2018-10 2018-11 2018-12 Kick-off meeting Specification and requirement analysis Prototype version of the FW Test report Production FW

Control system infrastructure components MTCA.4 Crates, MCH, Cooling Units, PSU First batch procured delivery date TBD I/O and processing Digital platforms IFC1410 First production batch at ESS this week Timing System EVG, EVR, Distribution System Procurement launched

Digital platforms, status and support IFC_1410 (and IFC_1420) In-kind contribution from PSI (boards + firmware + software) Generic packages of firmware, drivers, EPICS support Project delays due to in-kind issues Contractual issues with Switzerland Development kept going through ICS cash support Not optimal but hardware is now in good shape Tried to manage need with a 10-unit initial batch PSI support was limited until full approval But now: strong support from PSI 1 FPGA engineer, 1 SW engineer full time Part-time support of 8+ people (controls, LLRF, instrumentation) Use of PSI resources for ADC performance characterization, etc. Production-quality kernel drivers (initial) release Procuremment launched Series production has started

Digital platforms, status and support IFC_1410 (and IFC_1420) Firmware status Generic applications (“oscilloscope”) running since a while ICS has prioritized RF support (RF-LPS firmware) Drivers (Linux, kernel) Worked so far on a version from the commercial partner This had a number of issues: thread safety, etc. A new, production-quality driver, supported by PSI and commercial partner released EPICS Moving support to the new driver Area Detector will be the main driver for ESS Also a generic driver from PSI will be supported (regDev). This is primarily for prototyping but has also been used in production. Like “streamDevice” but for register-based, memory-mapped devices No programming needed

System characterization report available

ICS vision and mission statements ICS vision statement ESS operated efficiently, reliably and safely, with a control system that everyone loves ICS mission The ICS division shall provide and maintain world-class and cost-efficient control, protection and safety systems and services for the ESS facility. The division shall develop competence and innovative solutions that can be shared in the community through open processes