Project WECC-0100 Update Reliability Subcommittee

Slides:



Advertisements
Similar presentations
NERC TPL Standard Issues TSS Meeting #146 Seattle, WA August 15-17, 2007 Chifong Thomas.
Advertisements

WECC Standards Committee Joint Session
Phase 2 Composite Load Model Impact – RS Discussion From Draft Preliminary white paper dated 10/20/11.
Notice of Proposed Rulemaking on Standards WECC Board of Directors Meeting December 7-8, 2006.
WECC Operating Committee and Planning Coordinating Committee Brian K. Keel Chair – Reliability Subcommittee June 18 & 19, 2009 WECC Reliability Subcommittee.
Reliability Subcommittee Report Vishal C. Patel Chair – Reliability Subcommittee March 2014.
Marv Landauer Report to TSS on RS Activities April 25-27, 2012 Salt Lake City.
Presented to PGDTF February 11, 2015
Key Reliability Standard Spot Check Frank Vick Compliance Team Lead.
Steve Rueckert Director of Standards Standards Update June 5, 2014 Joint Guidance Committee Meeting Salt Lake City, UT.
Recent NERC Standards Activities RSC – Jan. 5, 2011 NSRS Update Date Meeting Title (optional)
Branden Sudduth Director, Reliability Assessment and Performance Analysis Rocky Mountain Region PA/PC Meeting March 18-19, 2014 Denver, Colorado.
WECC and NERC Protection Criteria and Standards
Small Signal Stability Analysis Study: study prepared by Powertech Labs Inc. for ERCOT Vance Beauregard AEP 9 April 2002.
WECC Standards Update Steve Rueckert – Director of Standards W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
FRCC Seasonal Transmission Assessment & Operational Seasonal Study Winter 2012.
ERCOT SOL Methodology for the Planning and Operations Horizons Stephen Solis 2014 OTS 1.
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
Project WECC-0100 Update Reliability Subcommittee February 2014.
Steve Rueckert Director of Standards TPL Discussion – PCC Steering Committee March 25, 2014.
Standards Update Steve Rueckert – Director of Standards W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Standards Subject to Enforcement Currently Or Standards Subject to Future Enforcement TSS Meeting #169 May 6-8, 2015 By: Lesley Kayser-Sprouse.
Project System Protection Coordination Requirement revisions to PRC (ii) Texas Reliability Entity NERC Standards Reliability Subcommittee.
ERCOT PUBLIC 4/21/ RTP: Cascade Analysis April 21, 2015.
NERC Project S ystem Protection Coordination - PRC-027​ Presentation to the NSRS Conference Call August 17, 2015 Sam Francis Oncor Electric Delivery.
Grid Reliability Metrics by Jim Dyer Electric Power Group, LLC January 29, 2004 Washington, DC Transmission Reliability Research Review.
WECC Standards Update Steve Rueckert Director of Standards W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Steve Rueckert Director of Standards TPL Discussion – PCC Steering Committee March 25, 2014.
WECC-0100 Scope, Content & Status Update Rikin Shah, PAC Orlando Ciniglio, IPC WECC TSS Meeting, Salt Lake City, UT January ,
Reliability Subcommittee Report Vishal C. Patel (RS Chair) PCC Meeting La Jolla, CA- March 22, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Path Operator Implementation Task Force Vic Howell, Vice Chair Report to OC March 22, 2016.
Remedial Action Scheme Workshop RAS Workshop May 9, 2016.
Project WECC-0100 Standards Briefing WECC-0100 SDT April 7, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Reliability Must Run Workshop RMR Study Process May 24, 2016.
Reliability Standard TPL Transmission System Planned Performance for Geomagnetic Disturbance Events September 28, 2016 TPL Standard Status.
Bert Peters Chair, Path Operator Task Force
WECC – NERC Standards Update
RASRS Report to Operating Committee March 21, 2017
Freeport Area Master Plan Project -
Phase Angle Limitations
COM Operating Personnel Communications Protocols
Planning Geomagnetic Disturbance Task Force (PGDTF) Update to the ROS
Proposal to Remove from Service the PV-COI RAS
WECC Regional Standards Update
Path Operator Implementation Task Force
Eleanor Ewry Base Case Coordination Subgroup Chair
Updates to the Path Rating Process for Approval by the PCC
Long-term Planning and TPL TP Workshop November 2, 2017
Phil O’Donnell, Manager Operations and Planning Audits
Kenneth Silver Los Angeles Department of Water & Power
Merrill Brimhall – Engineer, Staff
Project WECC-0100 Update Load Modeling Task Force
PRC-006-RFC-01 Automatic Under Frequency Load Shedding Requirements
Planning Tools Overview
Rates & Regulatory Updates
Specifications Updates and Approval
CMPLDWG Composite Model with Distributed Generation Approval
UNIT V STABILITY ANALYSIS 9
Vic Howell – Mgr. Operations Engineering Support
NERC PRC Drafting Team Voltage Ride-Through (VRT) Curve Genesis
Planning Tools Overview
CMPLDWG Composite Model with Distributed Generation Approval
Phil O’Donnell, Manager Operations and Planning Audits
Steve Rueckert – Director of Standards
TPL Voltage Guideline Presented to TSS Baj Agrawal Arizona Public Service Co. 8/21/2017.
Palo Verde-COI RAS Retirement
Project WECC-0100 Update Load Modeling Task Force
WECC – NERC Standards Update
Palo Verde-COI RAS Retirement
Bert Peters Chair, Path Operator Task Force
Presentation transcript:

