HIGH POWER AMPLIFIERS For WARM LINAC Arash Kaftoosian

Slides:



Advertisements
Similar presentations
1 BROOKHAVEN SCIENCE ASSOCIATES Procurement Dave Paveglio, Contract Administrator NSLS-II PAC Meeting May 25, 2007.
Advertisements

13 th ESLS RF meeting, DESY, 30/09 – 01/10/2009J. Jacob: Status of the RF Upgrade at the ESRF1 13 th ESLS RF Meeting 2009 DESY, 30 th September – 1 st.
DESIGN OF A HIGH POWER TEST STAND FOR ESS SPOKE CAVITIES
EU-TURKEY CHAMBER FORUM PROJECT (ETCF) ETCF is funded by the European Union. 1 EU-TURKEY CHAMBER FORUM EU TURKEY CHAMBERS PARTNERSHİP GRANT SCHEME PROCUREMENT.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
1 BROOKHAVEN SCIENCE ASSOCIATES ASD Procurements Gregory Fries Liaison/Manufacturing Engineer NSLS-II ASAC October 22-23, 2009.
Anders Sunesson RF Group ESS Accelerator Division
SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 17 th December 2013.
SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 15 th August 2012.
H. Danared | TB12, 5 Mar 2015 | Page 1 Håkan Danared Mats Lindroos Lund, 5 March 2015 Status of In-Kind Contributions to Accelerator.
DTL prototype summary and production sequence F.Grespan LNL _06_22 CDR.
High Voltage modulators ESS developments Carlos A. Martins ESS Accelerator Division, RF electrical power systems.
A. Perin, TE/CRG, Page 2 CERN-GSI FAIR Project integration/coordination meeting 5 14 th October 2015 A. Perin, H. Derking, L. Stewart, M. Chesi,
ESS WP4 Strategy for series production ESS TAC10 – 5th to 6th November Lund Sébastien Bousson WP 4 leader.
H-ECCTD KICK-OFF DEVELOPMENT PLAN AND SCHEDULE 16/03/2016.
IN THIS Slide show YOU WILL LEARN ABOUT ALL VERSIONS OF "MS OFFICE"
Linac Design Update Project WP6 - Monthly Report –
API 19 CI Chemical Injection Devices for Downhole Applications
ESS Program Plan and Schedule Update
WP High Beta Cavities Delivery
Status of the M-ECCTD F. Peauger - P. Bosland
Prospects for developing new tubes
RF cell Anders Sunesson RF group leader
PANAGIOTIS FARANTATOS(TE/MSC-MNC)* WP3, ESR 4: New Magnet
Spoke section of the ESS linac: - Status of prototypes and CDS-SL
CSP 25th November 2010 Technical agreement number 3: overview
Complementary ISTC Projects #3888, 3889p
Second SPL Collaboration Meeting, Vancouver May 2009
Primary Longman Elect 3A Chapter 5 Asking about dates.
Olof Bärring LCG-LHCC Review, 22nd September 2008
SIS100 quadrupole status S. Kostromin, H. Khodzhibagiyan, G. Trubnikov, FAIR 11th MAC, GSI, May,
RF Status 1 4 High Power Amplifier circuits available CERN(2)
13-block rotation schedule
Olivier Napoly, coordinator CEA/Irfu
PCS Day - Feedback 23th November 2016, Vienna.
Purchasing cycle Purchase request
Student Administration and Support Programme and Project Timelines
Advanced Research Electron Accelerator Laboratory
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
GANTT CHART can be used for scheduling generic resources as well as project management. They can also be used for scheduling production processes and.
RF Distribution for Warm Linac
LO BOX and LO/CLK DISTRIBUTION Arash Kaftoosian ESS Bilbao, May 2018.
FAIR pLinac RFQ Meeting pLinac RF Power Sources
Status of the CNRS Contribution to the ESS Accelerator
RF systems introduction
Elettra Sincrotrone Trieste
ESS Bilbao RF Systems Overview Pedro J. González
Ciprian Plostinar Workshop on Testing and Commissioning
Student Administration and Support Programme and Project Timelines
Daresbury ESS In-Kind Contributions
Status and New Developments of ALBA RF Systems
Krzysztof Czuba ESS LLRF Quarterly Meeting
The Bunker Project Overview Zvonko Lazic
Risk, Schedule, Deliveries
Overall time schedule of SRF activities
Introduction CDR Normal Conducting Linac LLRF
XRN Nov 19 Release - Status Update
Elettra – Sincrotrone Trieste S.C.p.A.
Status of the ESS High Power RF Systems
IT Managed Services Transition Weekly Activity Report: June 11th, 2019
ThomX – Commissioning Meeting – 25/01/2018
Status and New Developments of ALBA RF Systems
Accelerator Installation Schedule
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
November 2007 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4c Project Plan] Date Submitted: [15.
XRN 4954 – MiR Drop 5 - Status Update
XRN 4927 – MiR Drop 4 - Status Update
SNS-PPU upgrades the existing accelerator structure
General Overview of WP 12 ESS Vacuum System
Project Support Meeting January 9, 2019
Presentation transcript:

HIGH POWER AMPLIFIERS For WARM LINAC Arash Kaftoosian ESS Bilbao, May 2018

Outline SSPA for MEBT Status Klystron Driver Amplifiers Re-conditioning/Repair of 3 existing klystrons Tendering Process of the 3 new klystrons

STATUS OF SSPA TENDER 3 x 30kW solid-state amplifiers for feeding buncher cavities in MEBT Tender published in March with closing date on 23/4/2018 5 offers received: BTESA and TTi from Spain, DB Science and SYES form Italy, TMD from the UK Only two companies (BTESA and TTi) provided required administrative documents and could pass to technical evaluation stage. Technical evaluation is in process and June 15th the third envelop which includes the offered price will be opened and the winner will be determined.

TIME SCALE OF SSPA July18 April19 October19

DRIVER AMPLIFIERS

DRIVER AMPLIFIERS Call for tender: 6 x 500W 352MHz RF amplifiers as klystron driver. Question: Should we add 1 or 2 driver units to the tender as spare units, under the “Scope swap” scheme? All documents are ready to publish the tender Call for tender is expected to be out in June

DRIVER TIME SCALE July18 Dec.18 May19 First Amplifier Delivery CDR SAT First Amplifier Delivery ValidationApproval (SAT) 2nd to 6th Amplifiers Delivery Signing Contract

KLYSTRONS Three out of four VKP-8352A klystrons from CPI are being prepared to send to Lund Three new klystrons to be procured (Call for tender in June)

EXISTING KLYSTRONS Re-conditioning of 2 klystrons VKP-8352A SN#002 and #004 is ongoing at ESS-Bilbao test stand and expected to be finished in Q3/Q4 this year

EXISTING KLYSTRONS Klystrons VKP8352A SN#001 and #003 are ready to ship to CPI, Palo Alto Klystron #003 has a microleak in vacuum system and will be repaired at CPI Klystrons will be tested and conditioned for long RF pulse, plus warranty extension procedure Depends on the timing, first three klystrons that are ready, will be shipped to Lund (either form Bilbao or from Palo Alto)

NEW KLYSTRONS PROCUREMENT Technical specification (SoW) and administrative documents for 3 new klystrons are ready and call for tender is to be published in June. The delivery schedule is foreseen as below: July18 July19 Oct.19 Jan.20 0m 2m 12m 15m 18m 20m Kickoff Meeting 1st klystron FAT and ship out 2nd klystron FAT and ship out 3rd klystron FAT and ship out Signing Contract Design Review Validation Approvals (SATs)

THANK YOU