How to explain positions, parts and assets to dummies?

Slides:



Advertisements
Similar presentations
Operations Management
Advertisements

Software Modeling SWE5441 Lecture 3 Eng. Mohammed Timraz
ITIL: Service Transition
Prepared By: Certified Compliance Solutions, Inc. August 2012
PDS secondo le IEC n.
OHT 2.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Software Quality assurance (SQA) SWE 333 Dr Khalid Alnafjan
The EFNMS Maintenance Concept Date: September 13, 2012 Presenter:Alex Stuber.
Profile and a quick introduction Software Engineering: ) هندسة البرمجيات (in Arabic: is the branch of computer science Designed to develop a set rules.
9964E Fitness industry equipment maintenance. Theme 1 A] Conducting basic maintenance of equipment and facilities of a fitness centre For each of the.
Approaches to Technological Education Faculty of Science and Engineering, Shimane University Tadashi OHTANI No.1 Industrial Arts Curricula in Japan in.
CERN Methodology document 1 Use of CERN CAD Exchange tool Process and rules for exchange of CAD files by using CERN CAD Exchange tool. Prepared by : B.
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4103/EN/LHCb Design, Supply, Installation and Commissioning of an HVAC system, a Smoke.
BIDDERS’ CONFERENCE IT-3981 Dismantling, Refurbishment, Replacement and Supply of Electrical Overhead Travelling Cranes Over 10 Tons Capacity January.
KS3 Phase4 Client Server Monitoring System October 1, 2008 by Stephen, Seema, Kam, Shpetim.
1 User’s perspectives on the management of Elements Important for Safety (EIS) AMMW - CERN Anne Funken, Marc Tavlet / BE-ASR-SU.
Corporate Technical Infrastructure Management From MP5 to a Corporate Technical Infrastructure Management System.
April 23rd-24th 2013Handling Engineering Group. Introduction to CERN April 23rd-24th 2013Handling Engineering Group2  CERN: European Organization for.
Over View of CENELC Standards for Signalling Applications
Samy Chemli – Configuration Management - S. Chemli EN-MEF – Contents Configuration Management Hardware Baseline Change Management.
Module 4Slide 1 of 23 WHO - EDM Validation Basic Principles of GMP.
August 22nd/23rd 2014 WG B3.32 Saving through Optimized Maintenance in Air Insulated Substations 2014 Session – Paris, France.
Lim Sei cK.  You are to draft a MANAGEMENT PLAN for your business project.  You are only required to include all the key points that we have already.
Technical Committee 3 INFORMATION STRUCTURES, DOCUMENTATION AND GRAPHICAL SYMBOLS.
Dr. Mohamed Riyazh Khan DoMS
Application of a CAMMS to CERN’s cryogenic installation park G. Perinić and S. Knoops, CERN.
Component Design Elaborating the Design Model. Component Design Translation of the architectural design into a detailed (class-based or module- based)
OPF FOCUS GROUP The Provision of Co-location Facilities and Process Greg Mook 1 September 1999 OPF Co-location Focus Group.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience Product Lifecycle Management.
Equipment Usage Brad Adamczyk Equipment and Job Costs How would job costing my equipment benefit my business? How do I determine what to charge? How.
1 Key CIM Classes and Message Types Used in the Asset Life Cycle Greg Robinson
Review of the processes released in the framework of the MMP Goran Perinić.
Philip Schwarz TE-MSC-MNC 1 Engineering Specifications for ELENA ring and TL magnets Philip Schwarz on behalf of WP 2.2 ELENA IIC meeting 5 th December.
ELENA Documentation and Data Management Items, Assets, Functional Positions T. Birtwistle EN-ACE-CL With input from T. Krastev EN-ACE-EDM.
ERT 421 Good Manufacturing Practice for Bioprocess Engineering Test 1: answer scheme.
Service Agreements Emmanuel Tsesmelis CERN / TS-LEA RRB Scrutiny Group 31 August 2006.
C. Darve / Technical Board – December 13 th, 2012Preliminary pressure vessel code requirements Preliminary pressure vessel code requirements Technical.
Logo area MQXF Review: Safety Thomas Otto HL-LHC Project Safety Officer With contributions by -Paolo Ferrcin and Ezio Todesco, TE-MSC -Francesca Viggiano,
Forecasts for waste and radioactive material storage A. Funken, L. Kobzeva LIU-Ions Coordination Meeting, 27/04/2016.
IEC TC3 Blank Detail Specification
QRB 501 Week 1 Summary To purchase this material click on the link NEW/QRB-501-Week-1-Summary Answer the following.
QRB 501 Week 2 Summary NEW/QRB-501-Week-2-Summary What is the single most important concept you learned this week?
QRB 501 Week 3 Summary To purchase this material click on the link NEW/QRB-501-Week-3-Summary Answer the following.
QRB 501 Week 4 Summary Answer the following questions in words: 1. What is the single most important concept you learned this week? Why? Describe.
Crab Cavity Technical Coordination meeting:
ITIL: Service Transition
A possibility to organize information
Business Markets and Buying Behavior
Preparation of functional/engineering specifications for HL-LHC
CAD/PAD Life Cycle Sustainment Plan (LCSP) 2017 CAD/PAD International Logistics meeting Lee Manis USN/USMC CAD/PAD APML 23 May 2017.
Configuration Management and Layout Database ELENA Project
Quality Assurance applied to Accelerator Safety
Renovation of the Accelerators Controls Infrastructure and its Assets Management Asset and Maintenance Management Workshop November 14th, 2013 Cl.Dehavay.
Service Marketing
Service Marketing
Service Marketing
Service Marketing
Service Marketing
Service Marketing
Barcelona, May 14, 2003 Session 5; Block 1; Paper 5
ISO Brief Overview 17 September 2008 Magne Valen-Sendstad.
Technical Data Management Items
A Process View of the Supply Chain
Title slide Your name.
Infor EAM in the Handling Engineering Group at CERN
Technical Description
Strategies for Technical Communication in the Workplace
Safety Readiness Review (SRR) Thomas Hansson, ESH
installations and assemblies
East Hall under construction
Presentation transcript:

How to explain positions, parts and assets to dummies? Goran Perinić, CERN 4/10/2019 AMMW2018, CERN EDMS 2028609

AMM concepts Functional Position Part Location Asset Item 4/10/2019 AMMW2018, CERN EDMS 2028609

Contents Explanation attempt 1 – Our daily life Explanation attempt 2 – Tell it the physicist 3 - My preferred official explanation 4/10/2019 AMMW2018, CERN EDMS 2028609

Explanation attempt 1 – Our daily life 4/10/2019 AMMW2018, CERN EDMS 2028609

4/10/2019 AMMW2018, CERN EDMS 2028609

4/10/2019 AMMW2018, CERN EDMS 2028609

4/10/2019 AMMW2018, CERN EDMS 2028609

4/10/2019 AMMW2018, CERN EDMS 2028609

Explanation attempt 2 – Tell it the physicist We need a new bunch compression C5 C4 C1 C3 C2 C7 C6 The C system CL controls Describe functional requirements! MB magnet RC converter ET transformer https://layout.web.cern.ch/ 4/10/2019 AMMW2018, CERN EDMS 2028609

Items Design or specify it! https://edms.cern.ch/ 4/10/2019 What to build or to buy Design of the EC transformers Design or specify it! https://edms.cern.ch/ 4/10/2019 AMMW2018, CERN EDMS 2028609

Hey, both correspond to the spec. Parts Hey, both correspond to the spec. Describe what we got! https://cmmsx.cern.ch/ 4/10/2019 AMMW2018, CERN EDMS 2028609

We need to change the oil on EC-013 Assets We need to change the oil on EC-013 https://cmmsx.cern.ch/ 4/10/2019 AMMW2018, CERN EDMS 2028609

We need to reserve the space? Locations We need to reserve the space? Where will it be located! https://gis.cern.ch/ 4/10/2019 AMMW2018, CERN EDMS 2028609

My preferred object lifecycle story – IEC-81346-1 Industrial systems, installations and equipment and industrial products – Structuring principles and reference designations – Annex B Function aspect (e.g. motor) Functional requirement specification (technical details) Location aspect (attribute a space) Component type specification (standardize) Function and location list Product specification Part list for manufacturing Transport specification Installation Commissioning Acceptance and individual log Operation and maintenance Alternative specimen Alternative type and supplier Process modification Location extension Others Closing down Dismantling Life cycle end 4/10/2019 AMMW2018, CERN EDMS 2028609