Project WECC-0100 Update Reliability Subcommittee February 2014

TPL-001-4 Effective Dates FERC Acceptance October 17, 2013 January 1, 2015 R1 – maintain System models R7 – PC and TP study responsibilities January 1, 2016 R2 – prepare annual Planning Assessment R3 – steady state studies R4 – stability studies R5 – TP and PC criteria for voltage and transient performance R6 – TP and PC criteria to identify system instability for ... R8 – Distribution of Planning Assessment results January 1, 2021 – NCLL no longer allowed as corrective action plan for certain Contingencies listed in Standard

Project WECC-0100 Scope WECC Board approved retirement of WR1, WR2, WR4, WR5 upon effective date of NERC TPL-001-4 WR3 (voltage stability margin), TPL-001-4 R5 and R6 R5 – criteria for acceptable ss voltage limits, post-contingency voltage deviations, and transient voltage response R6 – criteria or methodology used in analysis to identify System instability for conditions such as Cascading, voltage instability, or uncontrolled islanding TPL-001-4 is the Standard – Reliability need is for TP’s and PC’s to have a criteria per R5 and R6 Regional Business Practice is a Criteria to help meet the Standard where consistency in WECC is important

Voltage Instability Criteria Alternatives being discussed: Existing Criteria: At a minimum, verify power flow convergence at 105% and 102.5% of (base/reference) transfer or load levels - Solution Divergence => Voltage Instability Concern about Existing Criteria: specifying a particular methodology, not truly VS margin; questionable VS Test – myriad reasons for solution divergence Alternative Criteria: Demonstrate actual margins (real and reactive) > minimum by using post-contingency P-V and V-Q analyses (as per “WECC Voltage Stability Criteria – Guideline”) Other?

Transient Voltage Performance Alternatives being discussed: Apply extrinsic documents by reference Apply PRC-024 generator LVRT curve to generator busses to ensure resources stay connected for planning contingencies Apply PRC-024 generator LVRT curve to generator and load busses to demonstrate acceptable performance, evaluate risk Apply PRC-024 generator LVRT curve to generator busses and something else to load busses to demonstrate acceptable performance Drafting concerns As “extrinsic” documents such as PRC-024 change – so does the WECC-0100 document Incorporation by reference means WECC loses control of administration Operational concerns Concern raised about expected ride thru of loads (that is NCLL) Concern raised about expectations of ride thru of loads for 3-Phase faults FIDVR considerations Other?

Steady State Voltage and Voltage Deviations Alternatives being discussed: Steady state voltage limits are individual system dependent, if an individual system does not have a criteria then specify a default for those systems Voltage deviation may be covered by transient voltage response if a voltage ride-through type curve (e.g. PRC-024) is utilized

Instability for Cascading and Uncontrolled Islanding Cascading and Uncontrolled Islanding not allowed for planning contingencies Alternatives being discussed: Point to existing NERC Glossary definitions Create a “criteria or methodology” (R6) to identify/detect the potential for its occurrence, e.g. Post-contingency Line loading exceeds relay loadability setting (determined in PRC-023)… potential trigger for thermal cascading Poorly damped rotor-angle oscillations or unstable power swings… potential trigger for uncontrolled system separation