Topic raised at July 2009 Distribution Workstream

Slides:



Advertisements
Similar presentations
Mod 0260 Post-Emergency Claims: Implementation Update Transmission Workstream - December 2009.
Advertisements

Project Nexus Next Steps Xoserve/Large GT View – 6 December 2011.
Nexus Workgroup Transition Approach Update 8 th January 2014.
Funding UKLink Process changes (User Pays). 2 Purpose of Presentation  Review of User Pays  Principles  Application to date  National Grid NTS observations.
Commercial Arrangements For Gas Quality Service – Process UNC Transmission Workstream 23 rd April 2007.
Mod for Discussion on 7 th January 2011 Draft Outline of Potential Refinements to the User Pays Modification Process Action RG Based on discussions.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Generic & Enduring Functionality to Allow Xoserve to Confirm a Supply Point into a Shipper’s Portfolio UK Link Committee – April 2013.
ROM and DCA. Scene setting Our house Our aspiration for our house Our project manager Us.
Open letter on Development of the regime ahead of winter 2007/8 Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 28 June 2007.
Customer Charge On behalf of all DNs 25 October 2010.
Draft Modification Proposal: Population and Maintenance of Market Sector Code within Sites & Meters Simon Trivella –25 th February 2010 Distribution Workstream.
Agency Charging Statement Overview of Consultation 11 th February 2008.
Project Nexus : Funding Arrangements Joel Martin - 30 April 2009.
1 New proposal extending the services created by Modification 279 historic asset and read data Modification 279 created an annual report (on request at.
UNC0376A - Increased Choice when applying for NTS Exit Capacity – User Pays initial thoughts Review Group August 2010 Transmission Workstream 01.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
Industry Dialogue on xoserve Services 14 th September 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Development Modification Proposal: Introduction of an Inter-day Linepack Product Review Group August 2010 Transmission Workstream 07/10/2010.
IGT and Shipper Workgroup meeting 28 th February 2011.
User Pays User Committee 12th November 2013
Supply Point Register 7th December 2011
Supply Point Enquiry Service
Consideration of issues raised by UNC Modification Proposal 0244
Introduction of Code Contingency Guidelines Document
UNC Modification 0663S Extending the data comprised under the definition of Supply Point Premises Data (TPD V5.18.1) and iUNC Modification 114 Extending.
UNC Trader User – Licence obligations
PN UNC Workgroup iGT Services
UNC Modification – Non Effective Days
NTS Entry Charging Review Update
Assignment Workshop 2 16th September 09, Solihull.
DSC ChMC CSS update 7th November 2018
Project Nexus Workgroup
Development Modification Proposal 0337: Introduction of a Inter-day Linepack Product – OPEN LETTER Review Group August th November 2010.
CSEPs Reconciliation Proposals
UNC Mod Retrospective Invoice Limitation © 24 November 2009 EDF Energy plc. All rights Reserved.
UK Link Programme and ‘Nexus’ UNC Modifications
CSS Update for CoMC 19th September 2018
DSC Change Committee Summary – 11th July
Consideration of issues raised by UNC Modification Proposal 0244
Chris Warner UNC Modification Panel 21 December 2017
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
CONFIDENTIAL - Title of presentation © 24 November 2009 EDF Energy plc
Distribution Workgroup 8 August 2012 Joanna Ferguson
Smart Metering Portfolio DCC Day 1 UK Link Committee DCC Day 1 Shipper File Format Representation Thursday 08th August 2013.
Introduction of Code Contingency Guidelines Document
Modification Proposal 0474: Inclusion of the guidelines relating to the “Customer Settlement Error Claims Process” within UNC governance.
Proposer: Transporter /
Mod Proposal 0268 : AQ Backstop Date
Transporter Initiated SPA Confirmations on behalf of User Potential Impact Discussion with UK Link Committee.
Richard Fairholme Transmission Workstream 4th September 2008
Consideration of issues raised by UNC Modification Proposal 0244
Mark Freeman 29th January 2007
Modification 0448 – European Driven Change Process Flow Diagram
Options for the Development of a Demand Side Response Mechanism
UK Link Replacement Programme additional supporting UNC modifications
Proposer: Debbie Brace Panel Date: 20th March 2014
PN UNC Workgroup iGT Services
Modification Proposal 255 – LSP Objection Rates
Information Provision for Transitional Exit Capacity
Implementation Approach Distribution Workgroup – June 2014
Assignment of NTS Entry Capacity – Work currently being Undertaken
UNC MOD 213: USER PAYS GOVERNANCE ARRANGEMENTS
Project Nexus Workgroup
Transmission Workstream 05 November 2009
Proposal to issue first report in December 2018
Xoserve Draft UIG Incentives Modifications 20 May 2019
Presentation transcript:

Modification 0279 - Improving the availability of meter read history and asset information Topic raised at July 2009 Distribution Workstream Draft proposal was to create a reporting service, placing obligation on GTs to provide service defined in UNC Proposer discussed topic with xoserve in to determine viability xoserve reviewed data content and recommended making the proposal a “permissions” arrangement to enable xoserve to provide services tailored to customers needs Proposer refined draft proposal in light of xoserve review with regard to data content, but not service definition Proposal raised by GDF in November 2009 User Pays proposal, cost recovery 100% shippers, development service and ongoing service defined ROM costs provided, included in final modification report (February 2010) ACS submitted using cost recovery basis defined in proposal, and approved Mod approved by Ofgem in July 2010

Modification 0279 - Improving the availability of meter read history and asset information xoserve observations: UNC User Pays proposal successfully implemented Discussion with xoserve prior to raising proposal speeded up proposal development xoserve provided input to draft proposal, some suggestions accepted, some not, proposers prerogative Although xoserve put forward suggestion to enable a more flexible service arrangements for the community (our customers), these were not pursued by the proposer or the Distribution Workstream. Therefore, commercial matters are not always in xoserve’s control. Given this learning point what are the solution options?